ML20155D965
ML20155D965 | |
Person / Time | |
---|---|
Site: | Peach Bottom, 05509525 |
Issue date: | 10/04/1988 |
From: | Lieberman J NRC OFFICE OF ENFORCEMENT (OE) |
To: | Falcone D AFFILIATION NOT ASSIGNED |
References | |
EA-88-012, EA-88-12, NUDOCS 8810120051 | |
Download: ML20155D965 (1) | |
Similar Documents at Peach Bottom, 05509525 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M6631999-10-19019 October 1999
[Table view]Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 1999-09-09 Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA MONTHYEARML20245B4531989-06-0808 June 1989
[Table view]Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20247A1031989-03-20020 March 1989 Responds to Js Ewing Expressing Opposition to Restart of Plant.Bases Provided in Support of Opposition Are Related to Recent NRC Recommendations for Mark I Containment Improvements & Concern Over Radwaste Disposal ML20155D9831988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC & Enforcement Action EA 88-105 ML20155D9211988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty,Per NRC & Enforcement Action EA 88-021 ML20155D9651988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty,Per NRC & Enforcement Action 88-12 ML20155D9681988-10-0404 October 1988 Ack Recipt of & Payment of Civil Penalty,Per NRC & Enforcement Action EA 88-15 ML20155D9731988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $1,000 in Response to & Enforcement Action 88-078 ML20155E7311988-10-0404 October 1988 Ack Receipt of & Payment for Civil Penalty in Amount of $500 Proposed in NRC ML20155E7601988-10-0404 October 1988 Ack Receipt of & Payment for Civil Penalty in Amount of $500 Proposed in NRC ML20155E7621988-10-0404 October 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500 Proposed in NRC ML20154R4961988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC ML20154N1031988-09-20020 September 1988 Ack Receipt of 880906 Response to 880809 Notice of Violation ML20154Q8761988-09-20020 September 1988 Ack Receipt of & Check for Payment of Civil Penalty Proposed by NRC in ,Per Enforcement Action 88-028 ML20154Q8951988-09-20020 September 1988 Ack Receipt of & Check for Payment of Civil Penalty Proposed by ML20154Q9321988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500 Proposed in NRC ML20154Q9471988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC ML20154R0781988-09-20020 September 1988 Ack Receipt of in Response to 880809 Notice of Violation Per Enforcement Action 88-029 ML20154S7791988-09-20020 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $1,000 Proposed in NRC ML20155B6901988-09-20020 September 1988 Ack Receipt of & Payment in Amount of $1,000 in Response to Violation Noted in NRC ML20154N0501988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $800.Repeated Violation Will Terminate License ML20154R0641988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC Per Enforcement Action 88-027 ML20154N0731988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500.Repeated Violation May Result in Termination of License ML20154N0941988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500.Future Violations Similar to Ones Committed, Per 880809 Notice of Violation,May Result in Termination of License ML20154Q9111988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty Proposed by NRC ML20154R4671988-09-19019 September 1988 Ack Receipt of & Payment for Civil Penalty Proposed by NRC .Informs That Future Violations, Indicating Failure to Carry Out Public Trust,May Result in Termination of License ML20155A3191988-09-19019 September 1988 Ack Receipt of & Payment of Civil Penalty in Amount of $500 Proposed in NRC ML20151M6061988-04-19019 April 1988 Responds to FOIA Request for Info Re Scores of Reactor Operators & Senior Reactor Operators.Forwards Requalification Exam Summary Source Sheets Listed in Encl App W/Personal Privacy Info Deleted ML20148F7381988-01-21021 January 1988 Final Response to FOIA Request Re Alleged Threats to Employee at Plant.Document Identified in App a Available in PDR ML20238C9771987-12-0909 December 1987 Apologizes for Oversight of Lack of Adequate Publicity About 871104 Meeting in Quarryville,Pa for Public to Comment on Util Commitment to Excellence Action Plan.Comments & Advertisements of Meetings Encl ML20236A7701987-10-19019 October 1987 Final Response to FOIA Request for Documents Re Alleged Incident at Plant.Forwards App a & B Documents.App B Partially Withheld (Ref FOIA Exemptions 6 & 7C).App a & B Documents Also Available in PDR ML20235H5111987-09-28028 September 1987 Partial Response to Appeal Re Denial of FOIA Request for Documents Re Dismissal of Health Physicist at Plant for Whistleblowing on Mar 1985 Incident of Equipment Malfunction.Documents Withheld (Ref FOIA Exemption 5) ML20235R8061987-09-16016 September 1987 Forwards Portion of Combined Insp Repts 50-277/87-17 & 50-278/87-17 Re 870708 Drug Incident in Response to .Licensee Has Implemented Fitness for Duty Program in Effort to Ensure That Facility Free of Drugs.W/O Encl ML20237F5921987-08-19019 August 1987 Partial Response to FOIA Request.Lers Indicated in Request for Dockets 50-220,322 & 410 Not Issued by Licensee.Forwards Documents Listed in Apps a & B.App a Documents Available in Pdr.App B Documents Being Made Available in PDR ML20237G0081987-08-19019 August 1987 Responds to Appeal Re Denial of FOIA Request for Documents Re Dismissal of Health Physicist at Plant for Whistleblowing on Mar 1985 Incident of Equipment Malfunction.Encl App Documents Partially Withheld (Ref FOIA Exemptions 5,6 & 7) ML20236K2621987-08-0404 August 1987 Partial Response to FOIA Request for Records Re AO Reporting.Forwards App D & E Documents.Documents Also Available in PDR ML20236H4841987-07-31031 July 1987 Partial Response to FOIA Request for Documents,Including AO Repts to Congress.Forwards App B Documents.App a & B Documents Also Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemption 5) ML20235P0881987-07-16016 July 1987 Final Response to FOIA Request for Documents,Including Rept of Investigation Re Alleged Threats to Employee to Prevent Disclosure to Nrc.App L Document Already Available in PDR ML20235N6161987-07-15015 July 1987 Partial Response to FOIA Request for Documents,Including Draft Synopsis of Case 1-85-019.App H & Encl App I & J Documents in Pdr.App J Documents Partially Withheld & App K Documents Completely Withheld (Ref FOIA Exemptions 5,6 & 7) ML20235G1731987-07-0808 July 1987 Final Response to FOIA Request for Documents Re NRC 870331 Order Suspending Plant Operations,Including Correspondence W/Util.App C Documents,From FOIA-87-185,withheld (Ref FOIA Exemption 5).Related Matl Under FOIA-87-209 in NRC PDR IA-87-205, Final Response to FOIA Request for Documents Re NRC 870331 Order Suspending Plant Operations,Including Correspondence W/Util.App C Documents,From FOIA-87-185,withheld (Ref FOIA Exemption 5).Related Matl Under FOIA-87-209 in NRC PDR1987-07-0808 July 1987 Final Response to FOIA Request for Documents Re NRC 870331 Order Suspending Plant Operations,Including Correspondence W/Util.App C Documents,From FOIA-87-185,withheld (Ref FOIA Exemption 5).Related Matl Under FOIA-87-209 in NRC PDR ML20234F4041987-07-0101 July 1987 Partial Response to FOIA Request for Documents Re Plant. Forwards App E Documents.App F & G Documents Partially & Completely Withheld (Ref FOIA Exemptions 6 & 5), Respectively.App D & E Documents Available in PDR ML20216F2861987-06-24024 June 1987 Final Response to FOIA Request for Documents Re Plant. Forwards App I Documents.App H & I Documents Available in Pdr.App I & J Documents Partially & Completely Withheld (Ref FOIA Exemptions 5 & 6) ML20215H4181987-06-19019 June 1987 Partial Response to FOIA Request for Documents.Forwards App B Documents.App a & B Documents Also Available in Pdr. App C Documents Withheld (Ref FOIA Exemption 5) ML20215H4231987-06-19019 June 1987 Final Response to FOIA Request for Documents Re Plant Feedwater Line Failure.Forwards App H Documents.App G & H Documents Available in Pdr.Document Listed in App I Completely Withheld (Ref FOIA Exemption 5) ML20214E4701987-05-18018 May 1987 Partial Response to FOIA Request for Documents Re Facility. App a Documents Available in Pdr.App B Documents Being Made Available in PDR & Encl.W/O Stated Apps for FOIA 87-185 ML20214C3641987-05-15015 May 1987 Partial Response to FOIA Request for Documents.App G Records Available in PDR ML20214C9361987-05-14014 May 1987 Partial Response to FOIA Request for Documents Re Facilities.App D Documents Available in Pdr.App E Documents Forwarded & Placed in Pdr.App F Records Totally Withheld (Ref FOIA Exemption 5) ML20213G1241987-05-12012 May 1987 Final Response to FOIA Request.App a Documents Already Available in Pdr.App B Documents Encl & Available in PDR ML20209C1481987-04-24024 April 1987 Partial Response to FOIA Request Re Facility.Forwards App B Documents.App a & B Documents Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemptions 5 & 7). Addl Records in PDR in Folders FOIA-86-684 & FOIA-87-117 IA-86-684, Partial Response to FOIA Request Re Facility.Forwards App B Documents.App a & B Documents Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemptions 5 & 7). Addl Records in PDR in Folders FOIA-86-684 & FOIA-87-1171987-04-24024 April 1987 Partial Response to FOIA Request Re Facility.Forwards App B Documents.App a & B Documents Available in Pdr.App C Documents Completely Withheld (Ref FOIA Exemptions 5 & 7). Addl Records in PDR in Folders FOIA-86-684 & FOIA-87-117 1989-06-08 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M6631999-10-19019 October 1999
[Table view]Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application ML20210H5341999-07-27027 July 1999 Forwards Insp Repts 50-277/99-05 & 50-278/99-05 on 990518- 0628.NRC Determined That Two Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209F2461999-07-15015 July 1999 Request Addl Info Re Relief Request CRR-01 Through CRR-11 for Plant,Units 2 & 3.RAI Undtd ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195K2251999-06-11011 June 1999 Forwards Insp Repts 50-277/99-04 & 50-278/99-04 on 990405- 0517.One Severity Level IV Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20207G2051999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20207B8381999-05-24024 May 1999 Forwards FEMA Final Exercise Rept for Peach Bottom Atomic Power Station Plume Exposure Pathway Exercise Conducted on 981117.One Deficiency & 27 Areas Requiring Corrective Actions Identified ML20207A0541999-05-17017 May 1999 Acks 990512 & 14 Telcons with Licensee Re Util Request That Rev 8 of NUREG-1021, OL Exam Stds for Power Reactors Be Followed Rather than Interim Rev 8 for Exams in Sept 1999. Request Acceptable ML20206K2231999-05-0606 May 1999 Informs That Author Authorized to Exercise Discretion & Not Issue NOV or Civil Penalty Re Violation Util Identified Involving Unit 2 Rod Block Monitoring Sys Being Inoperable for 29 of 185 Control Rods ML20206K1921999-05-0606 May 1999 Discusses 990503 Telcon Between J Williams & B Bierly Re Arrangements Made for Administration of Licensing Exam at Peach Bottom Facility During Week of 990913 ML20206A2801999-04-20020 April 1999 Discusses Proposed Changes Submitted by PECO on 980416, 981116,990122 & 990211 to Plant Emergency Action Levels (Eals).Eals Incorporate Guidance in NUMARC/NESP-007,Rev 2. SE Supporting Proposed EALs Encl ML20206A1511999-04-20020 April 1999 Forwards Request for Addl Info Re Util 980514 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-operated Valves. Response Requested within 90 Days of Ltr Receipt ML20205N1961999-04-0909 April 1999 Informs of NRC Planned Insp Effort Resulting from Peach Bottom Atomic Power Station Plant Performance Review Conducted for Period April 1998 to 990115.Historical Listing of Plant Issues & Insp Plans Through Jan 2000 Encl ML20205K7321999-04-0707 April 1999 Forwards Amends 227 & 230 to FOLs DPR-44 & DPR-56, Respectively.Amends Consist of Changes to TS SRs Re Secondary Containment Doors,In Response to 980204 Application,As Revised by ML20205J0531999-04-0101 April 1999 Ack Receipt of 990326 Notice of Enforcement Discretion Request & Documents Resolution.Notes That E3 EDG Returned to Operable Status on 990327,within 14 Day Completion Time Required by Ts.No Enforcement Discretion Necessary ML20205B9891999-03-25025 March 1999 Forwards Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.Violation Noted & Being Treated as non-cited Violation.Nrc Concluded That Staff Maintained Effective Influents Controls & Effective Security Program ML20203H7751999-02-12012 February 1999 Discusses Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Peach Bottom Atomic Power Station ML20203H8101999-02-12012 February 1999 Discusses Completion of Licensing Action for Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in BWR, ML20202J5251999-02-0101 February 1999 Forwards Insp Repts 50-277/98-11 & 50-278/98-11 on 981110- 990104 & Notice of Violation Re Failure to Complete Facility Licensed Operator Requalification Program ML20202J8081999-02-0101 February 1999 Forwards Insp Repts 50-277/98-09 & 50-278/98-09 & Notice of Violation.Insp Focused on Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operation Conditions ML20203A6111999-01-22022 January 1999 Confirms 990115 Conversation Between Mj Williams & P Orphanos Re Arrangements Made for Administration of Licensing Exam at Limerrick Generating Station & Peach Bottom Atomic Power Station During Week of 990705 ML20198P1761998-12-30030 December 1998 Forwards from R Calvan Transmitting FEMA Rept for Spring 1998 Peach Bottom Atomic Power Station Ingestion Exposure Pathway Exercise.No Deficiencies Identified During Exercise Conducted on 980407-09,980506 & 980519-21 ML20198K5911998-12-24024 December 1998 Forwards Emergency Response Data Sys Implementation Documents Which Include Data Point Library Updates for Fermi (Number 268),Peach Bottom (Number 269) & Beaver Valley (Number 270).Without Encls IR 05000277/19980081998-12-21021 December 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-277/98-08 & 50-278/98-08 Issued on 981028 ML20198D4071998-12-16016 December 1998 Forwards Emergency Preparedness Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Exercise Weaknesses,Safety Concerns or Violations of NRC Requirements Identified 1999-09-07 |
Text
- - _ . ..
OCT 4'iS68
, 4, . -
Docket No. 55-9525 EA 88-12 Donald G. Falcone HGE ADDRESS DEIEIED UlDER 10 CFR 2.790
Dear Sir:
1 This will acknowledge receipt of yv r letter dated Septe.noer 26, 1988 and your check for $500 in payment of the c il penalty proposed by the NRC in a letter -
dated August 9, 1988.
The NRC recognizes that you have committed to lasting improvement in your performance and expects that'this commitment will be met. You should be aware that future violations similar to the ones which you have admitted, indicating the failure to carry out the public trust, may result in the termination of your license.
OrfelnlSloned By
, James Lieberman James Lieberman, Director Office of Enforcement cc: W. T. Russell, RI DISTRIBUTION:
DHolody, RI JLieberman, OE JLuehman, OE HWong, OE Day File 4
4 1
l 1
/W \
~
O E DD:0E c:0 : .
I i JLuehman:drb HWong JLt erman 10/ /88 10/ 3 /88 10/ 'SS f6 8810120051 891004 I
. - . - _ _ _ _ _ _ _ _ _ _ - _ _ _ _, - - - - - - - - - _ , , - -- --.- - _ ___ - . - - . .