SEP 3 01988 MEMORANDUM FOR:
Charles E. Rossi, Director Division of Operational Events Assessment, NRR FROM:
Edward J. Butcher, Chief Technical Specifications Branch Division of Operational Events Assessment, NRR
SUBJECT:
MINUTES OF MEETING WITH NUMARC STS IMPROVEMENT C0 ORDINATION GROUP REGARDING PROGRESS OF WORK ON THE TECHNICAL. SPECIFICATIONS IMPROVEMENT PROGRAM On September 7, 1988, the NRC staff met with the NUMARC STS Improvement Coordination Group regarding progress in developing new Standard Technical Specifications (STS). NUMARC discussed its status of action items from the July 28, 1988, meeting including its schedule for submitting new STS and lead plant new technical specifications to the staff. The staff gave its current progress on staff action items.
The staff also provided status of its work on line item improvements, surveillance testing, and review of NSSS vendor topical reports.
New action items are documented in the attached action itein list.
Salient points of the meeting are mentioned below.
The staff commented on the desirability to address the proper use of technical specifications, especially the use of specification 3.0.3, in the new STS.
NUMARC responded that this issue will be addressed in section 3.0.
The staff informed the industry that radiologicsi effluents technical specifi-cations (RETS) will be handled by a generic let';er.
Current staff thinking is that rulemaking is not necessary because a generic letter will accomplish the intent of the Commission's Interim Folicy Statement in a more timely, efficient, and cost effective manner.
However, industry strongly urged that the staff go to rulemaking as the interim Policy Statement indicates.
NUMARC conynented that a revised Writer's Guide with sample specifications is to be issued by the end of September.
(
V y&
5
()f estoiooaoa eso9ao 0
/
,/
6{f
- fI
1 SEP 3 01988 2
The next meeting between NRC and the NUMARC STS Improvement Coordination Group is scheduled for October 5, 1988.
Original Signed By:
Edward J. Butcher Edward J. Butcher, Chief Technical Specifications Branch' Division of Operational Events Assessment, NRR
Enclosures:
(1) Action items l
(2) fleeting Attendance OlSTRIBUTION:
TIMurley VStelio, E00 JHConran POR JHSniezek BBHayes CHBerlinger OTSB Members FJiliraglia MJClausen, OC W0Lanning OTSB R/F DMCrutchfield JLieberman, OE WKt:nnedy 00EA R/F SAVarga WGMcDonald 0 ARM LShao Central Files BKGrimes WBKerr, 508U/CR JWRoe GHolahan JGPartlow, OSP ELJordan AE00 SJCnilk, SECY FJCongel PEBird 0TSB S/F. (MEETING NOTICE)
FGillespie HLThompson, Jr. NMSS Regional Administrators SRConnelly, Ol A WCFarler, OGC NRC Participants 50 Richardson CIGrimes (MINUTES /REINHART/9/7/88)
- (see prev us concurrence)
- TS DE 4RR T50:00E
'P' C:
EA:NRR FF p t:pmc RLEmch 4
E er 4,t/6(
09/2J/88 09/C/88 a
Faclocum (1)
Septemter 14, i988-CHNEBS_GPOT._ ACTION ITBG ITD1 OfKL DUE IMTE
- 1. Ibvelop proposal to control Baces.
OG OCT S. 1988 NBC umtact: Millarxl Wohl.
- 2. Establish Icad Plant Task Grxx2p to decide the follouirv issues:
OG OCT S 1988 I E
Contact:
Mart. Reinhart.
- a. Preil on process for prenoticing of licence amendments.
- b. How lead plant subnittals am to be handled.
(1) In a plant spacific spli; necessary?
(2) Where do mlocated requimmente go?
Lead Plant Task Groun werahin:
FA Iosito Virginia Power North Anna Westin&xtre (Icad Plant)
Jacquie Hinds IGE Diablo Canyon Wastirv house (Proposed Lead Plant)
Ihn Grwm Florida Power CorToration Crystai River IWW (Icad Plant)
(Representative bat nct on Task Group.)
No nemter SMUD Rancho Seco BW (Proposed Iax! Plant)
Peter Smith SCE San Onofm 2 and 3 CE (Leix] Plant)
John Fowler
!G%L Grand Gulf (BWR 6)
GE (Inxi Plant)
Jerry Jones Georxia Power-Hatch 2 (IWR 4)
GE (tead Plant)
STATUS: NUMAPC to provide prwtress report by (btober 5,1988.
3.14viate chapter ruibmittal schedule.
(See attached.)
OG OCT S. 1988 NIC
Contact:
Mark Reinhart.
1
i
~
Enclosure (1) 1 September 14,198'8 i
- 4. Beriew the PRAB guidance for evaluating PRA's for risk significance of Accident OG Upon Monitoring Instnments.
Miur a NBC
Contact:
Mark Reinhart.
Decision
- a. Decide if OG's want to take any action or not.
- b. Decide if OG'n want to pursue changes to A0r's and Action Statements.
- c. Decide if OG's want to pursue a prtgram for Technical Specifications, Sect. 6.
- 5. Issue revision of Writers' G2i& with sample specifications.
W SEP 30, 1988 NBC
Contact:
Kulin Desai.
- 6. Westinghouse prtmose instrument by instrument categorization of Radiation Monitoring OG OCT 1, 1988 instruments as follows:
NBC
Contact:
Kulin Desai.
- a. BETS.
- b. Operational Safety.
- c. Other amplicable category (les).
2
- _- =_
l libelosum (1)
Septaber 14, 1988 STAFF AcrION ITEMR ITf21 OEU.
IXE DNIE
- 1. Fwiback to industry on sample Bases from GE Topical Report EAS-46-0487.
OTSB OCT 5, 1988 ACTION: Kulin Desai.
- 2. Decide if Remote Shutdoun instrumentation may be relocated or if it must be retained OrSB OCT S, ~388 in STS.
ACTION: Tom Dunning.
- 3. Bemove note from Radiaticn Monitoring Instrumentation which rwauims that all these OISB OCPE R IE instruments be mtained as one system.
ACTION: Kulin Desai.
- 4. Review OG sutaittals and categorize the Radiation Monitoring Instrumumtation OTSB OCT 1, 1988 as follows:
ACTION: Kulin Desai.
- a. RE13.
- b. Operational Safety.
- c. Other applicable category (ies).
STARIS: Weetinghouse to propose instrument by instrument categorization.
See Owners Group Action Item 6.
- 5. Make decision whether RETS am to be handled by hiemaking or by Generic Letter.
DOEA OCT S, 1988 FDLIIM: Mark Beinhart.
- 6. Provide industry with the staff's comments on NtNARC's concern about wording of OTSB OCT S, 1988 criteria clarification for impact of the SER and SRP on SAR.
ACTION: Millard Wohl.
3
Enclosure (1)
September 14,198NI i
ACTION: Millard Wohl.
- 7. Prtwide indactry with the staff's comments on NWIABC's concern about wording of OTSB OCT 5, 1988 criteria clarification about transients and accidents outside of FSAR chapters 6 and 15.
ACTIW: Millard Wohl.
- 8. Detemine possible, optimum timing and fom for lead plant submittals.
OTSB OCT 5, 1988 ACTION: IMAS.
FOLIIM: Mart Beinhart.
- 9. Consider feasibility of placing Accident Monitoring instrumentation under a progran OTSB OCT 5, 1988 in Technical Specifications. Section 6.
See Owners Group Action Item 4.
ACTIW: Kulin Decai.
4 l
Fnclosure (1)
September 14. 1988 -
NLMARC SCHEDULE FOR SUIMI'ITIF, STS QIAFTEIG 70 hTC (Oral estimate as of September 7.1983. See Ownern Grw p Action Item 3.)
j QlAPTER Oct!ELEIE_LWNEEG_GMXT_SFECIFIC_FEVIDi SRNIT_10_STAEF Use and Application September 23, 1988 0:tober 1988 (early)
Beactor October 1988 November 1988 Electrical January
- 20. 1989 Febnzary
- 1. 1989 Instruar ntation Febnzary 17. 1989 February 28. 1989 ECC3 Containment F.3 fueling Oserations March
- 17. 1989 thrrh
- 31. 1989 April
- 1. 1989 Revised Technical Specifications May
- 1. 1989 (without "Sholly")
May
- 15. 1989 for imi Plante Septenber
- 1. 1989 fcomplete with "Sholly")
Septaber 15, 1989 4
5
Enclosure (2)
E llU ATTENDFFR
! PEE AFFILIATION Rotert Gill Dh.e Power Richard A. Bernier Arizona Public Service Stu Weteter Comtnation Er.2ineering Courtney Smyth GFil tbclear Robert Turner Batcock and Wilcox Les Bencini Westinghcose R. R. Sgarro PP&L Donald R. Hoffra FWKG TSC J12n Klapproth General Electric Jchn Fowler SERI Jacquie Hinds Pacific Gas & Electric Ed Lo ito Virginia Power Walt Smith nut %RC Ed Eutcher NRC/UTSB Rich Fich NBC/UTSB Smi Bryan bT /UTSB Mark Reinhart NRC/UTSB Kulin Tesai NRC/UTSB