ML20155H201

From kanterella
Jump to navigation Jump to search
Forwards Rev 23 to UFSAR for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.Rev Is non-routine Update Incorporating Changes to Technical Requirements Manual,Which Was Added to UFSAR as Part of Improved Tech Specs Project
ML20155H201
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/30/1998
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155H207 List:
References
NUDOCS 9811100021
Download: ML20155H201 (4)


Text

CumEs H. CRUSE Baltimore Gas and Electric Company j, Vice President.

Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 2%57 410 495-4455 October 30,1998 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Uodated Final Safety Analysis Reoort. Revision 23 Enclosed for your use is one original and ten copies of Revision 23 of our Updated Final Safety Analysis l

Report (UFSAR). This is a non-routine update to the UFSAR to incorporate changes to the Technical Requirements Manual, which was added to the UFSAR as part of the Improved Technical Specifications Project.

Some other changes, related to the Technical Requirements Manual or the Technical Specification Bases, have also been included, as well as the List of Effective pages. Please replace the appropriate pages of your copies of the UFSAR with the enclosed pages. The annual revision will be submitted in accordance with 10 CFR 50.71(e).

l l

l l

9911100021 991030 4

[ /h PDR ADOCK 05000317 I

0'3 K

PDRj f

A

\\\\\\

i Docum:nt Control Desk j

October 30,1998 j

Page 2 j

Should you have questions regarding this matter, we will be pleased to discuss them with you.

I Very truly yours, i

N m

',/

gf /

gf e,n STATE OF MARYLAND

TO WIT:

COUNTY OF CALVERT I, Charles H. Cruse, being duly sworn, state that I am Vice President, Nuclear Energy Division, Baltimore Gas and Electric Company (BGE), and that I am duly authorized to execute and file this response on behalf of BGE. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other BGE employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

, U.. 2 Subjeribed and sworn before ny, a Notary Publ'c i and for the State of Maryland and County of l

fJ$1(A4>

,this J $ day of k_ __ AA )1998.

4 I

WITNESS my Hand and Notarial Seal:

Notary Public My Commission Expires:

bI

' Dafe CHC/MRC/dlm

Attachment:

Updated Final Safety Analysis Report, Revision 23 (Original and 10 Copies) cc:

(Without Attachment)

R. S. Fleishman, Esquire II. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector, NRC S. S. Bajwa, NRC R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC

/

, _ ~.

PAGE REPLACEMENT INSTRUCTIONS Calvert Cliffs Nuclear Power Plant Updated Final Safety Analysis Report - Revision 23 Remove and Discard Insert VOLUME 1 List of Revisions LOR-1 LOR-1 General Table Of Contents LEP-GTOC-1 LEP-GTOC-1 i through xxxvii i through xxix Chapter 1 LEP-1-1 through LEP-1-3 LEP-1-1 and LEP-1-2 1-iii and 1-iv 1-111 and 1-iv 1.8-31 and 1.8-32 1.8-31 and 1.8-32 VOLUME 3 Chapter 6 fEP-6-1 and LEP-6-2 LEP-6-1 and LEP-6-2 6-iii through 6-vi 6-111 through 6-vi 6.6-1 through 6.6-7 6.6-1 through 6.6-8 Chapter 7 LEP-7-1 thru LEP-7-4 LEP-7-1 thru LEP-7-3 7-1 and 7-11 7-i and 7-11 7-v and 7-vi 7-ix and 7-x 7.2-3 and 7.2-4 7.2-23 through 7.2-28 7.3-13 and 7.3-14 7.3-27 and 7.3-28 7.5-21 through 7.5-28 A

Italicized entries indicate unequal substitutions. Carefully perform page replacement.

Page 1

l f

PAGE REPLACEMENT INSTRUCTIONS l

Calvert Cliffs Nuclear Power Plant Updated Final Safety Analysis Report - Revision 23 Remove and Discard Insert VOLUME 6 Chapter 14.17 throuch 14.26 LEP-14-1 through LEP-14-11 LEP-14-1 through LEP-14-10 14-xi and 14-xii 14-xix through 14-xxii 14.20-1 through 14.20-89 14.20-1 through 14.20-76 Chapter 15 LEP-15-1 and LEP-15-2 LEP-15-1 and LEP-15-2 15-i through 15-vi 15-i through 15-v 15.0-1 and 15.0-2 15.0-1 and 15.0-2 15.1-1 through 15.1-4 15.1-1 through 15.1-4 l

15.1-9 and 15.1-10 15.1-9 and 15.1-10 l

Figure 15.1.2-1 Figure 15.1.2-1 15.3-1 and 15.3-2 15.3-1 and 15.3-2 15.3-5 and 15.3-6 15.3-5 and 15.3-6 15.3-9 and 15.3-10 15.3-9 and 15.3-10 15.4-1 through 15.4-4 15.4-1 through 15.4-4 15.7-5 and 15.7-6 15.7-5 and 15.7-6 15.7-9 through 15.7-31 15.7-9 through 15.7-32 ltalicized entries indicate unequal substitutions. Carefully perform page replacement.

Page 2

UPDATED FINAL SAFETY ANALYSIS REPORl REVISION SUBMITTAL DATES REVISION DATE O

July 20, 1982 1

March 31, 1983 2

July 18, 1983 3

July 16, 1984 4

July 15, 1985 5

July 2, 1986 6

August 28, 1987 7

March 31, 1988 8

August 24, 1988 9

August 18, 1989 10 October 17, 1990 11 July 19, 1991 12 April 21, 1992 13 July 17, 1992 14 November 30, 1992 15 December 10, 1993 16 June 24, 1994-17 November 18,.1994 18 November 17, 1995 19 April 1,1996 20 February 5, 1997 21 November 4, 1997 22 August 28, 1998 23 October 30, 1998 CALVERT CLIFFS UFSAR LOR-1 Rev. 23

.