Supplemental Deficiency Rept CP-88-15 Re Containment Max Flood Level.Initially Reported on 880118.Unit 1 Corrective Actions Scheduled for Completion on 880215.Unit 2 Correction Schedule Unchanged
ML20155A866
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/28/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-88-15, TXX-88704, NUDOCS 8810060102
Download: ML20155A866 (1)


Text

_ _ _ _ _ _ _ _ _

i i

FE Log # TXX-88704 File # 10110

=

=

903.6 N/ ELECTRIC Ref. # 10CFR50.55(e) 4 Z,*gg September 28, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHEPEAKSTEAMELECTRICSTATION(CPSES)

DOCKET N05. 50-445 AND 50-446 CONTAINMENT MAXIMUM FLOOD LEVEL SDAR: CP-88-15 (SUPPLEMENTAL REPORT)

Gentlemen:

On January 18, 1988, TU Electric letter logged TXX-88115 p'ovided nctification r

that the deficiency involving containment maximum flood level was reportable under the provisions of 10CFR50.55(e).

The last report on this issue, logged TXX-88684, was submitted September 16, 1988.

This supplemental report is submitted to correct an editorial error of the completion schedule for Unit I corrective actions.

~

TXX-88684 indicated that corrective actions for Unit I would be completed by

[

February 15, 1988. Unit I corrective actions for this activity are scheduled i

for completion by February 15, 1989. Unit 2 corrective actions for this activity remain unchanged.

very truly yours, l

)

u.c.. a W. G. Counsil i

s By'D. R. Woodlan l

Docket Licensing Manager l

f HAM /mlh c - Mr. R. D. Martin, Region IV Resident inspectors. CPSf5 (3)

[

I h 8810060102 88092S PDR ADOCK 05000445 s

PDC KC North Ouve Street LB 81 Lkt!.ts. Trus 13:01 l

..m

,3..,_,_

...,,, _. _., _ _ _. - _ _, _ _,, ~.... _ _. _, _ _ _

--.m

,y

,