ML20155H365
| ML20155H365 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 10/11/1988 |
| From: | Brown H KIRKPATRICK & LOCKHART, SUFFOLK COUNTY, NY |
| To: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| CON-#488-7267 ALAB-902, OL-3, NUDOCS 8810200062 | |
| Download: ML20155H365 (2) | |
Text
y.
h T' C DCORRESPOMU M nor: MET HUMBER KIRKPATRICK & f.Mi@Mf"gg33.g7[-J
' " ~ " ' "
SoUn{ lob 8Y. 9nt Floor exCHAuct rLAct IW M STREET, N.W.
53 STAM ITWT WASHINoToN. D C. 2004$891 3:
'88 OCT 13 P4 :06 142s enjenLL AvtwLt MAMI. FL 33111 MN1 C2 F; luxe gxy 3744 ::
ULEX *CM KL DC L%
JM,4 5. h [
gg gg g nLJCCMA CCa f:$41M 8 8 f.h L
- f!TT384%CH, PA 15H) $m HERBERT H. bro 4 N 441D Jn42 ccd fun October 11, 1988 BY TELECOPIER Mr.
A.
Randy Blough, Chief Reactor Projects Section No. 3B U.S. Nuclear Regulatory Commission, Region I King of Prussia, PA 19406
Dear Mr. Blouch:
I am writing on behalf of our client, Suffolk County, to request your confirmation that the Region I meeting with the Long Island Lighting Company scheduled for October 17, 1988, is cancelled as a result of ALAB-902, which vacated the licensing board's authorization for the staff to issue a full-power operating license for Shoreham.
Please respond by telecopier and as promptly as possible.
Sincerely, Herbert H. Brown cc:
Fabian G.
Palomino, Esq. (by telecopier)
Stephen B.
Latham, Esq. (by telecopier)
Donald P.
Irwin, Esq. (by telecopier)
Edwin J. Reis, Esq. (by telecopier) hgkO2ggo 2
G
)b
(
s 00T 061988
/
No.88-161 U.S. Nuclear Regulatory Commission Recion I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
Long Island Lighting Company Facility:
Shoreham Nuclear Power Station Docket No.:
50-322 Time and Date:
10:00 a.m., October 17, 1988 Location:
Region ! Of fice, Division of Reactor Projects (ORP)
Conference Room, King of Prussia, Pennsylvania
Purpose:
Meeting to Discuss Licensee Schedule and Readiness for Startup Activities at Shoreham Fending Issuance of a Full Power Operating License NRC Attendees:
W. Kane, Director, Division of Reactor Projects (ORP)
T. Martin, Director, Division of Reactor Safety (ORS)
S. Ebneter, Director, Division of Radiation Safety and Safeguards (ORSS)
- 5. Collins, Deputy Director, DRP W. Johnston, Deputy Director, DRS J. Wiggins, Chief, Reactor Projects Branch No. 3, DRP J. Ourr, Chief, Engineering Branch, ORS A. Blough, Chief, Reactor Projects Section No. 3B, ORP P. Eapen, Chief. Special Test Programs, DRS L. Doerflein, Project Engineer, ORP F. Crescenzo, Senior Resident Inspector, Shoreham W. Butler, Director, Project Directorate 1-2, M R
- 5. Brown, Project Manager, POI-2, NRR Licensee Attendees:
R. Youngdahl, President, LILCo J. Leonard, Vice President-Nuclear, LILCo S. Shorupski, Assistant Vice President-Nuclear, LILCo J. Smith, Director, Office of Training, LILCo W. Steiger, Plant Manager, Shoreham J. Notaro, Manager, Quality Assurance, Shoreham C. Devario, Manager, Nuclear Operations Support, Shoreham E. Young 11ng, Manager, Engineering, Shoreham llote: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., October 14, 1988, via telephone call to A. Blough, Region I, at FTS 346-5146 or (215) 337-5146.
Prepared by:
X7andy BT~ n,' Chief Reactor Projects Section No. 3B