Monthly Operating Rept for Sept 1988 for Seabrook Station Unit 1
ML20155E562
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/30/1988
From: Nardone O, George Thomas
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NYN-88132, NUDOCS 8810120342
Download: ML20155E562 (7)


Text

.

. ~..

.gr

. OPERATING DATA REPORT DOCKET NO. 50-443 OATE 10/03/88 ,

COMPLETED BY P. Hardone TELEPHONE (603) 474-9521 (Ext. 4078)

OPERATING STATUS

1. Unit Name: Sci 5 rook Station Unit 1
2. Reporting Period: difEMBER 1988
3. Licensed Thermal Power (MWt): 3411
4. Nameplate Rating (Gross MWe): 1197
5. Design Electrical Rating (Net MWe): 1148
6. Maximum Dependable Capacity (Gross HWe): 1197 (Initial design value)
7. Maximum Dependable Capacity (Net MWe): 1148 (Initial design value)
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: Not Applicable

9. Power Level To Which Restricted, If Any (Net MWe): Zero power a 10. Reasons For Restrictions. If Any: License issued on 10/17/86 is a zero power license which allows __ fuel loading and performance of non-nuclear testing.
This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720.0 6575.0 -17160.0
12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Elec. Energy Generated (HWH) 0 0 0
18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Service Factor 0.0 0.0 0.0 1 20. Unit Availability Factor 0.0 0.0 0.0
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0
23. Unit Forced Gi tage Rate 0.0 0.0 0.0
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Not Scheduled

25. If Shut Ocwn At End Of Report Period. Estimated Date Of Startup: Not Applicable
26. Units In Test Status (Prior to Connercial Operation): Forecast Achieved INITIAL CRITICALITY 1988 Not Applicable INITIAL ELECTRICITY 1988 Not Applicable COMMERCIAL OPERATION 1988 Not Applicable 0010120342 080930 .

PDR ADOCK 05000443 R PNU 1 of 6 3 Ed ih

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-443' UNIT Seabrook 1 DATE 10/03/88 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4078)

NONTH SEPTEMBER, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (mwd-Net) (MWe-Net) 1 0 16 0 , [

0 i 2 17 0 3 0 18 0 4 0 19 0 5 0 20 0 6 0 21 0 7 0 22 0 8 0 23 0 j 9 0 24 0 10 0 25 0 11 0 26 0 l 12 0 27 0 13 0 28 0  ;

14 0 29 0 15 0 30 0 l

INSTRUCTIONS On this format, list the average daily ur.it power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

2 of 6 [

t t

i '

{ .

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME SI: brook 1 '

DATE 10/03/88 ,-

COMPLETED BY P. Nardone l REPORT MONTH SEPTEMBER, 1988 TELEPHONE (603) 474-9521 l (Ext. 40?8) l No. Date Typel Duration Reason 2 Method of Licensee Cause & Corrective

! (Hours) Shutting Event Action to j Down Reactor 3 Report # Prevent Recurrence

)

1

)

i 1

}

NO ENTRIES FOR THIS MONTH l

l 1

1 2 3 F: Forced Reason: Method:

S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain) (Duration = 0)

, H-Other (Explain) 9-Other (Explain)

)

f i

3 of 6 I

Docket No. 50-443 Date 10/03/88 ,,

Unit Name Seabrork 1 .

Completed By P. Nardone ,

Telephone (603) 474-9521 (Ext. 4078)

CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Page 1 of 2 REPORT MONTH SEPTEMBER, 1988 DATE SYSTEM COMPONENT MAINTENANCE ACTION 09/13/88 Diesel Bldg. 1-DAH-FN-25A Abnormal fan breaker operation observed Air Handling Train A during auto start. Replaced breaker.

Diesel Romu Supply Fan 09/15/88 Rod Control 1-CP-CP-111 Replaced pole shaft assembly on reactor Train A/B trip breakers and bypass breakers per Reactor Trip NRC Bulletin 88-01.

Switchgear 09/15/88 Nuclecr 1-NI-NM-6691 Multiple component failures at amplifier Instrumentation Trait. B caused erroneous indication. Replaced PAM Nuclear failed components.

Instrumentation Channel 09/21/88 Rod Control 1-CP-CP-111 Charging springs on bypass breaker failed Train B to charge during surveillance test. Re-Reactor Trip placed spring charging limit switch.

Switchgear 4 of 6

. - . - - .. ~ .- . --. _- - - . - - . - _ --- - . - .

I

} Docket No. 50-443- -

Date 10/03/88 .

Unit Name Seabrook 1 .

Completed By. P. Nardone ,

! Telephone (603) 474-9521 .

J (Ext. 4078)

CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Page 2 of 2 REPORT MONTH SEPTEMBER, 1988 j __

1

DATE SYSTEM COMPONENT MAIKTENANCE ACTION 4

4

  • l 09/28/88 Nuclear 1-NI-NM-32 Detector high voltage power supply failed.

{ Instrumentation Protection CH. 2 Replaced power sup.oly.

! Source Range

Channel l

i i

i i

i 1

i 1

1 l

j 5 cf 6

'.*, Docket No. 50-143 Date: 10/03/88 Completed By: P. Nardone Telephone: (603) 474-9521 (Ext. 4078)

REFUELING INFORMATION RE0 VEST

1. Name of facility: Seabrook Unit 1
2. Scheduled date for next refueling shutdown: Not Scheduled
3. SchedLled date for res. art following refueling: Not Scheduled
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Unknown at this time.

5. Scheduled date(s) for submitting licensing action and supporting information:

Not Applicable

6. Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: 193 (b) 0

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present licensed capacity: 1236 No increase in storage capacity requested or planned. ,

i j

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.

The current licensed capacity is adequate until at least the year 2007.

6 of 6

e . s a .

Gttofge S. ThomOS Vice President Nuclect Production Pub 5c Service of New Ha,We New Hampshire Yankee Division NYN 88132 October 6, 1988 United States Nuclear Regulatory Comission Washington, D.C. 20555 Attention: Document Control Desk vv3

Reference:

Facility Operating License No. NPF-56. Docket No. 50-MH>

Subject:

Monthly Operating Report

Dear Sir:

In accordance with Technical Specification Section 6.8.1.5, enclosed please find Monthly Operating Report 88-09 covering the operation and shutdown experience relating to Seabrook Station Unit 1.

Very truly yours,

.d+s*c $

GeordeS. Thomas Enclosure

, cc: Regional Administrator U. S. Nuclear Regulatory Comission - Region I 631 Park Avenue King of Prussia, PA 19406 Mr. D. G. Ruscitto NRC Senior Resident Inspector Seabrook Station Seabrook, NH 03874 l

l I

GG

'\

P.O. Box 300. Seabrook, NH 03874 . Telephone (603) 474 9574