ML20155D331

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-382/98-09 Issued on 980710.Reviewed Reply & Found Reply Responsive to Concerns Raised in NOV for Violation 50-382/98-09-02
ML20155D331
Person / Time
Site: Waterford 
Issue date: 10/27/1998
From: Harrell P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
50-382-98-09, 50-382-98-9, NUDOCS 9811030196
Download: ML20155D331 (4)


See also: IR 05000382/1998009

Text

. . .

.

-

_-

.-

-- - .

..

--

.

.

l

I

  1. e "' %

UNITED SI ATES

a

%

NUCLEAR REGULATORY COMMISSION

3

o

~

{

$

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

+0

AR LINGTON, TEXAS 76011-8064

OCT 2 71998

i

Charles M. Dugger, Vice President

Operations - Waterford 3

'

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

l

SUBJECT:

NRC INSPECTION REPORT 50-382/98-09

i

Dear Mr. Dugger:

Thank you for your letter of August 24,1998, in response to our July 10,1998, letter and Notice

of Violation concerning a failure to control a Fire Door (50-382/9809-02) and concerning a

failure to declare a diesel generator inoperable when a missile door was opened

(50-382/9809-01). We have reviewed your reply and find it responsive to the concerns raised in

our Notice of Violation foi Violation 50-382/9809-02. We will review the implementation of your

corrective actions during a future inspection to determine that full compliance has been

achieved and will be maintained.

In response to Violation 50-382/9809-01, we understand that you admit that operators did not

follow expectations and administrative procedures did not require operators to determine

whether an open door would render equipment inoperable. Further, we understand that you

contend that the door in question was not a missile door, consequently, the diesel generator

was never inoperable. We believe that the door was a missile door and are continuing our

investigation into the design and licensing basis for the missile door. As discussed with your

staff, we are continuing our investigations and will inform you by a separate letter in the future

of the results of our review.

Sincerely,

i

P.

arrell, Chief, Branch D

.

j visi n of Reactor Projects

Docket No.:

50-382

License No.: NPF-38

i

i

cc:

'

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

9811030196 981027

"

PDR

ADOCK 05000302

G

PDR

1

!

,

.

.-.

..- .- . .

. - . .- - . -. - . - - - - - -..-. .- _~ . -

--.- -.

. . . . . - . - . . .

l-

1

.

.

.

l

Entergy Operations, Inc.

-2-

l

i

-

l

. Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286 1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066 -

Manager - Licensing Manager

Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066'.

Chairman

- Louisiana Public' Service Commission

~

' One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director, Nuclear Safety & -

,

Regulatory Affairs

,

Waterford 3 SES

'

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Adminis'.rator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

Parish President

St. Charles Parish

P.O. Box 302 '

Hahnville, Louisiana 70057

- Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

,

-.

-

-

-

-.

. ..

..

- . - -

- . .

-

.-

-. -. .. ..

. ..

,

. .

l

l

' Entergy Operations, Inc.

-3-

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

.

Project Engineer (DRP/D)

RIV File

l

Branch Chief (DRP/TSS)

!

.

l

'

!

i

1

'

l

l

l

l

DOCUMENT NAME: R:\\_WABWT809AK.JMK

To receive copy of doc lirnent, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:C:Ah Nb,t(

l

l

,.

'

PHHarrd(W/,

10/1$9A '/ /

[

OFFICIAL RECORD COPY

l

!

__

.

_ _

_ _ - .

.

. .

. . . _ _ _ _

_ . _ _ _ _ -

_ _ . _ _ _

_. . _ . .

__

.

.

.

l

I

Entergy Operations, Inc.

-3-

t

~ vuu (;L.p

l

bcc distrib. by RIV:

!

Regional Administrator

Resident inspector

l

DRP Director .

DRS-PSB

ll

Branch Chief (DRP/D)

MIS System

'

Project Engineer (DRP/D)

RIV File

j

l

Branch Chief (DRP/TSS)

I

i

1

i

l

.

.

.

.

?

DOCUMENT NAME: R:\\_WAT\\WT809AK.JMK

To receive copy of doc ynent, indicate in box: "C" = Copy without enclosures 'E' = Copy with enclosures 'N' = No copy

RIV:C:MhPlb ,I (

l

l

l

PHHarrd[fffF/,

10/iW9A '/ /'

[

OFFICIAL RECORD COPY

.

I

,.