ML20155F188
| ML20155F188 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/30/1988 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8810130178 | |
| Download: ML20155F188 (1) | |
Text
- _ _ _ -
_.,~
.a Georg a Fbnet Compaar fbst Of'<e Oos 282 l
?
Waynesboro Georg a 30830 I
}
Teteorcre 404 %4 c//,1 f
e 404 T24 8114 i
So#ern Compar y Serv.c.1 inc 1
i ftst Omce Bos 2625 8 em ngram, Mabama 35202 l
VOgtie Project 1e'ephore 20$ 870 6011 September 30, 1988
(
a i
4 i
U.S. Nuclear Regulatory Commission 1
ARN:
Document Control Desk Files X7BC35 i
l j
Washington, D.C.
20S55 Log GN-1494 1
PLANT V0GTLE - UNIT 2
(
NRC DOCKET NUMBER 50-425 f
CONSTRUCTION PERMIT NUMBER CPPR-109 i
5#.R CONF;RMATORY ITFM 26t OVERRIDE OF ISOLATION SIGNALS
[
r I
i i
Gentlemen:
I I
i Supplement 4 to the Vogtle Safety Evaluation Report,Section I
7.J.3.8 concluded that confirmatory item 26 was resolved for Unit i
l 1.
This confirmatory item concerned the redesign of the reset / override circuitry for several instrument channels wh*ch j
provide isolation signals so that each reset / override switch would affeet only a single instrument channel.
l l
GPC has reviewed the Unit 2 design and concluded that it is the 9
same as the Unit i
design accepted in Supplement 4.
The I
l installation of this circuity has also been completed in Unit 2.
This should allow the resolution of confirmatory item 36 for
{
Unit 2.
If your staff requires any additional information, please do not hesitate to contact me.
l Sincerely, i
\\
94.d A l
J. A.
Bailey l
{
Project Licensing Manager i
JAB /sem 1
l xc NRC Regional Administrator J. B. Hopkins (2) f l
NRC Ren!Sent Inspector G.
Bockhold, Jr.
l P. D.
Rice J.
E. Joiner, Esquire j
J.
P. Kane R. J. Goddatd, Esquire 1
R. A. Thomas R.
W. McManus B. W.
Churchill, Esquire Vogtle Project File j
8810130178 800930
'{p PDR ADOCK 05000425 g
PNV l
\\
I 1-
. _ _ _ _,,