Forwards Vol 2, Inservice Testing Program Plan for Pumps & Valves, Revs 4 & 2 to Units 1 & 2,respectively,of Inservice Insp Program Plan for Second Insp Interval
ML20155B908
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/30/1988
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18151A340 List: ... further results
References
88-024A, 88-24A, NUDOCS 8810070127
Download: ML20155B908 (2)


Text

VruarxrA lir,ncrui.c AND POWEH CO>tI*MY H ren>tonn. Vinoix3A ununi September 30, 1988 U. S. Nuclear Regulatory Comission Serial No. 88-024A Attn: Document Centrol Desk PES /ISI/DJF:Rev. 2 ,

Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 l Gentlemen:  !

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2

_ CHANGES TO THE ASME SECTION XI INSERVICE TESTING PROGRAM FOR PUMPS AND VALVES On March 29 and 30, 1988, meetings were held between the NRC and Virginia Electric and Power Company to discuss NRC questions and concents pertaining to the Surry Units 1 and 2 Section XI Inservice Testing (IST) Program for Pumps and Valves. As a result of these meetings, the Inservice Testing Programs for Pumps and Valves for Units 1 and 2 have been revised. In this submittal are 5 copies of the revised programs (Revision 4 for Unit 1 and Revision 2 for Unit

2) along with one set of Unit 1 supporting drawings. Another set of drawings was sent airectly to EG8G per your instructions.

Also included are Attachment 1, which contains the original NRC questions and coments , the formal response: to the questions and convents and a description of changes to the programs, and Attachment 2, which contains the maximum value of full-stroke times for Unit ) valves.

We intend to implement the revised IST Program before the final SER is issued.

The revised program has received a detailed review by the NRC and NRC recomendations have been incorporated. Therefore, the revised program represents current industry practices and should be implemented in a timely manner.

i We will have quarterly procedures for Units 1 and 2 revised to the new IST programs by 6/1/89 unless a different implementation date is given in the

^

programs. Cold shutdown and refueling procedures will be revised by the next refueling for each unit. Open item 0.4 in Attachment 1 and the maximum values of full stroke tines not listed in Attachment 2, will be determined by December 1, 1988. The comparable values for Unit 2 will also be determined within this same timeframe.

l05 80100701.77 n0093o /

PDR ADorg osopopOO IO 0 PNU

Should you require additional information regarding these items, please contact us.

Very truly yours W. R. Cartwrig t Vice President - Nuclear Attachments cc: U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station l