- _ -.
4 m
usamm W
r
- Ell David W. Cockfield Vice President, Nuclear September 27, 1988 4
Trojan Nuclear Plant Docket 50-344 Licenso NPF-1 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk l
Washirston DC 20555
Dear Sir:
TROJAN NUCLEAR PLANT Data from the Pressurizer Surgo Line (PSL) Monitoring Program During the heatup following the 1988 refueling outago, data were taken on j
the pressurizer surge line to dotormine the extent of general stratifi-j cation in the line and its effect on the movement of the line. The data
]
are provided an an enclosure which includes a.fummary report of the nonitoring program.
I j
This transmittal represents the heatup and power operation portions of the 3
monitoring program.
Additional monitoring will bo dono during a future Plant cooldown.
Sincerely,
/'
/
b& f 4
Enclosure c:
Mr. John B. Martin j
Regional Administrator, Region V U.S. Nuclear Regulatory Comission Mr. William T. Dixon, w/o cnclosure i
State of Oregon s
j Department of Energy I
Mr. R. C. Barr, w/o enclosure
]
NRC Resident Inspector j
Trojan Nuclear Plant I
f
( th (gj 7