Forwards Info on Drawing Revs Requested in . Documents That No Drawing Revs After Those Listed on Last Renewal Resulted in Any Changes to Packages.Other Related Info Encl
ML20155F377
Person / Time
Site: 07106678
Issue date: 09/26/1988
From: Mauck C
ENERGY, DEPT. OF
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
24793, NUDOCS 8810130239
Download: ML20155F377 (18)


Text

RETURN TO Q, ayg 7/ -cq8' 1

'1 Department of Energy c.

ashington, DC 20545

._/

g gg%)

pteger 6 S

b gCT O

-ll

&f 0

r#$#

L v M # ['?

ocT Oh g%Ep );

T 9

g-er#

b"'9p@tTNsb 4

C s

Mr. Charles E. Mac

  1. 5Sv,p y i_"

Chief, Transportation Branch s

Division of Safeguards an:1 Transportation, " ':

Nuclear Regulator / Cc=tission Washington, CC 20555

~

Dear Mr. MacConald:

This letter concerns DOE's application for renewal of Certificate of Corpliance 6678 for Mcdel I.P-50 dated August 29, 1987.

The inferration en the drawing revisions you reqJested in ycur letter of July ?',, 1988, is encloseo (Transmittal le- " to G. W. May from S. K.

Tord y dated 9/12/68, Internal Memo to S. K

  • r by frcm G. Cadelli dated 9/12/88 and Internal Me o R. A. Ranne.

3 J. E. White dated 5/25/88). These papers docunent what we pres usly reported to you that nene of the drawing revisiens after these listed en the last (9/6/83) renewal of d e certificate of Cerpliance resulted in any changes to d e pacPages.

Cadelli's zero describes each drawing revisien that was net covered en the last rer.ewal.

The first two entries for each drawing in the tables in Cadelli's Mero are 1) the date the drawing was originally issued and

2) the date of the last revisien listed en the last renewal. The reraining emies describe each drawing revision that was net covered by the last renewal.

Rarr.els' rero describes the change rade to the packagine 6rawing centrol system to prevent reoccurrence of this incident.

., v ;Ning dravires have been sta. ped "FIVISIO::S PECIPI DESIGN AGnir

<?~

' sacvAI.. "

This sta.p identifies the original as a Qaality Asr..+

o M cent that is kept under leck and key and can he reccved fre a the /ault enly by

(

qaalifled packaging engineers er with the written permissien of Super /ision respcnsible for the pacP. age design grcup at savart.ah River.

,.<s i,.,'

eg0TdsoWdbo cw o enu I

'c

' #7'i3

-If you reqaire any fure.er inferration, please call re (353-5394) or Ecb Towell (353-5697) of r.y staff.

Sincerely, s

/

J Charles J.

&, Chief Packaging Ce:tification Staff office of Security Evaluatiens Defense Progra s 3 Enclosures CC W/o enc'Js A

W. E. Wisenbaker, SR G. W. May, SR R. \\. P.:rnels, DuPent-SR G. A. Cadelli, DuPont-SR

i Septader 2 6, 1988 i

Mr. Charles E. MacDonald Chief, Trarsportation Branch Division of Safeguards and Transportation,12GS liuclear Regalatorf Ccmission Washington, DC 20555 i

Dear Mr. MacDonald:

i This letter concerns DDE's application for renewal of Certificate of Cc:711ance 6678 for Model 12-50 dated August 29, 1987.

The info =ation on the drawing revisions you requested in yacr letter of July 21, 1988, is enclosed (Trans:nittal letter to G. W. May frcm S. M.

Tochy dated 9/12/88, Internal Me::o to S. K. Fo=by from G. Cadelli dated 9/12/88 and Internal Mero R. A. Ruraels to J. E. khite dated 5/25/86). These papers document khat we previously reported to you that ner.e of the drawing revisions after those listed on the last (9/6/83) renewal of the Certificate of Cc:@liance resulted in any changes to the packages.

1 Cadelli's reno describes each drawing revision that was not covel.ed on the last renwal. The first two entries for each drawing in the tacles in Cadelli's Memo are 1) the date the drawing was originally issued aM

2) the date of the last revision listed on the last renewal. 'ite rerainirs er.tries describe each drawing revision that was not ecvered by the last renewal.

Runnels' remo describes the change rade to the packaging drawing control syste:n to prevent reoccurrence of this incident. All packaging drawings have been sta ;*1 "REVISIO! S RECCIRE DESIGi AGDiCY (EED) AFFR7,'AI.."

This sta:p identifles the original as a Qaality Assurance document that is kept under lock and key and een be removed from the vault only by gaalified packaging engineers or with the written pemission of Supervisien responsible for the,aackage design group at Savaraah River.

l

2 If you regaim any further infomation, please call me (353-5394) or Bob,Tcsell (353-5697) of my staff.

Sincerely, Jim Leonard for i

,,,,,,,c,,

DP-4."'

Charles J. Mauck, chief Packaging certification Staff g,,iig;f office of Security Evaluatiens BIowell Defense Progrars can r M I 9/2 b/88 !

3 EDClCSureS mio avveok r

D R w4.1...

cc w/o encls:

"" " S *

[,'ag (

i W. E. Wisenbaker, SR G. W. May, SR 9/ M /8E R. A. Runnels, DuPont-SR G. A. Cadelli, DuPont-SR f

winALS se gavi ' '

  • avo sv ot DP-4.1:BTowell:mbg: computer:66781HRC:3-3954:9/23/88 agg;W )

1 Distribution osi * * * '

l... Addressee, w/encls, I

mia er os 2... Subject File Docket 87-13-6678 3.. 0SE Rdr WWdsd I

4...dp mail facility i

5...mauck rdr l

6-9.ce's w/o encis, as stated q

RTG. S Yie.ob r

WNGid l J

ate.svu.ot j

wtatssa Datt 1

av..

o6 ;

1, unaLasa n

t i

I DATE i

ato svuoot 1

l wriadse DATE

)

I

    • **' co'.mxt n witas ensen e un.taa s. l 0FFICIAL FILE COPY 00E F 1328.10 M7) l 4

h

i.....

$? *

  • B: sis N). EED880822 NRC Trenernittel, LP.50 Retention Period 15 Years E.1. ou PoNT oc NcMouns E COMPANY

. essos asse ATOMIC ENCROY DIVISION SAVANNAH MlVEn LABORATOaY AiKsN, Sou1H CanOUNA 299%-CJQ1 sinx eittri.nm fr. Etristan av wra ou Septemoer 12, 1988 Dr. C. W. May*

Quality and Materials Assurance Division Savannah River Operations Office U. S. Dopertment of Energy P.O. Box A Aiken, SC 29801

Dear Dr. May:

RE.SPONSE TO N1] CLEAR REGUIATORY COMMIf IION (NRC) REQUEST FOR INFORMATION ON LI 50 PACKAGE.

R F.F:

DOE Letter of July 28, 1988, C. J. Mauck DOE DP 4.0 to W. E.

Wisenbaker DOE /SR.

In response to tha NRC request (Ref) for information on drawing revisions since the last cart!fleate approval, attached is a completo listin5 of tevisions made to the drawings in Safety Analysis Report for Packaging (SARP) DPSPU 74 124 5, Rev 2, 4/88. The SARP (Rev. 2) is part of the application to NRC for renewal of certificate of compliance #6678.

Most of the 1988 revisions cancelled previous revishne that were made in anticipation of a future prneurement, however no procurement was made after 1968 with these original drawin5s.

If any additional information la needed, please contact the following members of my staff, Rick Runnels (5 2692) or Georgo cadelli (5 2278).

Sincerely, S. K. Formby, upo.intendent Equipment Engineerin5 Division Savannah River Laboratory GC:bbj

  • Attachment CC:

See attached distribution list ya+g c;cyct2;

  • e
  • e c b'3% f W W ad**te 20420%

Fwowt oost/eteCO

EF40-lic ::: 0 ~ M@X ve m

IECK3! CAL DIVISION Scsis N3. EED880821 SAVANNAA RIVER 1ABORATORY NRC Response, LP 50 notention Period 15 years Sep terber 12, 1988 10:

5.K. Formby, 703 A IROM:

C. Cadelli. 730.A PESP3NSE TO NUCLEAR REGUIATORY COMMISSION (NRC) REQUEST FOR ADDITIONAL INFOAMATION ON LP.50 PACKAGE (DOCKET 87 13 6678).

REF 1) DOE letter of July 28, 1988, C. J. Mauck DOE DP.4.0 to V. E. Visenbaker DOE /SR.

F.ET 2) NRC Docket 871 6678 In response to the NRC request (RET 1) for information on the content of drawing revisions (since the last certificate approval), this document explains each drawing revision made after the revision listed in the certificate of compliance.

The revised LP 50 Safety Analysis Report for Packaging (SARP) included with the request for NRC certificate *6678 renewal (RET 2) dated May 24, 1988 included drawings that were revised since the last certificate renewal. Most of the 1988 revisions were made to cancel trevious revisions that were made in anticipation of future procurement.

Eovever, the procurement did not take pit.ce with these drawings.

(A procurecent in 1979 was ande using new drawings and these 1979 containers are not being used for shipments.) The last LP 50 purchase using the cristnal drawings was made in 1968.

The above mentioned revisions (that vere never used for labrication) included improved materials and increased quality ass,urance for velding and specific inspection requirements. Some of the 1988 revisions corrected previous errors and clarified items that may have been subject to etsinterpretation.

The LP 50 container first built in 1957 was equipped with Futten Sylphon valves (Dravir.g *S4 2 147 and $5 2 1693). As improved valves were developed in 1764, the LP.50 was refurbished with Hoke valves (as shown in Drawing

  • S5 2 2168A) is tt.e containers were returned to SRP.

The LP 50 has been a reliable and important container for the shipment of larga quantities of low pressure tritium gas. Several drawings (sS4 2147 and 35 2 1693) show valves that were used in the past (Pulton Sylphon) and i

not used in current normal practice are included in the SARP to account for all packages that vere loaded and shipped at SRP. These valves are the older r.eedle valve designs but are fully servicable and are leak checked to the same rigid requirement as the never globe design Hoke valves. No changes to i

the LP 50 containment vessel have taken place except for valve replacement to n.tintain the container in the "as built" condition.

Each revision made after the revision listed in the certificate of compliance vill be discussed in the following format:

~

TO'

~

P.03 SEP-2?-19?3 13t30 Fr<t1 Drawinz *S$.2 $733 Revision Date of Egber.

Revi> ion Content 0

1/'t0/72 Criginal t

14 3/7/78 Approved in NRC certificate #6678 17 7/10/78 Revised identification name plate ERDA to Dog 18 7/10/78 Revised identification name plate, added KG weight 19 10/7/78 Revised name plate I

20 10/7/78 Tracing voided in anticipation of purchasing a

'i 4

new container desi n with different drawing 5

number.

21 3/8/88 Added (rawing control stamp for improved QA 22 3/8/88 Added r ference drawings for clarification 23 3/8/88 Added reference drawings for,larification 24 3/8/88 Reinstated drawing to cancel Rev 20 25 3/8/88 Deleted note stating drawing is voided to cancel Rev 20 i

t-26 3/8/88 Adted note to ieprove conditions for druin i

storage l

braving es5 2 5734 l

l 0

1/10/72 Original f

9 11/14/74 Approved in MItn reveit'icare a6678 1

10 5/15/79 Tracing voided in anticipation of purchasing a new container design with different drawing number i

11 3/2/88 Added note to explain modification required i

for use with the ' flat bucket" cover on the secondary container 12 1/2/88 Added reference drawing for claria ion I

i 13 3/7/88' Reinstated drawing to cancel Rev 10 l

i 14 3/7,'J1 Added drawing control stary for improved QA i

J 1

2 j

l 4

.-,,---'r*

-v--

iv-~---*-

- - -, - - - - - - - - * = - - - - - - - - - - - - - - - - - - - *

=---r-

SEP-10-1}is DtV8-~KiieR ve

~

v.wa

,+

Drawing *SS 2 5735 0

1/10/72 original 1

2/22/72 Approved in NRC certificate #6678 2

9/18/78 Design shange to remove 3 holes (for approved stud hoice:s) in done type spacer to simplify alignment of lid and lover part of secondary

+

container. Removal of studs eliminates potential for penetration desage to the containment vessel.

(The chan5e vould not affect the ability of the package to avet 10 CTR part 71) 3 9/18/78 Same as Rev 2 4

9/ 8/78 Same as Rev 2 5

9/18/78 same as Rev 2 6

9/18/78 Remove dimensions for Rev 2 thru Rev 5 7

9/18/78 Same as Rev 6 8

9/18/78 Remove notes for Rev 2 thru Rev 5 9

9/18/78 same as Rev 8 10 9/18/78 Added reference drawing for clarification 11 3/16/88 Added drawing control att.mp for improved QA Drawina e54 2 596 1

0 7/14/72 Original (Approved in FRC certificate #6678) l 1

3/22/88 Added drawing control stamp for improved QA Drawina es5 2 146 0

10/3/56 Original 58 2/7/78 Approved in NRC certificate #6678 59 7/12/78 Revised leak test note to reference original specification with equivalent units of atnes cc/sec 60 7/12/78 Added note requiring certification of the leak test results for future fabrication 3-

e-~=-

-~_ ~ -.

P.05 SEPric 19M 0 171 FRO 1 TO 1

61-

' 9/14/78 Design change on secondary container to remove 3 studs from dene lid to aid in alignment with lower section of secondary container, also prevents possibility of penetration darnage to j

primary containert (This change is in effect) i 63 9/14/78 Ssse as Rev 61 l

43 9/14/78 Same as Rev 41 f

l 64 9/14/78 Changed wording in note 2 from shall to must i

]

65 9/14/74 Added note to ev, plain that:

1) several valves l

are in present use on the LP 30 and referenced the applicable drawings and 2) Cajon 4VCR 7

connectors instoad of compression seal j

connectors would be on all shipments from SRP, after 3/1/77 1

l 66 9/14/78 Note on required welding procedure removed j

(This change in preparation for new l

l fabrication) l l

67 9/14/78 Deleted reference drawings of older valves in j

preparation for new fabrication 68 9/14/78 St.se as Rev 67 (9

9/14/78 Same as Rev 67 l

j 70 9/14/78 Added reference drawing of lid spacer for j

clarification l

71 3/8/88 Design change to remove oldet hold dem system I

1 of primary container with improved spacer j

shown in drawing *$5 2-5735 Rev 9 (This change is in effect) 72 3/8/38 Same as Rev 71 73 3/4/88 Added drawing control stamp for improved QA 1

{

74 3/8/88 Reinstated reference drawings to cancel Rev 67 i

75 3/8/88 Reinstated reference drawings to consel Rev 68 1

6 69 I

76 3/8/88 Same as Rev 75 i

77 3/8/88 Same as Rev 75 i

j 78 3/8/s4 Added reference drawings for current l

replacement Hoke valw 79 3/8/88 Added reMance drawings for current Cajon j

connectica fitting I

\\

.k e

SEP-20-1M0 12:32 FRCri TO P.06 Drawing oSS.2 187 ori,inal 0

10/3/56 t

22 11/11/74 Approved in NRC certificate ad678 23 3/31/78 Design change to add greater thickness to top and bottom heads of containment vessel in anticipation of new procurement (h is change not in effect) 24 3/31/78 Some as Rev 23 25 8/4/78 Added note to increase QA by requiring material certification in antie' nation of new procurement.(This cha a not in effect) 26 8/4/78 Added note to increase QA by requiring added weld inspection requirements in anticipation of new procurement (This change not in effect) 27 8/4/78 Deleted obsolvte compression fitting parts on valve since Cajon fitting is is use after 3/1/77.

(This chan5e is in effect) 28 t/4/78 Sam as Rev 27 29 8/a/78 Same as Rev 27 30 9/18/78 Note on ASME code requirements, date changed i

from 1974 to '.977 in anticipation of nov procurement (This change not in effect) 4 31 9/18/78 Added dotati of taper of head to cylindor wall l

in anticipation of new procurement (This change not in effect) 32 9/18/78 Design change for use of improved satorial in i

anticipation of new procurement (This change not in effect) l 33 9/18/78 Design c*nange to remove 3 studs in done type j

spacer of secondary contaiaer to simplify alignment of lid and lower part of secondary container. This change also prevents the 4

possibility of penetration dacage to the priuary container. (This ch' age is in effect) i 34 9/18/78 Same as Rev 33 35 9/18/78 Same as Rev 33 36 9/18/78 Same as Rev 33 37 9/18/78 Design change to delete the obsolete stud hold down arrangement explained in Rev 33 5

SEP-20-1953 13 32 FROM VO P.07 38' 9/18/78 same as Rev 37 39 9/18/78 Added reference drawing for clarification 40 3/22/88 Changed surface finish of secondary lid back to "as built" condition 41 3/H/88 same at Rev 40 but applies to lower part of Jacondary container 42 3/22/88 Changed head thickness back to "as built" condition cancell hg Rev 24 43 3/22/88 Satie as Rev 42 44 3/22/88 Changed material back to original fabrication, i

this is an obsolete part that has been voided 45 3/22/88 Deleted weld inspection note of Rev 26 to return to the "as built" condition l

i 46 3/22/88 Deleted material certification requirement of Rev 25 to return to "as built" condition j

47 3/22/88 Deleted note of Rev 30 to raturn to "as built" condition i

48 3/22/88 Deleted note of Rev 31 to return to "as built" I

condition 49 3/22/88 Material change to "as built" condition to l

cancel Rev 32 t

50 3/22/83 Deleted detail of Rev 31 to return to "as i

l built" condition 4

l l

51 3/22/88 Added drawing control stamp for improved QA l

r 52 3/22/88 Added explanation of revisions and referenced l

10 CFR 71.13a(1)

I 2

f 1

33 3/22/88 corrected drawing to reflect the "as built"

]

top fitting l

Drawina eS4 2 633 (Reoision 1 of this drawing is the improved and only valve design shown in the SARP of 4/78.

Present LP 40 containers do not have this valve configuration installed. Negotiatione with Hoke Inc. are in progress to fabricate this v.1ve for future valve replacement on the LF.50 container. The socket fillet veld between container and valve will be initially done manually u til automatic machine welding can l

be developed.

In either case the veld.111 be fully inspected as J

described in the SARP.

of.

j

--.. _,i

SE 5C-1N[33d! ~ FROM 9@ ~

~

p.hg 0

8/16/76 Original 1

2/7/78 Approved in NRC cettificate #6678 2

7/7/78 Added weld inspection r$quirement for improved QA 3

7/7/78 Same as Rev 2

{

4 7/7/78 Added material certification requirements for improved QA 5

7/7/78 Added requirement for vendor to provide

{

certification of acceptable leak test results for improved QA 6

7/7/78 Added weld inspection re1uirement to meet l

current ASME code for improved QA

]

7 9/15/78 Clarifies drawing dimensions 1

8 9/15/78 Same as Rev 7 9

9/15/78 Sane as Rev 7 13 9/15/78 1.eak test requirements are referenced to a more detailed drawing 11 9/15/78 Assembly cleaning note deleted to be included i

]

in purchase specification j

12 3/10/88 Added dimensions to clarify drawing I

l 13 3/10/88 same as Rev 12 l

la 3/10/88 corrected item descriptian i

e 15 3/10/88 valve replacement to be according to current ASME code i

I 1

i 16 3/10/88 Added reference drawing to clarify leak requirement during valve replacement.

4 a

l 17 t/10/88 Added drawing control stamp for improved QA i

l prawing Figure 4 of DuPont Report DF8FV 'a 124 5

)

1 4/01/78 Apprcved in NRC certificate 66678 I

J This drawing was redrawn from vendor orawin5 It is to be used for i

reference only and'shows the older Fulton Sylphon valve, obsolete

]

hold down ring, and flat bucket type secondary lid. No revisions were nade to this drawing.

]

l 7

1

-c---.

,---n

SEF-30-19M 13:33 FR$1 TO P.09 The following drawings were not included in the previous Safety Analysis Report for Packaging (OPSPU 74 124 5, Rev 1, 4/78) and are included in the Rev 2, 4/88 revision for reference and to describe older configurations of the IP.50 container.

Drawinz_=54 2 147 0

1/9/56 Original 1

11/6/74 Older style valve 2

11 11/6/74 Older style valva 12 11/6/74 Older style valve 13 11/8/74 Older style valve 1

14 2/29/88 Added drawing control stamp for improved QA 15 2/25/88 Added note on date this valve last used i

provinA 55 2 1695 j

0 2/22/63 Original 1

5/27/63 Older style valve f

2 5/27/63 Older style valve i

3 5/27/63 older style valve 4

2/29/88 Added note on date this valve last u. sed

[

i 5

2/29/88 Added drawing control stamp for improved QA i

Drawina 55 2 2168 (This drawing describes the Hoke valve configuration presently used (55 2 2168g) for replacement valves.

Drawing $5 2 2168A shows the original Hoke valve (Ty.445 Mod 4) with older compression fitting.

Carrent valves use the Cajon fitting in place of the compression fitting) 0 4/16/64 Criginal 1

5/10/64 Added valve identification for clarification 2

8/12/76 Revised title to include the Hoke valve with Cajon fitting butt welded to valve tube

]

(55 2 21685) 8

EEF-M H ??? 23:34 FROM TO P.10 3

8/12/76 Added reference drawing for clarification 4

8/12/76 Added Hoke valve with Cajon fitting which replaced the older compression fitting of Rev 0 shown in SS-2 2168A 5

8/12/76 Added detail showing chill ring between veld and valve body 6

8/12/76 Added instructions for using chill ring during welding 7

2/29/88 Clarified valve placement during weldin5 i

8 2/29/88 Same as Rev 7 9

2/29/88 same as Rev 7 10 2/29/88 Removed reference to obsolete detail 1, since the improved maintenance procedure no longer requires this chill ring design l '.

2/29/88 Clarified the requitement for stainless steel material for Cajon parts 12 2/29/88 Clarified note on repiscement valve model nuaber 13 2/29/88 Clarified that several models of Hoke valves have been used 14 2/29/88 Created new view of container top sesembly showing the replacement valve and alio.rable socket depth 15 2/29/88 Added drawing of new cht11 block for use in welding on valve body 16 2/29/88 Clarified chill block installation on valve body by using thtab screws 17 2/29/88 Added reference drawins for clarification 10 2/29/88 Removed note for old chill ring and welding information,added improved QA welding procedure and required welding inspection 19 2/29/88 Added drawing control stamp for improved QA 20 2/29/88 Corrected and clarified drawin4 items 21 2/29/88 Same as Rev 20 22 2/29/88 Clarified drawing and added welding reference 23 2/29/88 Clarified the required weld to be done by valve vendor 9

2

~

~

24 2/29/88 Same as Rev 23 25 2/29/88 Corrected Cajon item description 25 2/29/58 Removed obsolete chill ring of Rev 10 27 2/29/88 Replaced references to obsolete welding procedures with improved current practice 25 2/29/88 Same as Rev 27 29 2/29/88 Added more detailed welding inspection requirements for improved QA CC:

M. J. Green. 235.H D. L. Hayes, 215.H J. R. Pelfrey, 235.H M. R. Caverly, 235 H J. M. Terrell. 730.A R. A. Runnels 723.A C. C. chalfant. 730 A

$RL Records 773.A EED Files 730 A Basis No EED880821

!*RC Response. LP 50 Retention Period 15 Years 10 TOTAL P.11

~

TECKN; CAL DIVZSION SAVANNAM RIVI.R IABORATOR't May 25, 1988 To:

J. E. WHITE, 703-43A FRON:

R. A. RUNNELA, 723-A CONTROL OF SHIPPING CONTAINER DRAWINGS (REVISED)

Reft Nemo, E. G. Caveness to T. R. Coughenour, 9-12-85 Federal Regulations passed in July 1978 require shipping packages containing radioactive materials to meet quality assurance criteria specified in Federal Regalation 10CFR71, Subpart M.

Control of package design is one of the criteria.

The original design of each package is supported by a safety Analysis Report for Packages (SARP), which is approved by Du Pont management, reviewed by DOE-SR, and licensed by Dot-HQ.

A?) revisions must be controlled like the original design, preferably by members of the shipping Container Development Group of Equipment Engineering Division (RED) who developed the original SARP.

In response to these repirementa you l

provided separate storage for shipping container drawings.

Access to shipping Container drawings should be limited to the i

following personnelt j

i

  • S. X. Formb G. Cadelli t
  • J. M. Ferre 1
4. G. Chalfant i
  • R. A. Runnels R. N. Towell
  • L. Williamson M. W. Van Alstine j
  • J.

C. Anderson J. W. Wong ii L

)

  • Can authorise in writing withdrawal by another person, j

1 RAReahp j

I CC:

J. F. Sabino, 703=A S. K. Fornby, 703=A J. M. Ferrell, 730-A G,. G. Cheltant, 730-A s

1 J. Taylor, III, 730-A G. Cadelli, 730-A N. N. Van A1stine, 730-A J. W. Wong, 730-A l

1 L. Williamson, 723-A i

}

J. C. Anderson, 730-A f

I m

m em mi- -m

.-e m,.,f>.xr-,~7.;. w g,,

g,

,3._.....,.

ft.:.

s..

?-

I;

  • L e

== = o=a-3 m m,m.m

.=x u. =,u

--,ar s.w.m o m

T.

. k.

1 F.

V.

' %e.

OF L

k 1

1

.. f acc:-..zas.m 57 m emsaw(4.*se mi i.

umimon..

v.amm ma== ====cn, --m

,y n,

l

/

kL 1.WS &YW54bi(Me 5 '

U. mi. m '

=**m's* *==,.m i 4

f ana R.EYSONS REQUIRE s, = =

r DESIGN AGENCY (EIR APPROYAL l

S5-9-5733-

.s

.e..

l g

E & I!38885 ODIET CamuRIES E. L 35 P9ff M WREstE3 A 44, h6A lG

~

c

-m 8

.=

-==-w 3.

f u

u.,--

CL Wed 9 ~ 171 M51-;g.,3-

4 l

~b 00CKET !;0.

CONTROL NO.

.hbh3 Ph,.u[d _/

b RATE Of 000.

7 00E kCa O

N Ibb FCui.___ _ _

FOR

/

FCU LPOR _

i la E REF. _/

i i

SMEGJ A03 fCTC OTHER. _ '4

~

DATE /O !/ hh

!!i!TI AL j

)

i j

I 1

i I

J 1

1 l

t 1

i i

i I

1 I

i

_