Forwards Insp Repts 50-254/98-17 & 50-265/98-17 on 980902-1014.No Violations Noted.Inspector Found Significant Room for Improvement in Maint & out-of-svc Activities
ML20155H828
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/05/1998
From: Reynolds S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20155H831 List:
References
50-254-98-17, 50-265-98-17, NUDOCS 9811100295
Download: ML20155H828 (3)


See also: IR 05000254/1998017

Text

- -

- - . .,

-

._ __ -

.

.# p ushq%

NUCLEAR REGULATORY COMMISSION

UNITED STATES

.

E

REGION lli

D

g

801 WARRENVILLE ROAD

2

LISLE, ILLINOIS 60532-4351

4, * * * * * ,o

November 5, 1998

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lil

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT:

QUAD CITIES INSPECTION REPORT 50-254/98017(DRP);

50-265/98017(DRP)

Dear Mr. Kingsley:

This refers to the inspection conducted September 2 through October 14,1998, at the

Quad Cities Nuclear Power Station. The purpose of the inspection was to determine whether

activities authorized by the license were conducted safely and in accordance with NRC

requirements. The NRC conducted routine resident inspections in this period. Based on the

inspectors' findings, overall performance at the Quad Cities station was safe. At the conclusion

of the inspection, the findings were discussed with your staff. TPe inspectors found significant

room for improvement in maintenance and out-of-service activities.

During the period, equipment problems and several maintenance and out-of-service activity

errors had a significant impact on plant operations. Errors on Unit i led to the third reactor trip

in about 3 months.' Problems stemming from preventive maintenance deficiencies led to Unit 2

reactor water level oscillations which approached the predetermined manual trip point.

Problems with the 2B reactor recirculation pump seal required a maintenance outage and the

third replacement of the seal since shutdown from the last operating cycle in February 1997.

Operators performed well at the controls during a number of operational transients. However,

operator lack of sensitivity to equipment problems and poor performance in taking a flow

transmitter out-of-service were considered weaknesses.

No cited violations of NRC requirements were identified.

"

9811100295 991105

,

l

PDR

ADOCK 05000254

l-

G

PDR

l

!

- - - _ _ _

_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ - . . _ _ _

-

4

O. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

Original signed by

Steven A. Reynolds, Deputy Director

Division of Reactor Safety

Docket Nos.: 50-254; 50-265

License Nos.: DPR-29; DPR-30

Enclosure:

Inspection Report 50-254/98017(DRP);

50-265/98017(DRP)

cc w/ encl:

D. Helwig, Senior Vice President

H. Stanley, PWR Vice President

C. Crane, BWR Vice President

R. Krich, Regulatory Services Manager

D. Greene, Licensing Director

DCD - Licensing

J. Dimmette, Jr., Site Vice President

W. Pearce, Quad Cities Station Manager

C. Peterson, Regulatory Affairs Manager

R. Hubbard

M. Aguilar, Assistant Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

W. Leech, Manager of Nuclear

MidAmerican Energy Company

DOCUMENT NAME: G:\\ QUAD \\QUA98017.DRP

To receive a copy of this document. Indicate in the bor "C" = Copy without attach /enci"E" = Copy with attach / encl "N" = No copy

OFFICE

Rlli tZN4

Rlll

_ 15

Rlli

Rlli

NAME

Lerch/tr/co/dp

Ring M6

Reynolds A

DATE

11/5/98

11 (/98

11/r/98

11/ /98

OFFICIAL RECORD COPY

_.. _ o

.

.

__- __.

_..

. . _ .

. _ . _

_ _ _ _ _ _ _ . . _ . _ .

_ _ _ _ . . . _

__.

.

,/

'

.

O

r

O. Kingsley

-3-

(

l

l

!

Distribution:

l

SAR (E-Mail)

RPC (E-Mail) .

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enci

C. Pederson, Rlli w/enci

B. Clayton, Rlli w/ encl

SRI Quad Cities w/enci

j

DRP w/enci

,

!'

TSS w/enci

i

DRS (2) w/enci

Rill PRR w/enct

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS'