o e %g q
- p 4
UNITED STATES is l9 g
j NUCLEAR REGULATORY COMMISSION 4.
WASHINGTON, D.C. 2066fM001 p%'******/
i October 29,'1998 i
L Mr. George Rael, Director U.S. Department of Energy Albuquerque Operations Office l
ERD /UMTRA P.O. Box 5400 Albuquerque, NM 87185-5400
SUBJECT:
ACCEPTANCE OF GUNNISON, COLORADO,' VICINITY PROPERTY GU-029 COMPLETION REPORT
Dear Mr. Rael:
The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of the Gunnison, Colorado, Vicinity Property Ccmpletion Report (CR) for property number
' GU-029 (a section of South 9th Street) submitted by U.S. Department of Energy (DOE) letter dated December 8,1997 ' The CR was revised by submittals dated July 22 and October 7, 1998. The DOE requested NRC concurrence on this CR because, during remedial action, approximately 340 cubic yards of tailings contaminated soils were left around sewer lines. The
' decision to not remove the residual radioactive material (RRM) soil was based on the DOE conclusion that, because of the difficulty of removing the soil, the cost of remediation is i
unreasonable high relative to the health benefits as allowed under supplemental standards criterion c of 40 CFR 192.21. As a result of this contamination, an application for supplemental
. standards is included in the CR.
- The NRC staff reviewed the CR supplemental standards application and provided comments which were addressed by DOE in a revised CR and subsequent page changes. The staff comments were adequately addressed except for the concern that the health risk assessment in the CR is inappropriate. Since the NRC staff determined that the DOE's conclusion that little or no health benefit would be derived from removing the RRM, the NRC staff chose not to pursue this issue.
. The NRC staff determined that application of supplemental standards for the RRM around the sewer lines of GU 029 meets the U.S. Environmental Protection Agency standards. Therefore, 3 the NRC Review Form for Supplemental Certification of Vicinity Properties, containing NRC 1
- concurrence,is enclosed.
I J
L ye/g I
L e
- 9811050004 981029 f[G/f Wet 61 PDR NRC %] CENTER CDPi
s a,
LW G. Rael October 29, 1998 If you have any questions concerning this letter, please contact the NRC Project Manager, Harold Lefevre, at (301) 415-6678.
Sincerely,
[Signedby]
Joseph J. Holonich, Chief Uranium Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards
Enclosure:
As stated cc: W. Woodworth, DOE Alb F. Bosiljevac, DOE Alb E. Artiglia, TAC Alb DISTRIBUTION w/Encj.:
1 File'Conter!
NMSS r/f URB r/f PUBLIC EBrummett CNWRA ACNW w/o Encl.: MWeber MLayton CAbrams DOCUMENT NAME: S:\\DWM\\ URB \\HEL\\GUNO29CR.023 OFC URB E
URk URBt\\/
h NAME HLefevh CAbram\\
h DATE 10/M/98 H
10/ /98 r$/98 OFFICIAL RECORD COP'Y
l l
l =.
G. Rael,
If you have any questions concerning this letter, please contact the NRC Project Manager, j
Harold Lefevre, at (301) 415-6678.
Sincerely, i
G-~Y Josh:J. Holonich, Chief Uranium Recovery Branch Division of Waste Management
)
Office of Nuclear Material Safety and Safeguards
Enclosure:
As stated l
cc: W. Woodworth, DOE Alb F. Bosiljevac, DOE Alb E. Artiglia, TAC Alb l
~,.
VP No.: GU-029 A
4 NRC Review Form i
for Supplemental Certification of Vicinity Properties J
The Department of Energy (DOE) has determined that the remedial action at the following vicinity property (VP) has been completed and thereby complies with supplemental standards invoked by DOE under 40 CFR, Subpart C, specifically Subsections 192.21 and 192.22.
[]
NRC concurrence for the Radiological Engineering Assessment (REA) was -
given on:
[X ]
Supplemental standards were not in the REA. special circumstances required that supplemental standards be invoked during remedial action.
]
~
J W/4 97
- frank D. Bosiljevac, DOE Certificagn Officer Date#
Based on the information and certification provided by the DOE, the NRC:
M Concurs that the remedial action at the subject VP has been competed under its authority provided by the Uranium Mill Tailings Radiation Control Act (UMTRCA),
Section 104 (f)(1) and as described in the Memorandum of Understanding (MOU), Appendix A, Section 3.4.
)
[]
Concurs, as above, except for the following conditions:
~
1.
j 2.
3.
[ ] See attached sheets for any additional provisions.
[]
Needs additional information to make a concurrence decision. This information consists of; i
[]
See attached sheets f an additionalinformational needs.
&m f
a~
f 8 /998
-NRC' Conf:urring Official find Title Date
~
r