NRC Staff Response to Joint Intervenors Motion to Admit Exercise Contention Or,In Alternative,To Reopen Record.* Joint Intervenors 880916 Motion Should Be Denied.Certificate of Svc Encl
ML20155A873
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 10/03/1988
From: Berry G
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To:
Atomic Safety and Licensing Board Panel
References
CON-#488-7213 OL-1, NUDOCS 8810060105
Download: ML20155A873 (12)


Text

. _ _

f S /3 10/03/88 O

DCCKETED UMC UNITED STATES OF APERICA NUCLEAR REGULATORY COMMISSION

'88 (CT -4 P5 :11 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD fjf ~,

In the Matter of

)

)

Docket Nos.

50-443 OL-01 PUBLIC SERVICE COMPANY OF

)

50-444 OL-01 NEW HAMPSHIRE, et al.

)

On-site Emergency Planning

~

)

and Safety Issues (Seabrook Station, Units 1 and 2)

)

NRC STAFF RESPONSE TO JOINT INTERVENORS' MOTION TO ADMIT EXERCISE CONTENTION OR, IN THE ALTERNATIVE, TO REOPEN THE RECORD INTRODUCTION On September 16, 1988, the New England Coalition On Nuclear Pollution (NECNP), the Seacoast Anti-Pollution League (SAPL), the Town of Hampton, and the Massachusetts Attorney General (collectively "Joint Intervenors")

filed a

  • Motion To Admit Exercise Contention Or, In The Alternative, To Reopen The Record"

("Motion")

in which they request the "on-site" Licensing Board to admit a contention which alleges that there were "fundanental deficiencies" in the emergency planning exercise conducted by Applicants en June 27-29, 1988, and that the alleged deficiencies preclude a finding that there is reasonable assurance adequate protective measures can and will be taken by Applicants in the event of a radiological emergency.

See Motion at 1 and Exhibit 1 at 1.

In the event the Board determines that the record has been closed in the on-site portion of this proceeding, Joint Intervenors r:ove that the record be reopened for the purpose of admitting their contention. Motion at 1.

gn R86&i82A83h3 j),,7

2 As explained below, a balancing of the five factors listed in 10 C.F.R. 6 2.714(a)(1) weighs against admitting Joint Intervenors' untimely contention.

The motion to admit the contention should be denied. II DISCUSSION Contrary to the position of Joint Intervenors, the contention proffered by them is untirely.

The proffered contention comes nearly eighteen months after the issuance of the Licensing Board's March 25, 1987 j

initial decision and alnost two years after the record was closed in the cosite emergency planning phase of this case.

In these circumstances, the proffered contention must be considered "nontimely" as that term is used in 10 C.F.R.

l 2.714(a)(1).

That section provides that before an untimely, though otherwise admissible, contention may be accepted for litigation, the proponent must demonstrate that a balancing of the five i

-1/

The Staff agrees with Joint Intervenors that the emergency planning I

exercise conducted by Applicants on June 27-29, 1988 is "material" to the determination whether there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.

See Union of Concerned Scientists v. NRC, 735 F.2d 1437, 1443-44 (D.C. Cir. 1984).

For this reason, the Staff does not discuss herein whether the Joint Intervenor's alternative motion to reopen the record reets the standards set forth in 10 C.F.R. l 2.734.

However, requiring that the instant late-filed contention satisfy the requirements of 10 C.F.D.

I2.714(a)(1) does not violate Joint Intervenors' hearing rights under section 189a of the Atomic Energy Act because it has been held that the Comission may place, in the interest of efficient administrative process, reasonable procedural requirements concerning the exercise of that right.

See le..

Duke Power Cem any (Catawba Nuclear

Station, Units 1

and 2),

CL1-83-19, 1 at 1045, citing, BPI v. AEC, 502 F.2d 424 (D.C.

Cir. 1974); Easton Utiliti,es Comission v. AR 424 F.2d 847 (D.C.

Cir. 1970).

factors listed in 10 C.F.R. i 2.714(a)(1) weigh in favor of admitting the contention.

E.g.

10 C.F.R.

Q 2.714(a)(1); Conronwealth Edison Company (Braidwood Nuclear Power Station, Units 1 and 2), CLI-86-8, 23 NRC 241 (1986); Duke Power Company (Catawba Nuclear Station, Units 1 and 2),

CLI-83-19, 17 NRC 1041 (19P,3); Public Service Company of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-883, 27 NRC 43, 49 (1988).

The five factors are:

(1)

Good cause, if any, for failure to file on time.

(ii)

The availability of other means whereby the petitioner's interest will be protected.

(iii)

The extent to which the petitioner's participation n'ay reasonably be expected to assist in developing a sound record.

(iv)

The extent to which petitioner's interest will be represented by other parties.

(v)

The extent to which petitioner's participation will broaden the issues or delay the proceeding.

10 C. F.R.

5 2.714(a)(1).

As shown below, a balancing of these factors nilitates against the admission of Joint Intervenors' late-filed contention.

1.

Good cause As the Commission itself has noted, "this first factor is a crucial element in the analysis of whether a late-filed centention should be admitted."

Braidwo,od, supra, CLI-86-8, 23 NRC at 244 In Braidwood, the Comission also reaffirmed the well settled principle that a proponent who "fails to satisfy this element" of the test "rust make a ' compelling'

4 showing with respect to the other four factors."

Id.; accord Mississippi Power and Light Company (Grand Gulf Nuclear Station, Units 1 and 2),

ALAB-704, 16 NRC 1725 (1982).

Joint Intervenors argue that there is good cause for failing to file the proffered contention earlier. They are only partly correct.

Inasmuch as the emergency planning exercise referenced in the contention was not conducted until June 27-29, 1989, they of course cannot be faulted for not raising the issue before then. However, Joint Intervenors admit that they received a copy of the NRC Inspection Report No. 50-443/88-09 on or about July 15, 1988.

See Motion at 9.

This Staff inspection report forms the basis for Joint Intervenors' late-filed contention U and had been in their possession for more than six weeks prior to the filing of their late-filed contention.

It is this six week period of inaction on Joint Interveners' part that precludes a finding of good cause for the delay in filing the proffered contention.

And it is from the date which this infonnation first was nade publicly available (July 6,1988) that the time period for evaluating whether there is good cause for the untirely filing begins to run.

See Metropolitan Edison Company ;%ree Mile Island Nuclear Statien, Unit 1), ALAB-815, 22 NRC 198, 201 (1985).

Neither of the reasons advanced by Joint Intervenors for not filing earlier during this period are sufficient to establish good cause.

First, Joint Intervenors state that it was necessary to await receipt of "the exercise scenario documentation" to gain "a

proper technical 2/

Compare Motion. Exhibit I and accompanying Affidavit of Robert D.

E lard, with, Inspection Report 88-09 at 5, attached to Motion as Exhibit A.

understanding" of the Seabrook personnel's actions and that the report was not received by them until the week of August 15, 1988.

Motion at 9-10.

The unavailability of this document does not establish good cause.

The i

case law is clear that the unavailability of a licensing-related document does not establish good cause if information was publicly available early enough to provide the basis for a more timely filing of the contention.

E.g. C_atawba, supra, CLI-83-19, 17 NRC at 1045; Id., ALAB-813, 22 NRC 59, 84 85 (1985).

Since Joint Intervenors' late-filed contention is based on T

the "weaknesses" in the emergancy planning exercise identified by the Staff in inspection Report 88-09, it is apparent that information sufficient to enable them to formulate the basis for their contention was publicly availabe as early es July 6, 198 E., the date the report was issued.

)

i Joint Intervenors also seek to justify their untimely filing by noting that the Licensing Board in the "off-site" emergency planning phase i

of the proceeding afforded the parties in that proceeding until September l

21, 1988 to submit contentiers challenging the emergency planning exercise 1

I conducted by Applicants.

Motien at 10.

That the off-site Board may have

)

done 50 is decisicnally irrelevant as to whether there is good cause for Joint Intervenors' untimely filing of the proffered contention in the

)

"on-site" portion of the cas?,

As Joint Intervenors are or should be aware, scheduling orders issued by the off-site Board are applicable only 4

to that proceeding.

Moreover, it was or should have been apparent to Joint Intervenors that their late-filed contention has the potential for

)

expanding considerably the on-tite phase of the proceeding.

In view of i

the advanced stage of the on-site proceeding, it was encumbent upon Joint l

I

\\

Intervenors to bring that contention to the Board and the parties at the i

earliest possible time.

Inexcusably, they failed to do so.

Thus, the i

first of the five factors -- good cause -- should weigh heavily against them.

I e

2.

Other means or parties to protect Joint Intervenors' l

interests.

{

The second factor -- the availability of other means to protect petitioner's interest -- favors Joint Intervenors.

As does the fourth factor: the extent to which petitioner's interest will be represented by I

i other parties.

However, as the Comission has observed, these factors are "accorded less weight, under established Comission precedent, than factors one, three, and five."

Braidwood, supra, 23 NRC at 245; South Carolina _ Electric and Gas Compa3 (Virgil C. Summer Nuclear Station, Unit l

l 1), ALAE-f47, 13 NRC 881, 895 (1981).

(

i 3.

Extent to which petitioner can contribute to the developrent i

of a sound record.

l The Comission's case law erphasizes the irportance of the third t

]

factor: the extent to which petitioner can contribute to the developrent l

1 I

i of a sourd record.

The Comissien has observed that "{w] hen a petitioner t

a l

addresses this criterion it thnuld petitioner Nst set out with as much l

particularity as possible the precise issues it plans to cover, identify f

t l

its prospective witnesses, and sumarize their proposed testimony."

t Braidwood, supra, 23 NRC at 246, quoting, Grand Gulf, supra,16 NRC at I

i 1730 (emphasis added).

Joint Intervenors have not identified any prospective witnesses.

Joint Intervenors do not set out with precision i

r t the issues they plan to cover or identify their prospective witness by name.

Instead, they state only that they will provide an expert witness "who will analyze the emergency response actions taken by the Seabrook Station staff and describe in detail the manner in which those actions reflect the failure of that sta" to corrprehend the significance of plant f

i conditions and identify the appropriate measures needed to prevent any further plant deterioration and/or further offsite radiological releases."

l Motion at 10.

However, since Joint Intervenors have not indentified witnesses or provided anything other than generalities concerning the evidence they will offer, this factor weighs against the admission of the contention.

4 Broadening of issues and delay to the proceeding Joint Intervenors' late filed contentien will result in a broadening of the issues and will delay the completion of the on-site proceedir1 This cannet be disputed. The late-filed contention seeks to inject issues that have not been raised previously.

It takes no great leap of faith to assure thet Joint Intervenors will request an extensive amount of time to cer. duct discovery and it is fair to say Also that in the event that the issue is rot disposed of sumarily, the anticipated amount of hearing time reeded to litigate the contention will be extensive.

The Board should find that the late-filed contention will occasion a broadening of the issues.

Similarly, the Board should find that Joint Interveners' late-filed contention will result in a significant delay to this proceeding.

As r.oted earlier, the record in the on-site phase of this proceeding has been

8 clcsed for nearly two years.

All that is left of the Licensing Board's jurisdiction over the proceeding are the issues remanded by the Appeal Board in ALAB-875 lNECNP Contention I.V and IV), ALAB-883 (Massachusetts Attorrey General's Alert Notification Contention), and ALAB-891 (NECNP Contention !.B.2).

Litigation of the contentions remanded in ALAB-875 has been concluded favorably to Applicants.

See ALAB-899.

Applicants have noved for sumary disposition of the contentions remanded in ALAB-891 and ALAB-883 on September 9 and 17,1988, respectively.

Responses to those riotions and a decision thereon soon will be forthcoming.

To admit Joint Intervenors' late-filed contentinn at this stage will substantially delay the corpletion of the proceeding.

The fif th factor rust weigh heavily against Joirt Interverors. U In sum, the first, third and fif th factors weigh against the Joint Intervenors; the second and forth factors weigh in Joint Intervenors' i

faver.

The showing made by Joint Intervenors on the two factors favorable to them fall far short of the "compelling" showing required to overcome the lack of good cause for the untirely filing of their contention.

See Braidwood, supra, 23 NRC at 244 Thus, a balance of all 3/

Joint Intervenors concede that admission of the late-filed contention

~

will broaden the issues but argue that this fact is outweighed by the significerce of the issues raised.

Assuming arouendo that Joint Intervenors are correct in conterding that the issue sought to be raised is "absolutely vital to the safety of the public." this argument is entitled to no weight in considering the fifth factor.

Sae Braidwood, curra, ?3 " C at 248 (it is errer for a Board "to make its cwn baTaneing of significance versus delay in its evaluation of the fifth factor alone.").

t I

\\

P 9

the factors leads to the conclusion that the late-filed contention should not be admitted. M CONCLUSION For the reasons stated in this response, Joint Intervenors' motion to admit their late-filed contention should be denied.

R

.tfully submitted, D

r cry

'r y Counsel or N Staff Dated at Rockville, Maryland this 3rd day of October 1988 l

l l

l l

4/

Denying Joint Interverers' motion will not work an unfairness on them

~

or compromise safety.

As the Appeal Board has observed. "at the operating license stage, the Staff generally has the final word on all safety matters not placed in controversy by the parties through an admitted contention."

Southern California Edison Company (San Onofre Nuclear Generating Stations Units 2 and 3), ALAB-68D^.16 NRC

127, 143 (1982);

accord South Carolina Electric and Gas Comsany (Virgil E. Sumer Nuclear Station Unit IT~ ALAB-642, 13 NRC JET' 095 96 (1981), aff'd sub nom.

Fairfield United Action v. Nuclear ReculatJry Comission, N ITd,261 (D.C. Cir. 1982) ("As to those aspects of reactor operation not considered in an adjudicatory proceeding (if one is conducted), it is the Staff's duty to insure the existence of an adequate basis for each of the requisite Section 50.57 deteminations").

l

. ~.

1 i D L iri.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD 0

Docket Nos. 50 Og"!'-

in the Matter of i

3 0L?.01 -

PUBLIC SERV!CE COMPANY OF 50-444 OL-01' NEW HAMPSHIRE, el a,1.

On-site Emergency Planning and Safety Issues (Seabrook Station, Units 1 and 2)

CERTIFICATE OF SERV!CE I hereby certify that copies of "NRC STAFF RESPONSE TO MASSACHUSETTS ATTORNEY GENERAL'S REQUEST TO FILE REPLY TO APPLICANTS' ANSWER TO MOTION TO AMEND BASIS FILED BY MASSACHUSETTS ATTORNEY GENERAL WITH RESPECT TO $1REN CONTENTIONS" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, or as indicated by an asterisk, by deposit in the Nuclear Regulatory Comission's internal mail system, this 3rd day of October 1988:

Sheldon J. Wolfe, Esq., Chairman

  • Decketing and Service Sectien*

Administrative Judge Office of the Secretary Atomic Safety and Licensing BJard U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Comission Washington, DC 20555 Washington, DC 20555 Thomas G. Dignan, Jr., Esq.

Dr. Jerry Harbour

  • Robert K. Gad, III, Esq.

Administrative Judge Ropes & Gray Atenic Safety and Licensing Board 225 Franklin Street U.S. Nuclear Regulatory Comission Boston, MA 02110 Washington, DC 20555 Ashod N. Amirian Esq.

Dr. Enreth A. Lueble Town Counsel for Merrimac Administrative Judge 376 Main Street 4515 Willard Avenue Haverhill. MA 08130 Chevy Chase, Maryland 20815 H. J. Flynn, Esq.

Atomic Safety and Licensing Assistant General Counsel Appeal Panel (5)*

Federal Emergency Management U.S. Nuclear Regulatory Comission Agency Washington, DC 20555 500 C Street, SW Washington OC 20472 Atonic Safety and Licensing Board Panel (1)

Sheldon J. Wolfe Esq.

U.S. Nuclear Regulatory Comission Administrative Judge Washington, OC 20555 1110 Wirbledon Drive McLean, VA 22101

2 Philip Ahren. Esq.

Calvin A. Canney Assistant Attorney General City Hall Office of the Attorney General 126 Daniel Street State House Station Portsmouth, NH 03801 Augusta. ME 04333 Mr. Angie Machiros, Chairman Carol S. Sneider, Esq.

Board of Selectmen Assistant Attorney General 25 High Road Office of the Attorney General Newbury, MA 09150 1

One Ashburton Place, 19th Floor l

Boston, MA 02108 Allen Lampert Civil Defense Director George Dana Bisbee, Esq.

Town of Brentwood Assistant Attorney General 20 Franklin Office of the Attorney General Exeter, NH 03833 25 Capitol Street Concord, NH 03301 William Armstrong Civil Defense Director Ellyn R. Weiss, Esq.

Town of Exeter Diane Curran, Esq.

10 Front Street Harmen & Weiss Exeter, NH 03833 2001 S Street, NW Suite 430 Gary W. Holmes, Esq.

Washincton, DC 20009 Holmes & Ellis 47 Winnacunnet Road Robert A. Backus, Esq.

Hampton, NH 03842 Backus, Meyer & Solomon 116 Lowell Street J. P. Nadeau Manchester, NH 03106 Board of Selectmen 10 Central Street Peul McEachern, Esq.

Rye, NH 03870 Patthew T. Brock, Esq.

Staires & McEachern Judith H. Mizner Esq.

25 Maplewood Avenue Silverglate, Gertner, Baker, P.O. Box 360 Fine & Good t

Portsmcuth, NH 03801 88 Board Street i

Charles P. Graham, Esq.

I NcKay, Murphy & Grahan Robert Carrigg, Chairrnan i

100 Main Street Board of Selectmen Amesbury, PA 01913 Town Office Atlantic Avenue Sandra Gavutis, Chairman North Hampton, NH 03870 Board of Selectnen RFD *1, Box 1154 Kensington, NH 038??

{

l

. o Willian S. Lord Peter J. Matthews, Mayor Board of Selectmen City Hall Town Hall - Friend Street Newburyport. NN 09150 Anesbury, MA 01913 Michael Santosuosso, Chairman Mrs, Anne E. Goodman, Chaiman Board of Selectmen Board of Selectmen South Hampton, NH 03827 13-15 Memarket Road Durhan NH 03824 Hon. Gorden J. Humphrey United States Senate 531 Hart Senate Office Building Washington, DC 20510 C 40fRv by ini

~ Gregory Ayn'Berr/'

y Counsel g NRC (taff

-