Forwards Modified Pp 9 of SE Re Topical Rept WCAP-14036 Rev 1, Elimination of Periodic Protection Channel Response Time Tests. Mod Does Not Change Conclusion in Ser,Nor Logic Used to Reach Conclusion
ML20155F080
Person / Time
Issue date: 11/03/1998
From: Essig T
NRC (Affiliation Not Assigned)
To: Liberatori L
WESTINGHOUSE OPERATING PLANTS OWNERS GROUP
Shared Package
ML20155F084 List:
References
PROJECT-694 TAC-MA0863, TAC-MA863, NUDOCS 9811050293
Download: ML20155F080 (3)


Text

-

l l @ MQ

$ t UNITED STATES s* j e

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20665-0001

%, . . . . . ,d November 3, 1998 i

l l Mr. Lou Liberatori, Chairman ,

i Westinghouse Owners Group Steering Committee '

Indian Point Unit 2 Broadway & Bleakley Ave. l Buchanan, NY 10511 '

l l

SUBJECT:

REVISED PAGE 9 OF THE SAFETY EVALUATION RELATED TO TOPICAL i REPORT WCAP-14036, REVISION 1, " ELIMINATION OF PERIODIC PROTECTION CHANNEL RESPONSE TIME TESTS"(TAC NO. MA0863) i The NRC staff forwarded to you, on October 5,1998, the safety evaluation report on the subject I

topical report, submitted by the Westinghouse Owners Group (WOG) by letter dated January l 22,1998. After a telephone conversation with members of the WOG, the staff prepared the l attached modified page 9 of the report, correcting typographical errors made in the original  !

report concerning the components covered by the Solid State Protection Syatem in the topical report.

i This modification does not change the conclusion reached in the SER, nor does it change the logic used to reach those conclusions. The only change is to the list of components within the i Solid State Protection System.

Please replace the current page 9 in the SER with the modified page 9.

1 Should you have any questions or wish further clarification, please call r,1e at (301) 415 2919, or Paul Loeser at (301) 415-2825.

I Sincyely, l& S Thomas H. Essig, Actin hief

" e ssues ad EnWonantal &and 9811050293 981103 D.ivision of Reactor Program Management PDR TOPRP EUTOQWE C PDR Office of Nuclear Reactor Regulation Project No. 694 d

Enclosure:

Page 9 of SER 3 D<r0 cc w/ enc: See next page I

i 0] (99 fhD3 b 9 h l

O November 3, 1998 The NRC staff forwarded to you, on October 5,1998, the safety evaluation report on the subject I

topical report, submitted by the Westinghouse Owners Group (WOG) by letter dated January 22,1998. After a telephone conversation with members of the WOG, the staff prepared the attached modified page 9 of the report, correcting typographical errors made in the original report concerning the components covered by the Solid State Protection System in the topical report.

This modification does not change the conclusion reached in the SER, nor does it change the logic used to reach those conclusions. The only change is to the list of components within the Solid State Protection System.

Please replace the current page 9 in the SER with the modified page 9.

Should you have any questions or wish further clarification, please call me at (301) 415-2919, or Paul Loeser at (301) 415 2825.

Sincerely, Original Signed By:

Thomas H. Essig, Acting Chief Generic issues and Environmental Dranch ,

Division of Reactor Program Management  !

Office of Nuclear Reactor Regulation l Project No. 694

Enclosure:

Page 9 of SER cc w/ enc: See next page DISTRIBUTION:

Central File PUBLIC RL Spessard JWermlel JMauck HICB r/f PLoeser PWen PGEB r/f OGC ACRS To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy withattachment/ enclosure N = No copy OFFICE PM:PGEB E. HlCB SC:bf (A) BC:PGEB NAME PWen N PLoeser$ FAkstulewfcz TEssig hb '

DATE 11Q /98 11/ 2/98 11/c4 /98 y/ 3 /98 OFFICIAL RECORD COPY g , r; 00 080019 NRC Ptlf EEN $bb

O i

1 Westinghouse Owners Group Project No. 694

- cc:

- Mr. Nicholas Liparulo, Manager

- Equipmm. % sign and Regulatory Engineering

- Westinghouse Electric Corporation-Mail Stop ECE 4-15 P.O. Box 355

~

Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation -

Mail Stop ECE 516

' P.O. Box 355

~ Pittc, burgh, PA 15230-0355 Mr. Jack Bastin, Director Regulatory Affairs Westinghouse Electric Corporation

' 11921 Rockville Pike  :

- Suite 107 Rockville, MD 20852 Mr.' Hank Sepp, Manager Regulatory and Licencing Engineering Westinghouse Electric Corporation PO Box 355

- Pittsburgh, PA 15230-0355 b

4 1

4P 4

!l;[

p , 4 A~- - . , - p ,Ar, -

e n --, . a , .,v,, , , w- ~w,