Forwards Comments & Questions on Environ Rept Submitted on 851126 to Complete Review of Renewal of License SNM-778. Responses Required by 860512
ML20155E624
Person / Time
Site: 07000824
Issue date: 04/10/1986
From: Matt Young
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Olsen A
BABCOCK & WILCOX CO.
References
NUDOCS 8604170696
Download: ML20155E624 (3)


Text

-

wh e

APR 1 01986 FCUP:MAY 70-824 Babcock and Wilcox Company ATTN: Mr. Arne F. Olsen Senior License Administrator Research and Development Division P.O. Box 11165 Lynchburg, Virginia 24506-11165

Dear Gentlemen:

As part of the renewal action of Babcock and Wilcox's License No. SNM-778, we have conducted a detailed review of your environmental report submitted to the Nuclear Regulatory Coninission on November 26, 1985. Additional information is required in order to complete the environmental assessment associated with your license renewal. Enclosed is a list of environmental questions regarding.

the Lynchburg Research Center's (LRC) activities. These questions were discussed during our site visit on March 13, 1986.

Written responses to the enclosed questions are necessary to complete our renewal process. The environmental review schedule calls for the receipt of eight copies of your responses by May 12, 1986. Please call me at (301)427-4510 if there are any problems in meeting this schedule or if I can be of assistance.

Sincerely, D?iSir.a1SisnodBy:

Michelle A. Young Uranium Process Licensing Section Uranium Fuel Licensing Branch Division of Fuel Cycle and Material Safety, NMSS

Enclosure:

As stated DISTRIBUTION FCUP R/F NMSS R/F rDocketc70-824" VLTharpe EYShum MAYoung LCobb, IE Region II PDR NKetzlach

/

OFC: FCUP  : FC  : FCUF  : FCUF g ______,,. _ ________ ________________________________

NAME:MA un ks: Shum : VLTW r e: WTCrow :  :  :

DATE: 4/9 /86 :Y/9/86: 4/l /86 :#f/10/86 :

OFFICIAL RECORD COPY ,

8604170696 860410 4 PDR ADOCK 07 ,

. . ~. . -

APR1 0 139 j

COMMENTS AND QUESTIONS ON LRC ENVIRONMENTAL REPORT Question 1: Provide a plot plan of the LRC facility, showing buildings, radioactive waste disposal facility, liquid waste disposal facility, and topography.

Question 2: Provide a map showing locations of vegetation, silt, gross

, alpha, surface water, and air sampling stations. Are these i monitoring programs (listed in Table 2.2-2.6) conducted by LRC in addition to the programs performed by the Naval Nuclear Fuel Division (NNFO) and Commercial Nuclear Fuel Plant (CNFP)? olease explain.

! Question 3: Explain the results in Table 2.2-2.6 in relation to the LLD's listed by describing methods of sampling.

Question 4: Explain the method of collecting air samples and their relation to the results in Table 2-6. Explain why an isotopic analysis i has/has not been performed and what were the results-(in particular, what radionuclides and their concentrations).

Question 5: Describe the methods used in sampling and analysis of the 4

radionuclides released to NNFD. Explain how NNFD measures the concen'trations of radionuclides that are discharged after treatment 1 to the James River.

Question 6: Explain the method of deriving the quantities of release in Table 3-4 and their relation to the LLD's listed.

Question 7: For fissile and Pu please report the wastes in curies, with U-234 included; for source material - report the wastes-in curies including daughter products.

Question 8: In section 3.2.2.1, give an estimate of the amount of hot cell-solid waste that will be generated in the next 5 years.

Explain the current plans for the interim and ultimate disposal of the waste. -

Question 9: In section 3.3.2, describe the liquid waste retention tanks including their location and the monitoring program for leakage and leakage history. Also describe the contaminated solid waste tubes,.their location, and history of leakage.

Question 10: In section 3.3.2.2, describe the waste system, including the ultimate

, discharge of all types of waste. Is there any radioactive material discharged into sanitary waste? Please explain.

l L

O

/

g RPR1 0 togg Question 11: In section 3.3.2.2, is the cooling water analyzed for radioactivity?

Is there need for a NPDES Permit for its discharge? Please explain answers to the above.

~

Question 12: In section 4.2.1.1, explain why the Kr release in 1984 is much higher.

Give an estimate of the Kr release for the next five years.

Question 13: In section 5.1.3, state the distance from LRC to the nearest resident and the values of 0F, and DF7 in the equation on page 5-5.

, Question 14: Explain method of collection and analysis of the vegetation samples. Are the results in Table 2.2 dry or wet weight?

Question 15: Submit Figure 3-3 in a legible form.

3 Question 16: In section 5.1.5.3, please confirm that 10 Ci on the bottom of

! page 5-7 actually should be 10pCi Pu.

I i

l d

l i

I i

1 4

W y_ . . . . _ .r.. , m, . . , , _ . . . r- ~- .y_.. ., . - __.y , ._ , , . . ,, , ,.7,. y, . -79., m ,,-,_. _ . .,,,--_..<._.1

.,e, _ , , , - ._-..s . c...

\

J -

a NMSS/ Fuel Cycle Material FCUF

/

EAF Fi:2:

Dai ct # 79 - E 14 P.ojn: #

O'Jier PD3 /

b OR Rkin to G-SS 390 wr - - - , -

--3