ML20155A904

From kanterella
Jump to navigation Jump to search
Forwards Vols 1-26 to Rev 8 of UFSAR for Vogtle Electric Generating Plant,Per 10CFR50.4(b) & 50.71.Rev Reflects Changes Through 980420
ML20155A904
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/20/1998
From: Beasley J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155A908 List:
References
RTR-NUREG-0737, RTR-NUREG-737 LCV-1213-D, NUDOCS 9810300016
Download: ML20155A904 (2)


Text

~

]

.~. Bernie Beasley, Jr., Pi Southem Nucioar.

$*~

J ej y Vice President Operating Company, loc.

Vogtle Pro,iect 40 kuerness Center Parkway P0. Box 1295 Birrningharn. Alabama 35201-Tel 205 992.7110 Fax 205 992.0403 SOUTHERN COMPANY Enargy to Serve Your%rld" October 20,1998 LCV-1213-D Docket Nos.

50-424 50-425 U. S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Gentlemen:

In accordance with the 10 CPR 50.4 (b) and 50.71 (e) Southern Nuclear Operating Company (SNC) hereby submits one signed original and ten copies of the entire content of the Vogtle Electric Generating Plant Updated Final Safety Analysis Report (UFSAR) including Revision 8. This submittal ip' provided on a replacement page basis and is accompanied by an effective page list that id(ntifies the current pages of the UFS AR. The replacement pages which are indicated as Revis on 8 reflect changes through April 20,1998.

Mr. J. B. Beasley, Jr. states that he is a vice president of SNC and is authorized to execute this oath on behalf of SNC atid that, to the best of his knowledge and belief, the information contained in the enclosed UFSAR Revision 8 accurately presents changes made since the 7revious submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

SOUTIlERN NUCLEAR OPERATING COMPANY e

'/

/

Gy; s.

/

J. B. Beasley, r, l ^

F iV Sworn to and subscribed before me this /

day of b,1998.

hh1% lek, I

Nota'ry Public amium 6f s \\\\

L MMf 7S.

i

"DA 288M Pd888u K

PDR i'

f

l

.o, -

t.1 U. S. Nuclear Regulatory Commission

' Octobei 20,1998 Page 2 JBB/JLL

Enclosure:

Updated FSAR, Revision 8 xc:

Southern Nuclear Operating Company Mr. J. T. Gasser Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D.11. Jaffe, Senior Project Manager, NRR Mr. l. Zeiler, Senior Resident Inspector, Vogtle e

i f-r C ="