Forwards Application for Amend to License NPF-3,relocating Existing TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition
ML20155D767
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/27/1998
From: Jeffery Wood
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155D770 List:
References
2557, LAR-98-0010, LAR-98-10, NUDOCS 9811040020
Download: ML20155D767 (2)


Text

,. -. -, .. . - - - - . ~ . . .

9J' '.

run- naam Davis-Besse Nuclear Power Station yyyV $501 Mxth State Route 2

,_ Oak Harbor Ohio 4344%9700 s >

John K. Wood .. 419-2472300

. We President + Nuclear far 419-32183J7 ,

l i

' Docket Number 50-346

' License Number NPF-3 )

Serial Number 2557 l l

October'27,'1998-7 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

License Amendment Application to Relocate a Surveillance Requirement from Technical Specification 3/4.6.5.1, " Emergency Ventilation System," to 3/4.6.5.2,

" Shield Building Integrity," and Delete Definition 1.24, " Shield Building Integrity"

- (LAR 98-0010)

Ladies and Gentlemen:

Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station g

' (DBNPS), Unit Number 1, Operating License Number NPF-3, Appendix A, Technical l-Specifications (TS). The proposed changes involve Technical Specification 3/4.6.5.1, I l

" Emergency Ventilation System," 3/4.6.5.2, " Shield Building Integrity" and the associated TS Bases, and Definition 1.24," Shield Building Integrity".

The proposed changes would relocate existing TS Surveillance Requirement 4.6.5.1.d.4 regarding Emergency Ventilation System (EVS) negative pressure testing to TS 3/4.6.5.2. The h{  ;

- proposed changes would also delete the TS Definition 1.24, " Shield Building Integrity," and make related changes associated with the deletion of this definition to the TS Index and the

, applicable TSs and Bases.

' These proposed changes would cause the Action statement of TS Limiting Condition for

~ Operation 3.6.5.2 to be applied should the EVS be unable to produce the required negative pressure, in the annulus space located between the containment structure and shield building due to an opening in the ventilation boundary.

The " Improved Standard Technical Specifications for Babcock and Wilcox Plants," NUREG-1430, Revision 1 does not include guidance for a Shield Building Integrity TS since the DBNPS 9811040020 PI)R 981027 P ADOCK OS00034EL P- PDR g

I ..- Docket Number 50-346

~ License Number NPF-3 i SerialNumber 2557 l' _,

Page 2, is the only Babock and Wilcox type plant with a containment vessel / annulus space / shield l bui lding design. llowever, as a result of discussions with the NRC staff, these proposed TS

' changes are based upon the Shield Building Integrity TS guidance provided by the " Improved Standard Technical Specifications for Combustion Engineering Plants," NUREG-1432, Revision L 1 and the " Improved Standard Technical Specifications for. Westinghouse Plants," NUREG- -

1431, Revision 1. Also included is a proposed administrative change to TS Table 4.6-1, " Access

. Openings Required to be Closed to Ensure Shield Building Integrity," to correct a room number.

Toledo Edison requests that this license amendment application be approved by the NRC by

. February 26,1999.

Should you have any_ questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 321-8466.

Ve truly yours,

- JCS/laj

. enclosure cc: J. L. Caldwell, Acting Regional Administrator, NRC Region Ill  ;

S. J. Campbell, NRC Region Ill, DB-1 Senior Resident Inspector  !

. A. G. Hansen, NRC/NRR Project Manager J. R. Williams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)