, - o.
p2 M4 UNITED STATES 9
y \ NUCLEAR REGULATORY COMMISSION b* e REGION IV
,o URANIUM RECOV FIELD OFFICE DENVER, COLORADO 80225 JA. 281988 URF0:SRG Oocket No. VM-48 HEMORANDUM FOR: Docket File No. WM-48 FROM: Scott R. Grace, Project Manager Licensing Branch 1 Uranium Recovery Field Office, Region IV
SUBJECT:
CLARIFICATION OF TYP0 GRAPHICAL ERROR IN THE NOVEMBER 16, 1987, DURANGO TECHNICAL EVALUATION REPORT
- BACKGROUND 4
The report entitled, "Final Technical Evalaution Report for the Proposed Remedial Action at the Durango Tallings Site, Ourango, Colorado," (TER) with accompanying transmittal memo dated November 16, 1987, contains a typographical error that has led to some confusion. The staff believes that it is necessary to clarify any confusion that may have been created as a result of the
- typographical error .
DISCUS $10N -
Section 3.4.3, Ground-Water Impacts - Disposal Site of the TER, third paragraph, last sentence, contains a typographical error for the Darcian infiltration rate. The TER has a value of 0.0022 cm/yr. This value should be 0.315 cm/yr. The text states: For greater conservatism, a value of IE-8 cm/s
, and a unit gradient of one was used to calculate a Oarcian infiltration of
- 0.0022 cm/yr, for a total estimated infiltration and saturation time of greater than 500 years. Using 0.0022 cm/yr to calculate the time to infiltrate a
!{
6-foot thickness results in a value of 83,091 years. This is significantly different thei the "greater than 500 year" conclusion in the TER. Using the -
i correct result of the Darcian equation, 0.315 cm/yr gives an actual result of i 580 years.
SUMARY The typographical error is noted and clarified. As noted in the TER, additional information on the potential for infiltration of the cover is ;
required from 00E and the staff are deferring their final conclusions on ground '
m
.- e.
2 JUL. 28 IW water at the Durango site until such time that DOE re-evaluates infiltration.
Staff review of additional information will be presented as a supplement to the TER..
d 9O Scott R. Grace, Project Manager Licensing Branch 1 Uranium Recovery Field Office Approved by: A Eoward F. Flawkint, Chief Licensing Branch 1 Uranium Recovery Field Office, Region IV cc: M. Fliegel, LLOB R. J. Starmer, LLTB-P. Lohaus, LLOB J. Surmeier, LLT8 s
a
.: .; o.4 e
WM-48/SRG/88/07/28/0 DISTRIBUTION Docket File WM-48
/ POR/DCS %
R. L. Bangart, RIV SGrace RCPD, CO LLO Branch, LLWM-URF0 r/f i
e3 w
j
- g a u- ,.
- , >
n, y q -
1 ; ,
m
- 6 ,
l .
I CONCURRENCE: DATE: '
EHawkins/URF0 */d c.s.