Responds to NRC Re Violations Noted in Insp Repts 50-295/88-09 & 50-304/88-10.Corrective Actions:Blank Flange Installed to Preclude Entry of Unfiltered Air Into Control Room & Repairs to Booster Fans Completed
ML20155D472
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/31/1988
From: Bliss H
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
4716K, NUDOCS 8806150195
Download: ML20155D472 (3)


Text

l l

, / Commonwealth Edison

' One First National Plaza Chicago, Ulinois b'.O l

i. . ('._['N (f] Address Reply to: Post Offc4 Box 767 Chicago, I!!inois 60690 0767 May 31, 1988 Mr. A. Bert Davis Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Rocd Glen Ellyn, IL. 60137

Subject:

Zion Nuclear Power Station Units 1 and 2 Response to NRC Inspection Report Nos.

50-295/88-009 and 50-304/88-010 NRC Docket Nos. 50-295 and 50-304

Reference:

April 29, 1988 letter from W.L. Forney to Cordell Reed

Dear Mr. Davis:

This letter is in response to the inspection conducted by M.M.

Holzmer and P.L. Eng of your office from February 25 through April 13, 1988 of activities at the Zion Nuclear Power Station. The referenced letter indicated that certain activities appeared to be in noncompliance with NRC requirements. Commonwealth Edison Company's response to this violation is provided in the Attachment to this letter.

Please direct any questions that you may have to this office.

Very truly yours, Fh H. E. iss Nuclear Licensing Manager

/klj 4O \

cc: NRC Resident Inspector-Zion ik 4716K i

1 Y

t 8806150195 880531 PDR ADOCK 05000295

-Q nnn

pm -

g

'i N' .

ATTACHMENT ZION NUCLEAR POWER STATION

-RESPONSE TO NOTICB OF VIOLATION t

VIOLATION 110 CFR.50, Appendix B, Criterion III, as implemented in the licensee's approved Quality Assurance Topical Report, CE-1-A, requires that

design changes be. treated with the scme design control measures as the original design, including appropriate approvals. Commonwealth Edison Quality' Assurance Manual procedure 3-51, Attachment A, states that modifications which are. temporary alterations, such as blind flanges, will be administrative 1y controlled outside the scope of QP 3-51. Zion Station Administrative Procedure ZAP-0, Conduct of Operations, paragraph 5.3.10, states that temporary alterations, including temporary mechanical system changes such as the installation of blank flanges, shall be conducted in accordance with ZAP 3-51-4.

Contrary.to the above, on March 4 through 15, 1988, a temporary alteratior was not conducted in accordance with ZAP 3-51-4, in-that a blank ilange was installed on the' supply plenum to the control room charcoal booster fans, and no temporary alteration controls required by ZAP 3-51-4 were used.

CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED The hiank flange had been installed by the Maintenance Department in the process of performing necessary repairs to the OB Control Room Charcoal Booster Pan, which would not start when actuated from the control toom. .The flange was installed to preclude entry of unfiltered air into_the control-room makeup air supply through the hole left in the ductwork by removal of the OB fan.

Repairs to the fan were completed, the flange was removed, and the system was declared operable. The PT-14 surveillance "Inoperable and Required Redundant Equipment Surveillance Test-Sheet" was closed out on March 31, 1988.

j. CORREL'TIVE ACTIOlJ TO BE TAKEN TO AVOID FURTHER VIOLATION l

L Informal discussions were held with all Mechanical Maintenance Department supervisors, specifically covering the requirements of Zion Administrative Procedure ZAP 3-51-4, "Procedures Governing the Use of

!~ Temporary Cables, Lifting of Terminated Wires, Bypassing of Alarms, and i

Installation of Mechanical Blocks or Bypasses". Mechanical Maintenance Supervisors were instructed that blank flanges are within the scope of ZAP 3-51-4, and that in the future blank flanges will be documented via the block / bypass log when required by ZAP 3-51-4.

l

CF e; j 'T' ,

It was noted that not all flanges constitute alterations to the system. In cases where the flange provides functional isolation, or where it provides a system boundary, the flange is a temporary alteration and shall be reviewed and documented per ZAP 3-51-4. In certain cases, a blank flange is installed on a part of the system that is already isolated, and does not alter the system functionally, but is provided only as a dust cover to maintain the cleanliness of the equipment. In these cases, temporary alteration review and documentation is not required.

As a longer term corrective action, it was noted that installation of blank flanges without the documentation in ZAP 3-51-4 is permitted under certain circumstances. In particular, the use of Temporary Alteration documentation is not required when the installation and removal record is kepc as part of an approved procedure, the procedure has a specific sign-off for restoration of the system to normal, and the procedure is reviewed for completeness prior to returning the equipment to an operable condition.

' Documented discussions shall therefore be held with all Mechanical Maintenance Supervisors, stating that when a blank flange which constitutes a temporary alteration to the system is to be installed, ZAP 3-51-4 requires that the flange be logged in and reviewed as a block, unless the installation is being performed as part of a station approved procedure.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED The station will be in full compliance by July 1, 1988.