Text
_ _ _ _ _ - _ _ _ _
TENNECCEE VALLEY AUTHORITY CHATTANOOOA TENNESSEE 37401 SN 1578 Lookout Place 00T 201988 t
U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk L
Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUO1 AH NUCLEAR PLANT (SQN) - ESSENTIAL RAW COOLING WATER (ERCW)
PUMPHOUSE FOUNDATION AND ERCH PUMPING STATION ACCESS CELLS This is in response to Inspection Report 50-327, 328/88-12, unresolved items 88-12-05 and 88-12-09. An evaluation has been performed by Bechtel North American Power Company on the ERCW pumphouse foundation and pumping station access roadway foundation.
This evaluation report is enclosed.
1 It was concluded that the ERCH pumping station and access roadway cells are structurally adequate and will function as intended under the design loads. However, a limited exploration program for the pumphouse foundation is recommended to augment the available data used in i
evaluating the foundation.
TVA requests a meeting with NRC on either j
November 7 or November 14, 1988, to answer questions and get NRC approval j
for the proposed exploration program.
l Please direct cuestions concerning this issue to K. S. Whitaker at (615) 870-7748.
]
l Very truly yours, f
f TENNESSEE VALLEY AUTHORITY I
Q/b 7,,
i R. Grid ey, Managet Nuclear Licensing anc l
l Regulatory Affairs Enclosure cc:
See page 2 l
gN,\\
8910260392 SS1020 j
PDR ADOCK 05000327 i
o PEC An Equal Opportunity Employer 6
l
l 1
~
! l U.S. Nuclear Regulatory Commission OST 20 B88 1
l cc (Enclosure)-
Ms. S. C. Black, Assistant Director for Projects i
TVA Projects Olvision 1
U.S. Nuclear Regulatory Commission l
4 One White Flint, North 11555 Rockville Pike Rockville, Marylanti 20852 Mr. F. P. McCoy, Assistant Director j
for Itilpection Programs TVA Projects Olvision U.S. Nuclear Regulatory Commission l
Region II i
101 Marietta Street, NW, Suite 2900 j
Atlanta, Georgia 30323
[
1 j
Sequoyah Resident Inspector l
Sequoyah Nuclear Plant i
2600 Igou Ferry Road 4
Soddy Datsy Tennessee 37379
.I l
I i
i t
[
]
i l
l I
?
l 1
l 4
)
I i
I
l ENCLOSURE "Assessment of Structural Adequacy of the Concrete Foundation Cells for the Emergency Raw Cooling Water Pumping Station and Access Roadway" Sequoyah Nuclear Plant J