Requests Clarification of Whether to Renew,Resubmit or Accept CPPR-123 Matl for License R-92 Activities.Anticipated Fuel Load Date for New Triga Facility Is Nov 1987.Current Facility Will Be Dismantled Upon Completion
ML20155F364
Person / Time
Site: 07100535
Issue date: 03/04/1986
From: Bauer T
TEXAS, UNIV. OF, AUSTIN, TX
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
26587, NUDOCS 8604210481
Download: ML20155F364 (2)


Text

RETURN TM 396-55 Pm

'7/-d5_~3[

geg COLLEGE OF ENGINEERING 02.1 h.THE UNIVERSITY OF TEXAS AT AUSTIN q

e%

y.<

)3 g

y */

Mw_.9/

Departmentof AiechanicalEngineering NuclearEngineeringProgram Austin, Texas 78712-(312)471-3136 v

March 4, 1986

,,c g co pocs00 q

Hr. Charles Mcdonald upKC gR11 g y [8 Transportation Certification Branch p

Division of Fuel Cycle and Material Safety, NHSS' a Nuclear Regulatory Commission Washington, D.C.

20555

\\

p G j g

Dear Mr. If cDo nald The University of Texas is presently planning to con-struct (CPRR-123) a TRIGA reictor facility (docket #50-602)

~

at the Balcones Research Center approximately 8 miles from the present licensed location (docketcf50-192, license R-92).

Assuming funding ap' proval' expected in April and a construction time of 18 months ~ started in' June, a projected fuel shipment date would be November 1987.or later.

At that time 151 TRIGA elements in four shipments are to be transferred from the present facility (docket #50-192) to the new facility (docket #50-602).

The present facility will be subsequently dismantled (see docket #50-192).

Although the owner, oper'ator and personnel for the two facilities will be the same, the technical requirement for the shipper to maintain a QA plan will require the amendment of the current approval (as part of docket #50-192) or a new applicatiom It should be noted that the docket #50-602 application includes the approval of a QA program that will be applicable to that license when 1s-sued.

Since we do.not anticipate any shipments until the late 1987 time frame, the immediate renewal of the current approval is not necessary.

However, your help in determin-ing the most effective approach, i.e.,

renewal, resubmit-tal, or acceptance of docket.#50-602 material for docket

  1. 50-192 activities, would.be appreciated.

Sincerely, S

86 42 4

0 35 Dr. Thomas L.

Bauer PDR Assistant Director /Supervit.or C

Nuclear Engineering Teaching Lab g ry TLB:bjm

/2// #f d t

fT cc:

Dr. Dale Klein W w its l

Dr. Hugh Walls A, M.s - g, p

[j""

((

Mr.

B.J. Broadus( W L o

,y, (2w'l i fna 3;by/62

e 7/-65.3[..

ooc m vo.

cournoi. no.

34Sf7 DATB 0F D00.

- b 8k[f[

DATE RCVD.

[Y//(([

FCUF PDR FCAF LPDR Wi I&E REF.

RfUR SAFEGUARDS FCfC OTHER DESCRIPTION:

is~'

L w k o 72ra4 m &~ M &-

/-

r asha/76 wimt M

/~/

mummi mmini i i i s