Submits Licensee Plan Re Further Actions to Address Unit 2 Pressurizer Instrument Nozzle Weld Flaw,Due to NRC 981005 Incorrectly Documenting Explicity Commitment Made in Util to NRC
ML20155E604
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/30/1998
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-MA2456, NUDOCS 9811050115
Download: ML20155E604 (2)


Text

,

CHARLES H. C;USE flaitimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant

.NuclearEnergy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 October 30,1998 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Evaluation of the Pressurizer Instrument Nozzle Renair (TAC No. MA2456)

REFERENCES:

(a)

Letter from Mr. A. W. Dromerick (NRC) to Mr. C. H. Cruse (BGE),

dated October 5,1998, Calvert Cliffs Nuclear Power Plant, Unit No. 2-Evaluation of the Pressurizer Instrument Nozzle Repair (TAC No. MA2456)

(b)

Letter from Mr. C. H. Cruse (BGE) to Document Control Desk (NRC),

dated August 25,1998, Pressurizer Instrument Nozzle Weld Flaw l

(c)

Telephone Conference, Between Mr. J. M. Osborne, et al (BGE) and D

Mr.B. J. Elliot (NRC), August 6,1998, Calvert Cliffs' Unit 2 fressurizer Instrument Nozzle Leak Reference (a) incorrectly documents the explicit commitment we made in Reference (b), which was our understanding of the agreements reached during Reference (c).

Our plan regarding further actions to address the Unit 2 pressurizer instrument nozzle weld flaw is as follows:

By February 26,1999, we will forward to the Nuclear Regulatory Commission a summary of our plan for further evaluation of the Unit 2 pressurizer instrument nozzle weld flaw. The plan may, or may not, include an inspection of the pressurizer. If an inspection of the instrument nozzle is performed, Baltimore Gas and Electric Company will make the results available to the Nuclear Regulatory Commission, when obtained.

9811050115 981030 g

PDR ADOCK 05000318 P

PDR 1

^

-Document Control Desk October 30,1998 Page 2 i

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, CHC/JKK/bjd cc:

R. S. Fleishman, Esquire H. J. Miller, NRC r

J. E. Silberg, Esquire Resident Inspector, NRC S. S. Bajwa, NRC R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC l

i i

l i

l i

_..