ML20155F729
| ML20155F729 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/30/1998 |
| From: | Conte R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20155F732 | List: |
| References | |
| 50-277-98-301OL, 50-278-98-301OL, NUDOCS 9811060101 | |
| Download: ML20155F729 (3) | |
See also: IR 05000277/1998301
Text
. _ _ _ . _ _ _ . _ . _ _ . . _ -
_
h
J'
'#
October 30, 1998
,
i
.
l
)
Mr. G. Rainey
President
PECO Nuclear
Nuclear Group' Headquarters .
. Correspondence Control Desk -
P. O. Box 195
Wayne, Pennsylvania 19087-0195-
SUBJECT: EXAMINATION REPORT NOS. 50-277/98-301 AND 278/98-301 (OL)
Dear Mr. Rainey:
During the period of September 14,1998 to September 22,1998, the facility and NRC
,
administered initial examinations to 12 employees of your company who had applied for
licenses to operate the Peach Bottom Atomic Power Station, Units 2 and 3. The
examination was prepared by your staff using the Examination Standards, NUREG 1021,
'
interim Revision 8, as guidance. All applicants passed all portions of the examinations and
received licenses. The applicants were well prepared for the examinations..
The initial submittal of the written examination was unacceptable. We determined that
28% of the written examination questions were inadequate for several reasons as noted
herein. However, your staff now appears to understand our expectations as embodied in
the Examination Standards. Your cooperation with us in this important matter was
.
appreciated,
j
Should you have any questions regarding this information, please contact
i
Carl Sisco of my staff at (610) 337-5076 or me at (610) 337-5183.
Sincerely,
j
J
Richard J. Conte, Chief
,
Operator Licensing and
j
Human Performance Branch
~
'
Division of Reactor Safety
4h1
Docket Nos. 50-277;50-278
4
i
I"
"
9811060101 981030
ADOCK 05000277
V
,,
.
'
,,
.
.__
_
_ , _
.
f
.l
'
.
Mr. C. Rainey
2
.q.g Wl3ncl: w/ Attachments 1-4:
L. M icEntee, Acting Director - Training
cc w/en'l: w/o Attachments 1-4:
J. Hagan,3/ ice President, Nuclear Station Support
J. Doering, Vice President, Peach Bottom Atomic Power Station
. M. Warner, Plant Manager, Peach Bottom Atomic Power Station
G. D. Edwards, Chairman, Nuclear R3 view Board
R. Boyce, Director, Nuclear Quality Assurance
A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
G. J. Lengyel, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President and General Counsel
T. M. Messick, Manager, Joint Generation, Atlantic Electric
W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Levin, Acting Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
Mr. & Mrs. Kip Adams
- Commonwealth of Pennsylvania
State of Maryland
TMI- Alert (TMIA)
,
f
,-
)
.
i
1
.
Mr. G. Rainey
3
Distribution w/ encl: w/ Attachments 1-4:
DRS Master Exam File
PUBLIC
Nuclear Safety information Center (NSIC)
Distribution w/ encl: w/o Attachments 1-4:
Region i Docket Room (with concurrences)
J. Wiggins, DRS
L. Nicholson, DRS
C. Sisco, Chief Examiner, DRS
C. Anderson, DRP
D. Florek, DRP
R.Junod,DRP
NRC Resident inspector
DRS File
Distribution w/ encl: w/o Attachments 1-4: VIA E-MAIL
B. McCabe, OEDO
Inspection Program Branch, NRR (IPAS)
M. Thadani, NRR
B. Buckley, NRR
R. Correia, NRR
M. Campion, ORA
DOCDESK
i
DOCUMENT NAME: G:\\0LHP\\SISCO\\PB98301.0L
To receive a copy of this document. Indicate in the box:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No
copy
OFFICE
Rl/DRS
Rl/g ,
R/DRS
o ,j l
l
NAME
CSisco CE\\
QAyM{grfq
RContefV
DATE
10/27/98
11)/2J98
108v/98
10/ /98
10/ /98
i
OFFICIAL RECORD COPY