ML20155F086
Jump to navigation
Jump to search
| ML20155F086 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 03/27/1986 |
| From: | Cranston A SENATE |
| To: | NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA) |
| Shared Package | |
| ML20155F083 | List: |
| References | |
| NUDOCS 8604210146 | |
| Download: ML20155F086 (1) | |
Text
-
- abm ase' March 27, 1986 To: Congressional Liaison Nuclear Regulatory Commission 1717 H Street, N.W.
Washington, D.C.
20555 Enclosure From:
Mr. Jim Adams (No Enclosure)
Post Office Box 10!_
Trinidad, California 95570 Re: Mr. Adams is concerned about the delay in the EIS for the decommissioning of the Humboldt nuclear power plant.
Originally the EIS should have been completed several months ago.
What is the reason for delay and when does NRC expect it to be completed.
I forward the attached for your consideration.
Your report, in duplicate, along with the retum of the enclosure will be appreciated.
Si erely an.Cranston Picase address envelope to:
Senator Alan Cranston 112 Hart Senate Office Building Washington, D.C. 20510 Attn:
Betty Borden 8604210146 860414 PDR ADOCK 0500 3
H