_-_-_

Georg'a Power Corppany Post Off,ce Box 282 Waynesboro. Georg.a 30810

  • Telechere 404 554 4961 Estens<;n 3413 404 724 BM4 Enterc,an 3413 m

Georgia Power R D. Ric.

&'p'7ly n

, m.ex <.w September 22, 1988 United States Nuclear Regulatory Commission ATTN: Document Control Desk File: X78G10 Washington, D. C.

20555 Log: GN-1492

Reference:

Vogtle Electric Generating Plant - Unit 2 USNRC Inspection Report 50-425/88-19 The Georgia Power Company wishes to submit the following infonnation i

concerning the violation in the referenced inspection report.

Violation 550-425/88-19-01, Failure to Follow Procedures, Resulting in Errors in Pipe Support QC and Design Documentation.

The Georgia Power Company (GPC) acknowledges the violation as identified in the USNRC report.

This violation has been attributed to isolated human errors and failure to follow procedures due to procedure interpretation errors.

The errors were corrected by revising the drawings to reflect actual dimensions and to agree with the requirements of the Final Design Verification Program.

A deviation report was written and was dispositioned to accept the support location as-is.

The void Issue Ticket was deleted from the Process Package and the correct Issue Ticket was placed in the package.

To prevent recurrence, the Pullman Power Products Procedure X-24 was revised to require all redlined data, except fillet weld sizes, to be incorporated on the mylar.

Engineering Supervision conducted a training session with l

all draftsmen on the requirements of Procedure X-24, with special emphasis l

on typical errors identified.

Full compliance was achieved on July 19, 1988.

l oxNu,

,7 P. D. Rice 8'

xc: USNRC - Region !!

Suito 2900 101 Marietta St., N.W.

)

Atlanta, GA 30323

)

H. G. Baker, Jr.

D. R. Altman C. W. Hayes J. P. Xane J. A. Bailey R. W. McManus R. H. Pinson G. Bockhold, Jr.

Sr. Resident (NRC)

E. D. Groover G. R. Frederick D. H. Smith (OPC)

C. T. Moore J. F. Swartzwelder J. E. Joiner (TSLA)

R. A. Thomas A. B. Gallant NORMS g

2 MA M88$!?