|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20237E9811998-08-25025 August 1998 Summary of 980708 Meeting W/Tva & Framatome Cogema Fuel in Rockville,Md Re Ongoing Efforts W/Doe to Fabricate & Install Four Lead Test Assemblies in Plant,Unit 2 Core During Cycle 10 Refueling Outage in Spring of 1999.Attendance List Encl ML20216H5261997-08-26026 August 1997 Summary of 970822 Meeting W/Util in Rockville,Md Re Followup to Series of Conference Calls on 970418,discussing Results of Recent Steam Generator Insps at Sequoyah Unit 1.List of Attendees,Handouts & Staff Questions Encl ML20140B4701997-06-0404 June 1997 Summary of 970530 Meeting W/Tva in Rockville,Md to Discuss Status of Thermo-Lag Fire Barrier Corrective Action Program at Plant & Schedule for Completion of Program.W/Attendance List & TVA Handout ML20140G5621997-05-0808 May 1997 Summary of 970227 Meeting W/Tva in Rockville,Md to Discuss Sequoyah Conversion to Framatome Cogema Fuel.List of Attendees Encl ML20134J7451996-11-0808 November 1996 Summary of 961104 Meeting W/Tva in Rockville,Md Re Status of Thermo-Lag Fire Barrier Upgrades at Plant.List of Attendees & Copies of Handouts Encl ML20129H5211996-10-29029 October 1996 Summary of Operating Reactors Events Meeting 96-13 on 961023,informing Senior Managers from Ofcs of Commission,Oe, NRR & Regional Ofcs of Selected Events That Occurred Since Last Briefing ML20217D1931994-03-0707 March 1994 Summary of Sequoyah Restart Panel 940303 Meeting in Region II Ofc Re Status of NRC & Licensee Activities for Restart of Unit 1.Meeting Minutes & Unit 1 Restart Action Plan Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217D2111993-06-16016 June 1993 Summary of Sequoyah Restart Panel 930614 Meeting in Region II Ofc Re Plant Restart & Listed Items.List of Attendees & Checklists Encl.Next Meeting Will Be Held on 930622 ML20127D1321993-01-12012 January 1993 Summary of Operating Reactors Events Meeting 93-01 on 930106 ML20058J8621990-11-27027 November 1990 Summary of 901005 Meeting W/Util in Rockville,Md Re Cable Conduit Testing Program.Viewgraphs & Attendee List Encl ML20058K0311990-11-23023 November 1990 Summary of Operating Reactors Events Meeting 90-28 on 901114 Re Reactor Scrams for Wk Ending 901111.Attendees Listed ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059N2091990-09-21021 September 1990 Summary of 900919 Operating Reactors Events Meeting 90-023 to Discuss Significant Elements ML20059D8121990-09-0505 September 1990 Summary of 900817 Meeting W/Util in Rockville,Md Re Schedules of Certain Mods Committed for Completion in Unit 2 Cycle 4 Refueling Outage.Engineeering for Unit 2 Will Be Completed Before Restart from Outage ML20056B4101990-08-20020 August 1990 Summary of 900723 Meeting W/Util in Rockville,Md Re Plant Cable/Conduit Testing Program for safety-related Cable.List of Attendees,Tva & NRR Handouts & Transcript of Meeting Encl ML20055E2081990-07-0505 July 1990 Summary of 900531 Meeting W/Tva in Rockville,Md Re Plant safety-related Cable Inside Containment.List of Attendees, & Handouts Presented at Meeting Encl ML20246J8031989-07-12012 July 1989 Summary of 890609 Meeting W/Util in Rockville,Md Re Dissolution of Engineering Assurance Organization.List of Meeting Attendees,Util Handout,Agenda & Transcript Encl ML20245F9761989-06-22022 June 1989 Summary of 890614 Meeting W/Util & Westinghouse in Rockville,Md Re Future Work for Facility Cycle 4 Refueling Outage ML20247M1001989-05-26026 May 1989 Summary of 890511 Meeting W/Util in Rockville,Md Re Performance of Best Estimate Calculations for App K Analyses.Proposed Plan for LOCA Analyses,Meeting Handouts & List of Attendees Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20155A8081988-09-29029 September 1988 Summary of 880915 Meeting W/Util in Rockville,Md Re Microbiological Influenced Corrosion Program at Plant.List of Attendees & Viewgraphs Encl ML20154M9231988-09-21021 September 1988 Summary of 880913 Meeting W/Util at Site Re Unit 2 Shutdown Margin & Unit 1 Restart Readiness,Per Insp Repts 50-327/88-35 & 50-328/88-35.List of Attendees & Related Info Encl ML20154H4341988-09-16016 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Conditions Adverse to Quality Program.List of Attendees Encl ML20206B1961988-07-29029 July 1988 Summary of ACRS Subcommittee for TVA Organizational Issues 880722 Meeting in Washington,Dc Re Generic Lessons Learned from NRC Review of Util Concerning Restart of Facility ML20153A8371988-07-0101 July 1988 Summary of 880622 Meeting W/Util in Rockville,Md Re TVA Commitments on Facility.List of Attendees & Util Handout Encl ML20150E2321988-06-21021 June 1988 Summary of 880613 Meeting W/Util to Discuss Restart of Facility in Light of Recent Scrams from Power.Transcript of Meeting Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20154A4061988-05-0404 May 1988 Summary of 880414 Meeting W/Util in Rockville,Md Re Differences Between Units 1 & 2 Nuclear Performance Plan. List of Attendees & Licensee Handout Encl ML20151D2701988-03-12012 March 1988 Summary of ACRS Subcommittee on TVA Organizational Issues Meeting on 880202-03 in Chattanooga,Tn Re Review of TVA Mgt Reorganization & Issues Re Restart of Unit 2 ML20149M6071988-02-22022 February 1988 Summary of 880211 Meeting W/Util Re Load Sequencing of Plant Diesel Generators.Attendance List & Handout Matl Used During Meeting Encl ML20148Q0801988-01-21021 January 1988 Summary of Operating Reactors Events Meeting 88-03 on 880119.List of Events & Summaries of Presented Events & 1988 Scrams Encl ML20195J5251988-01-21021 January 1988 Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant ML20195J6011987-12-0303 December 1987 Summary of ACRS Subcommittee TVA Organizational Issues 871004 Meeting W/Nrc & Util in Washington,Dc Re Actions Being Taken on Plant Restart Issues ML20236X4741987-12-0202 December 1987 Summary of 871124 Meeting W/Util in Bethesda,Md Re Results of Testing of Silicone Rubber Insulated Cables for Unit 2. Transcript of Meeting Encl ML20236K8951987-11-30030 November 1987 Trip Rept of 871028-30 Site Visit to Gather Info from Files to Facilitate Updating Sims Database ML20235B2261987-09-15015 September 1987 Summary of 870910 Meeting W/Util in Knoxville,Tn Re Status of Cable Test Program.List of Attendees & Transcript Encl ML20235B1271987-09-15015 September 1987 Summary of 870911 Meeting W/Tva Re NRC Staff Presentation to TVA Findings from Integrated Design Insp.List of Attendees & Meeting Transcription Encl ML20239A6691987-09-0404 September 1987 Summary of 870901 Meeting W/Util,Bechtel & S&W in Bethesda, MD Re Criteria for Pipe Supports.List of Attendees,Handouts & SQN-DC-V-24.2 Supports for Rigorously Analyzed Category I Piping Encl ML20237G7631987-08-26026 August 1987 Summary of 870819 & 20 Meetings W/Util at Facility Re Status of Technical Issues Requiring Resolution Prior to Restart. List of Attendees,Agenda & Handouts Encl ML20235X0921987-07-16016 July 1987 Summary of 870713 Meeting W/Util,Franklin Research Ctr, Sandia,S&W & NUS Corp in Bethesda,Md Re Cable Testing Program.Util Proposing Revised Cable Testing Program to Test 380 Cables.Attendees List & Transcript Encl ML20234B9831987-06-26026 June 1987 Summary of 870619 Meeting W/Util in Bethesda,Md Re Util Proposed Program for Regeneration of Nonretrievable Pipe Support Calculations & Verification of Technical Adequacy of Existing Calculations.Attendees List & Util Handout Encl ML20216D0121987-06-19019 June 1987 Summary of 870601 Meeting in Bethesda,Md to Discuss Special Employee Concern Program.Attendee List & Handouts Encl ML20215A1881987-06-0909 June 1987 Trip Rept of 870520-22 Visit to Regional Ofc & Site to Discuss Ofc Procedures for Processing of Util Allegations & Status of Essential Elements of Restart Program ML20214H8681987-05-18018 May 1987 Summary of 870326 Meeting W/Util Re Diesel Generator Sequencing Calculations.Util Response to Questions in Form of Rev 5 to Calculations,Engineering Change Notification, List of Attendees & Other Related Documents Encl 1999-07-16
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20237E9811998-08-25025 August 1998 Summary of 980708 Meeting W/Tva & Framatome Cogema Fuel in Rockville,Md Re Ongoing Efforts W/Doe to Fabricate & Install Four Lead Test Assemblies in Plant,Unit 2 Core During Cycle 10 Refueling Outage in Spring of 1999.Attendance List Encl ML20216H5261997-08-26026 August 1997 Summary of 970822 Meeting W/Util in Rockville,Md Re Followup to Series of Conference Calls on 970418,discussing Results of Recent Steam Generator Insps at Sequoyah Unit 1.List of Attendees,Handouts & Staff Questions Encl ML20140B4701997-06-0404 June 1997 Summary of 970530 Meeting W/Tva in Rockville,Md to Discuss Status of Thermo-Lag Fire Barrier Corrective Action Program at Plant & Schedule for Completion of Program.W/Attendance List & TVA Handout ML20140G5621997-05-0808 May 1997 Summary of 970227 Meeting W/Tva in Rockville,Md to Discuss Sequoyah Conversion to Framatome Cogema Fuel.List of Attendees Encl ML20134J7451996-11-0808 November 1996 Summary of 961104 Meeting W/Tva in Rockville,Md Re Status of Thermo-Lag Fire Barrier Upgrades at Plant.List of Attendees & Copies of Handouts Encl ML20129H5211996-10-29029 October 1996 Summary of Operating Reactors Events Meeting 96-13 on 961023,informing Senior Managers from Ofcs of Commission,Oe, NRR & Regional Ofcs of Selected Events That Occurred Since Last Briefing ML20217D1931994-03-0707 March 1994 Summary of Sequoyah Restart Panel 940303 Meeting in Region II Ofc Re Status of NRC & Licensee Activities for Restart of Unit 1.Meeting Minutes & Unit 1 Restart Action Plan Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217D2111993-06-16016 June 1993 Summary of Sequoyah Restart Panel 930614 Meeting in Region II Ofc Re Plant Restart & Listed Items.List of Attendees & Checklists Encl.Next Meeting Will Be Held on 930622 ML20127D1321993-01-12012 January 1993 Summary of Operating Reactors Events Meeting 93-01 on 930106 ML20058J8621990-11-27027 November 1990 Summary of 901005 Meeting W/Util in Rockville,Md Re Cable Conduit Testing Program.Viewgraphs & Attendee List Encl ML20058K0311990-11-23023 November 1990 Summary of Operating Reactors Events Meeting 90-28 on 901114 Re Reactor Scrams for Wk Ending 901111.Attendees Listed ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059N2091990-09-21021 September 1990 Summary of 900919 Operating Reactors Events Meeting 90-023 to Discuss Significant Elements ML20059D8121990-09-0505 September 1990 Summary of 900817 Meeting W/Util in Rockville,Md Re Schedules of Certain Mods Committed for Completion in Unit 2 Cycle 4 Refueling Outage.Engineeering for Unit 2 Will Be Completed Before Restart from Outage ML20056B4101990-08-20020 August 1990 Summary of 900723 Meeting W/Util in Rockville,Md Re Plant Cable/Conduit Testing Program for safety-related Cable.List of Attendees,Tva & NRR Handouts & Transcript of Meeting Encl ML20055E2081990-07-0505 July 1990 Summary of 900531 Meeting W/Tva in Rockville,Md Re Plant safety-related Cable Inside Containment.List of Attendees, & Handouts Presented at Meeting Encl ML20246J8031989-07-12012 July 1989 Summary of 890609 Meeting W/Util in Rockville,Md Re Dissolution of Engineering Assurance Organization.List of Meeting Attendees,Util Handout,Agenda & Transcript Encl ML20245F9761989-06-22022 June 1989 Summary of 890614 Meeting W/Util & Westinghouse in Rockville,Md Re Future Work for Facility Cycle 4 Refueling Outage ML20247M1001989-05-26026 May 1989 Summary of 890511 Meeting W/Util in Rockville,Md Re Performance of Best Estimate Calculations for App K Analyses.Proposed Plan for LOCA Analyses,Meeting Handouts & List of Attendees Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20155A8081988-09-29029 September 1988 Summary of 880915 Meeting W/Util in Rockville,Md Re Microbiological Influenced Corrosion Program at Plant.List of Attendees & Viewgraphs Encl ML20154M9231988-09-21021 September 1988 Summary of 880913 Meeting W/Util at Site Re Unit 2 Shutdown Margin & Unit 1 Restart Readiness,Per Insp Repts 50-327/88-35 & 50-328/88-35.List of Attendees & Related Info Encl ML20154H4341988-09-16016 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Conditions Adverse to Quality Program.List of Attendees Encl ML20206B1961988-07-29029 July 1988 Summary of ACRS Subcommittee for TVA Organizational Issues 880722 Meeting in Washington,Dc Re Generic Lessons Learned from NRC Review of Util Concerning Restart of Facility ML20153A8371988-07-0101 July 1988 Summary of 880622 Meeting W/Util in Rockville,Md Re TVA Commitments on Facility.List of Attendees & Util Handout Encl ML20150E2321988-06-21021 June 1988 Summary of 880613 Meeting W/Util to Discuss Restart of Facility in Light of Recent Scrams from Power.Transcript of Meeting Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20154A4061988-05-0404 May 1988 Summary of 880414 Meeting W/Util in Rockville,Md Re Differences Between Units 1 & 2 Nuclear Performance Plan. List of Attendees & Licensee Handout Encl ML20151D2701988-03-12012 March 1988 Summary of ACRS Subcommittee on TVA Organizational Issues Meeting on 880202-03 in Chattanooga,Tn Re Review of TVA Mgt Reorganization & Issues Re Restart of Unit 2 ML20149M6071988-02-22022 February 1988 Summary of 880211 Meeting W/Util Re Load Sequencing of Plant Diesel Generators.Attendance List & Handout Matl Used During Meeting Encl ML20148Q0801988-01-21021 January 1988 Summary of Operating Reactors Events Meeting 88-03 on 880119.List of Events & Summaries of Presented Events & 1988 Scrams Encl ML20195J5251988-01-21021 January 1988 Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant ML20195J6011987-12-0303 December 1987 Summary of ACRS Subcommittee TVA Organizational Issues 871004 Meeting W/Nrc & Util in Washington,Dc Re Actions Being Taken on Plant Restart Issues ML20236X4741987-12-0202 December 1987 Summary of 871124 Meeting W/Util in Bethesda,Md Re Results of Testing of Silicone Rubber Insulated Cables for Unit 2. Transcript of Meeting Encl ML20235B1271987-09-15015 September 1987 Summary of 870911 Meeting W/Tva Re NRC Staff Presentation to TVA Findings from Integrated Design Insp.List of Attendees & Meeting Transcription Encl ML20235B2261987-09-15015 September 1987 Summary of 870910 Meeting W/Util in Knoxville,Tn Re Status of Cable Test Program.List of Attendees & Transcript Encl ML20239A6691987-09-0404 September 1987 Summary of 870901 Meeting W/Util,Bechtel & S&W in Bethesda, MD Re Criteria for Pipe Supports.List of Attendees,Handouts & SQN-DC-V-24.2 Supports for Rigorously Analyzed Category I Piping Encl ML20237G7631987-08-26026 August 1987 Summary of 870819 & 20 Meetings W/Util at Facility Re Status of Technical Issues Requiring Resolution Prior to Restart. List of Attendees,Agenda & Handouts Encl ML20235X0921987-07-16016 July 1987 Summary of 870713 Meeting W/Util,Franklin Research Ctr, Sandia,S&W & NUS Corp in Bethesda,Md Re Cable Testing Program.Util Proposing Revised Cable Testing Program to Test 380 Cables.Attendees List & Transcript Encl ML20234B9831987-06-26026 June 1987 Summary of 870619 Meeting W/Util in Bethesda,Md Re Util Proposed Program for Regeneration of Nonretrievable Pipe Support Calculations & Verification of Technical Adequacy of Existing Calculations.Attendees List & Util Handout Encl ML20216D0121987-06-19019 June 1987 Summary of 870601 Meeting in Bethesda,Md to Discuss Special Employee Concern Program.Attendee List & Handouts Encl ML20214H8681987-05-18018 May 1987 Summary of 870326 Meeting W/Util Re Diesel Generator Sequencing Calculations.Util Response to Questions in Form of Rev 5 to Calculations,Engineering Change Notification, List of Attendees & Other Related Documents Encl ML20214L5911987-05-18018 May 1987 Summary of 870420 Meeting W/Tva in Chattanooga,Tn Re Review of Rev 4 to Vol 1 of TVA Nuclear Performance Plan & Status of Vol II of Plan.Agenda,Transcript of Meeting,List of Attendees & Viewgraphs Encl ML20214F4431987-05-0808 May 1987 Summary of 870410 Meeting W/Tva in Bethesda,Md Re Status of Plant Restart Issues.Meeting Transcript & Related Documentation Encl 1999-07-16
[Table view] |
Text
-
7 -
y,b* W.%'o,,
. , UNITED STATES 8'
- n NUCLEAR REGULATORY COMMISSION h WASHINGTON, D. C. 20555 k, v...../ September 29, 1988 Docket Nos. 50-327/328 LICENSEE: Tennessee Valley Authority FACILITIES: Sequoyah Nuclear Plants, Units 1 and 2
SUBJECT:
MINUTES OF THE SEPTEMBER 15, 1988 MEETING WITH THE TENNESSEE VALLEY AUTHORITY (TVA) ON ITS MICROBIOLOGICAL INFLUENCED CORPOS10N PROGRAM AT SEQUOYAH On Thursday, September 15, 1980, a meeting was held at the Office of Special Projects (0SP), NRC headquarters in Rockville, Maryland with the Tennessee Valley Authority (TVA). The treeting was held at the request of TVA to discuss its Microbiological Influenced Corrosion (MIC) Program for Sequoyah.
Enclosure 1 is the list of individuals attending the meeting. The following is a summary of the significant items discussed and the actions, if any, taken or proposed.
Sequoyah has experienced tilC in the butt welds of stainless (austenitic) steel piping in the essential raw cooling water (ERCW) system. The MIC attack was initiated at the inside surface of the welds and degradation occured in the form of voids that became larger, and deeper, and eventually developed into a throughwall leak. The leakage has been small and characterized as drips or noist ereas around the butt welds.
TVA developed a MIC program for Sequoyah based upon the data developed through inspection. The MIC program and the engineering evaluation which formed the basis for the program is described in TVA's letter dated January 20, 1987 This program was approved in the staff's Safety Evaluation Report (SER) forwarded by letter dated March 31, 1988.
Ry two letters, both dated April 4,10P8, and in a clarification letter dated May 4,1988, TVA submitted a request for relief frcm the requirements of IWA-5250(a)(2) during the performance of their MIC proaram. These requirecents were detemined to be impractical to perfom on Sequovah Units 1 and 2 during power operation of the plants. The staff granted the relief to IWA-5250(a)(2) and issued its SER in its letter dated May 11, 1988.
This meeting was requested by TVA to present the current status of its MIC progran at Sequoyah, The acenda for the meetinn is the first page of TVA's handout in the meeting (Enclosure 2). TVA stated that the purpose of the meeting was to present the following: 1) the curr';nt status of TVA's M!C progran at Sequoyah and the irplerertation of the additional itens requested in the staff's SER 2) TVA's evaluation process if the leakage criteria is exceeded,and3lTVA'scontingercyplanforinstallingastructuralsleevein pipira affected by M!C. TVA recuested that the staff, based on the reeting, concur in its implementatier of the additional items in the SE, its evaluatien
$ k Nb$;7 m y_
process if the MIC leakage criteria is exceeded and its contingency plan for installino a structural sleeve. The staff stated that it could not concur on the above based only nn the meeting. The staff stated that TVA l should submit the details of the MIC program at Sequoyah for the staff's review and approval.
TVA continued its presentation with a discussion of the background of the MIC program and the additional items listed in the HRC SER dated May 11, 1988.
These additional items were monthly visual inspection of identified leakers, an assessment of these leakers, verification that the leakage does not exceed the criteria of 0.5 gpm per weld and 2.0 gpn total, and acknowledgerent that the use of other than ASME Code repairs, such as the installation of a structural sleeve, requires prior approval by the staff.
TVA then presented the interim repair procedures, including the installation of a structural sleeve, at Sequoyah for MIC damaged welds in ERCW piping and the status of the biocide injection program at Sequoyah.
TVA concluded the meeting stating that it would submit the details of its request for staff approval of the MIC program at Sequoyah in a letter by October 31, 1988. It stated that it vinuld request the staff's approval on the MIC program at Sequoyah and the contingency plans to use structural sleeve for severely PIC damaged EpCW piping, b
Jack N. Donohew, Jr., ProNet Manager i TVA Projects Division l l Office of Special Projects
Enclosures:
- 1. Attendance List
- 2. TVA's Meeting Handout cc w/ enclosures:
See next page l
W_.
DISTRIBUTION FOR MEETING SIFMARY DATED: September 29, 1988 Facility: Sequoyah Nuclear Plant, Units 1 and 2*
Distribution a' liscliet File' L NRC PDR Local PDR Projects Reading OSP Reading J. Partlow S. Richardson S. Black B. D. Liaw F. McCoy ,
J. Donohew M. Simms J. Rutberg K. Jenison D. Smith ACRS (10) '
GPA/PA GPA/CA iM. Callahan) (5)
F. Miraglia E. Jordan ;
B. Grimes i
P. Gwynn J. Scarboreugh !
G. Marcus l
T. Elsasser C. Ader
- cc: Licensea/Apolicant & Service List ,
l i
1 l
DISTRIBlJTION FOR HEETING SIWFARY DATED: September 29, 1988 Facility: Sequoyah Nuclear Plant, Units 1 and 2*
Distribution
- 7 Docket File NRC PDR Local POR Projects Reading OSP Reading J. Partlow S. Richardson S. Black B. D. Liaw F. McCoy -
J. Donohew M. Sims J. Rutberg ,
K. Jenison l
- 0. Smith ACRS (10)
GPA/PA GPA/CA (M. Callahan) (5) )
F. Miraglia l E. Jordan !
B. Grimes 1
P. Gwynn J. Scarborough i
G. Marcus T. Elsasser C. Ader
! l
- cc: Licensee / Applicant & Service List 1 1
l l
l l
l l
t Sequoyah Nuclear Plant cc: Regional Administrator, Region II General Counsel U.S. Nuclear Regulatory Comissien Tennessee Valley Authority 400 West Sumit Hill Drive 101 Marietta Street, N.W.
E11 B33 Atlanta, Georgia 30323 .
Knoxville, Tennessee 37902 Resident Inspec*or/Sequoyah NP Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Comission ;
Tennessee Valley Authority 2600 Igou Ferry Road j
SN 157B Ltokout Place Soddy Daisy Tennessee 37379
- Chattanooga, Tennessee 37402-2801 !
Fr. John T. LaPoint Mr. Michael H. Mobley, Director ,
Tennessee Valley Authority Division of Radiological Health
) T.E.R.R.A. Building, 6th Floor j Sequoyah Nuclear Plant ;
P.O. Box P000 150 9th Avenue North I Soddy Daisy, Tennessee 37379 Nashville, Tennessee 37219-5A04 Mr. M. Ray Dr. Henry Myers Science Advisor l Tennessee Valley Authority Comittee on Interior !
Sequoyah Nuclear Plant and Insular Affairs P.O. Box 2000 U.S. House of Representatives Washinqton, D.C. 20515
] Soddy Daisy, Tennessee 37379 ,
! Mr. D. L. Williams Tennessee Valley Autherity
( Tennessee Valley Authority Rockville Office ,
400 West Sumit Hill Drive 11921 Rockville Pike W10 BSS Suite 402 i Knoxville, Tennessee 37902 Rockville, Maryland 20852 j County Judge Mr. S. A. White ;
Hamilton County Courthouse Senior Vice President Nuclear Power .
j Chattanooga, Tennessee 37402 Tennessee Valley Authority ,
- 6N 38A Lookout Place ;
j Chattanooga, Tennessee 37402-2801 ,
1 I s 1
I i
a l 2
i
- ENCLOSURE 1 LIST OF ATTENDEES FOR SEPTEMPER 15, 1988 MEETING ON TVA'S MIC PROGRAM Name Affiliation J. Donohew NRC/OSP D. Smith NRC/OSP R. Mays TVA A. Poole TVA D. Goodin TVA C. Brimer TVA F. Hartwig TVA 1
I l
\
l 1
TVA - Tennessee Valley Authority NRC/OSP - Nuclear Pequiatory Comissinn/ Office of Special Pro 4ects i
i I
1 1
I l
1
ENCLOSURE 2 AGENDA G00 DIN I, INTRODUCTION .
G00 DIN II, FLGP0SE G00 DIN l III. OBJECIIVES i
- P0 OLE IV. BACKGROUND BRIMER
$ V. DISCUSSION Of ADDIIIONAL IIEMS LISI IN NR SAFEIY EVALUAIION l '
F0 OLE REVIEW Of $@! INIERIM REPAIR PROCEDLIES VI l
l IORMICD.W.GEDWilDSINERCW?!?ING i
h G00 DIN 2
VII. CURG. T SIAIUS OF BIOCIDE INJECIION PR i
i GC0 DIN VIII 50?.GY i
i XI. DISCUSSION f
l 1
PURPOSE
. 10 PRESBT THE CURRDT SIAKS Of WA'S ?!IC PROGRA)! AND THE D!PLDIDTATION Of ADDIIIONAL IID!S REQUESIED IN I3E )!AY 1988 SER
, I0 PRESBT IVA'S EVALUAIION ?R00ESS IF [f)D.GE CRIIERIA IS EXCEEDED
, 10 PRESBT IVA'S Cf.TINGENCY PU.N FOR INSIAllING A SIRUCIERAL SLEEVE mi ii n um i
OBJECIIVES i , OBIAIN h30 00NCERENCE WII3 IVA'S DIP!DIENIAIION Of THE i
! ADDIIIONAL IID!S ,
j l
. OBIAINW U
. C CONCE. CE WIIB IVA'S EVALUAIION ?R0 CESS I? Li.E.!GE
)
- CRIIERIAISENCEEDED i !
i l
, OBIAIN NR0 CONCERENCE WII3 IVA'S CONIINGF.NCY ?!AN I a
ASTRUCIEALSLEEVE !
1 ;
) i i
i !
l I
1 4
l 1
i
t p
3ACKGROUND DAIE l IIEM DECEM3ER15,1987 l
. IVA N 20 FIEIING l
JN)2Y4,1933 l
.T SIINGE0USE13DE0ME!IING t
JNARY20,1988
. IR .
10 20 ON SQN MIC PROGRAM
,20SAFEIYEVA!UAIION MARCH 31,1988 f f
APRIL 4,1938 l
.IVALIIIERTO20FORRELIEFREQUESII0 ASMI SECIION XI FOR EiG ?IPING
~
l
. IVA !EIIER I0 20 0N CulIFICATIONS fly 6,1988 l OfSQNMIO?ROGLO!
,NRCACCEPI!3CEOfRE!IEFREQUESI yli11,1983
$UEJECII0INCLUSIONOFADDIIIONALIIEMS
u i
F ADDIIIONAL IIDlS FROM NRC SER .
l NRC HAS ACCE?IED H E MIC PROGRAM WIE HE F0LLOWING ;
- 1. P.0NIHLY VISUAL INS?ECIION Of IDENIIFIED LEAKERS
- 2. AN ASSESSMENI 0F LEAKERS I0 ENSEE THAT IHE SIRUCER ISNOTVIOLAED?RIOR10SCHIDUlfDRE? AIR :
- 3. VERIFICAIION HAT IlilEAKAGE DOES NOT FlCEED 0.5 G?M IN WELD OR 2.0 G?M CBilAIIVE IN ALL WELDS :
- 4. BSIALI.AIION Of A $3CCIURAL SLEEVE REQUIRES PRIOR NRCj OfMEE00
, l l
l \
i l
l l
l i
u q
r SER REQUIRDIENT 7
THE FREQUi30Y Of DIRECT VISUAL INSPECIION Of W ISINCREASED10>!0NI!!Y. '
f IVA I)!PLD!!3IAIION PU3
. PERf0R)! MONIHLY '#l.KD0'u l I
. VISUAL!Y ASSESS LDIME I
I IHIS PROGR.01 M C0. PLIES 'a'II3 SER .
i 4
SERRIQUIRBf3I i
i AI IHE S!3E ID!E LEAD.GE IS DEIECIED, !3 ASSESSSIDI IS >!GE I0 t i
ENSEE IHE ACCE?I!3G GIIBION IS NOT EGEDED BIOR 10 IE l SGEDULED OUIAGE OR RE? AIR. !
I I
IVA D!?!DlDIAIION PI!3 l EE SEQUOY!3 INS?!CIION B0CEDGE INCLUDES GIIERIA FOR I3Il ASSESS:UI UDB II-109. l
. A liRR IS ID5Ili!ED SY EG00. .
t
. LGIOGF).!!Y Of I!E ELD IS FBf0D!ED.
l l
. CCfiLAIIE DEFECI !BGIS IS C0)1?ARED 10 IE LDlII LOAD ACGPI!3CE l 1
GIIBIA. l
. EROUG30UI IE !3A! ISIS, 3/S-!NG ?)3 GIN IS >LA.!NIAINED.
u RES?0NSE I0 MONIIORING SIRUCER.i.l. INIEGRIII CNIII. CEANGIOUI C.G OCCUR
.a.r::1.i.sn..t .m. I :.:.t i.;
a::u
. . , . . . . , 3. . . . .. ..
, : n ..s,ulb .... .. c:.n, ....ua . . .a. ...
- e.ns.:9, ,v.iAnt..i :.e. : vaC,,a..., . , ..e !.u:
- 0n..iD, 15,..ye. .. ; 7;
. u.3,.1.,.
- . . ,..,7c.D a, .,,0,iu t: 3. .,._n e:.::. C .-..es:.
.... r.a-e::r.
.t. . :.nJ .
,y us.
. 1:. ..f:.L10.0,CC,1y[O,!'.
'. . . 4 ult.7,7.;.u..I.)rfit.R0.0N.,.
- e. I. .
, . :. .7.\.. 2. u.,lu,x.A .,,3..,i 3:. 3:.V7..D :
.b: a..,.d1DB. .. ,,, Oh. ,0IT.,.u bu
\'0NII0 RING 0? 1.E.EING AND NONIEEISG Wi!.DS,
, .c:.
. !..s.aue. ...i I,!.. 0r,.D
. n t. u. !... !A us h. ,,x..D :.. 0.5 , 2 d..,..
. 6. ....,
a:.1. ea
....rg...,..
u s e -<r n. u::.u ...... .ci.u.. o.. r.,..C,.. a 3:1.e..: ,,;. ..d.. ,.0 e,.,O, .. s..y,..n .i. :.s
- t r.u "A":!f.77),B.0:"0:.C;;3**:B, I
l
1 I
s
$!R RE0CIRE'i!NI l
VERIFICATION BAI IHE laXAGE D0!$ NOT EEEED 0,5 G?M IN A '
i .
4 OR 2.0 G?M IN A!!'i!LDS n.i. i.v:r.:vn
. . u.a...c.i.4 .: g.
.g '
i .
- ,CC....s6.,' CR, I*t'u'Ie'. O'r I'n" V. 0T. in"I
. b...: Ti... taV.3.;l... u .o in e. ut..
i 4
4
- ,.A.Mt A
I...n,y A.)
/
4 1,
. I.: ... Jc I..R,1A ina u. c,h. unC..DED:
l i
IEE ?t_1.'il RES?0NSE 'illt !! DEIERMINID if I3E CAQR I
i
- .......N.,30R..l..NI, in du:. e u: Jill..s.0.l.I.D a.ii:t i
,i.
0?!D.3ILIII 'illt !! 3ASED ON il0'i I0 COMIONI.NIS AND
- l. ..L,.s u3. in .,;..h.,,7
.. sa.t a
.m c.,n.c.Qr.e.c.'i (a: > 1.0)
' ua...a.
i<... .e.:.3 !
I d l 1 1 in. ::
., , .7i , alt.t :i. t u'
.i . . . .
.: O.. r:.t1....
n a .... .
- .e. , g. a n :s... en .D ,
)
) .. i
, ....................,c.0...3
' ..:::.u:3.e..: .::.: :::L . . i 1
l
- .: w. ..' n : a:i,. ..v.
.... .u. ... ..:..a. ..:.;..
.s,:. . = .c.. n swiCe......t.::. e.4e.
i 4
- 07. 7 U.. 7 I.}. f.'.g 1..U.) II1*g*Y.7 !177
,i s i
4 1
I..
m RES?0NSE 10 !!AKAGE EXCIEDING GII!i!A ACCi?IABILIIY2 ASIS
- 1. RADI0GRA?EY Of A??iOXI)LAI!!Y 35 'iiLDS .GD DESiiCCIIVE EXENAIION Of A??iOXIMAI!!I 60 INDICAIIONS IN 12 ELDS EAE ONLY IDB'IIFIED
?IIIING DAMAGE. N0 EVIDENCE Of GAGING .5CE.0 ISMS (SCC 02 FAIIGE) '/AS F0LE. .U.?ID GROSS FAI!GE OF IEE 'dLD J0BT 'ilLL N0I OCCG !.EER IHISE CliCESI. MIS.
- 2. El Ai?!CIED ELDS ARE IN MAIN HEAD!iS FOR EIG 0.5 I0 2 G!M
!!!D.GI IS A MIN 0R ?!0'4 RED (!CIION, IVEN IN A 'iOESI-CASE ACCIDENI CONFIGGAI!ON. -
- 3. RA'i 'iA!!i INVBTORY IS INTINIII (0XG-IE10CG3 i!Vil 'JAIli i t
503 0). l 1
l
U q:R
..a. e0in'ingy;Ni L.
a
...,.(,,,
.::av .% t I\....
bla 7.13.IO\..i.Or1.:<..
1 S..d.C.;.,
. :.:. : at. ,; qI...;<.. . . L,I,sr. .AgcR \..,p; .
d .
Vi~
. .. . "..n. D. .
1\ ,n. ,1.'J
, , 7. . , , . s. . . . . . s. . . , ,.
- ..'. .iit.a .U.i :.e.i
-t .i n.3.
.. y$ . 5ua 3..,0?.O, A ,:,n.D: 31r'i:D .- 3:.n h.1.3 v c*. Cni. uk. - s u- ' :u'a :.au' 1
1
.m.t ICn'II0'i.
,t.c,.,r. .,'O u3 n ,3:.: ..,,,.....,3,,13 .umb
- < 1,:c,.n..D.iC1. .u . n
. 10 ..2 b...D : ,e.,.,i
- ,a.
,. . ,,.. ,s..
3.,t. \.
. ,d.1 ..::..h;L.IL
. . . . . . . s,a CV,,.il 7 :..h... 3 L : '.te.1 it..Q
. \. 0.112. .. :3.43 C a:nt:.41 1
\
. .., ... 3.,,g.. ... ... r,.C. 0.,
. .i!!a r. ::..: .u.u!. 1:'.a 5: *.L,
" 11N
. , . . . . . . . q. ..
. .i ., 3 r o. n1
..,t.
. , . i ... A \.........i
... s.. ..
. .\ ,7. .,. .c.. . , .y... g.
.il.,s.. ..,..
i ,, ...
l I
1 l
l l
l l
T U
e
e ei?l'C {s
,. -s.x vece $
~
.itt a .P60 0 m a s
C. .I u 4
I
" - - _ _ _ _ , . L----- '// .
g
. 3 V .- is R :%I ll ll / vh
, 5 gt ii ...
f a , ,,
/
g _ _
- w!
l i
_/ _ _ _ _ _ : _:l::_______q\.'./,; # g.
_._ N. _
'2 7 s! (
A llill / l@: .
, - w _ _ _ _ _ , ;_,
g- gg
, g l t R
ll,'ll s sE I
- \:
.: es 2-a t h;. ll' ll ij l -
-- - u .u--- --.
0 c =L ,
1 1 . ,
l l
l U
l M l 3 l
M i
$ < s I M / '
l l
\, *
'\ .
T l -
s' D i s j'a gg i N, ,
e i
l 4 4
- v. ,
el ~, w .sas
'cu N
1 d R l
1 1 .
. REVI!VOi$1.EEVE'i!IHREGARDIO ;
- I Pl?ING.23A!YSIS
. 1 4
i- :
1 )
! i i ;
c:t.nIs. 3.':*h*n.:
- a. . c. :30r.:.nn..,:. .!.\;D a :.0<- '4:.t_0 IN. (?;CiM.N3' s ;.' .(.(.:.s':
, , . s . .
1 J
- 10DT.GY INTEGRIIY, .
y '
I l
i a
, ' JIG 3I 0F $!!!VE 210VIDES !.E55 IHAN A 5-iERCDT INCREASE IN IEr b SINGLE SPAN 'dIGBI Of ?I?ING. t l \
l . $EI53IC !3ALYSIS 0? ?!?!NG SYSIE3 IS NOT D!?ACIED ?ROVIDED IE .
I f
4 i I:: 'iD.9:10 (.IJEVES .El ?"..;. $?.!.'i I.S i.Il. t.7. D.
J . ....h.. A...CEh,d.
1::. du:. ! u. i,s u.D c..,3.3 ::.6. .NL!.ED.D I :. IN in:. . ?!?!NG l
\ .
4 -
- i--
r3e,.l......
1313 ... . ... Is .u a dined rd31:1..ut0h AC10- : s (d!:) (9.1). l
! t I
T
. SI.EEVE EAS SICIION X00Ul?S 1.GGER N I?.!.1 Oi!GI. AL ?I?! A.\T MINl
{
h,All....U.....,,.....,3Va!GB.A.....!. :!!:..
. :!'. :. 3 13 :..k a 1 - !
l
- .:..r.*;....
- y; :'.!. :....i
.::vg s.e.:; w7. .;. i gg: .::;.'. tit.
. . .w, . . . t."I.t..:.;,.
i ,
i f t
......s-. . .....I f ...) .k ,..t ............i. .......... !
e
.i l
! . i i :
3 I t
I l
(
STRUCIUPAL INTEGRIIY/ SLEEVE ACCEFIABILIIY 4
. I8ESLEEVEWASDESIGNED10MEETREQUIREMENISOfUSASB31.1AND
! INSIAllAIIONANDIESTINGWIllBEPERiONDINACCORDEEWIIH r
SECTIONXI. j l
. BE MIC SLEEVE IS A TEFORARY INTERIM RE? AIR AND WIll BE l l SINCE MIO HAS 3EB $20KN 10 BE REPU.CED AI IHE NEXI OUIAGE i
ALONG-IERMPR03l0ANDSINCEPERIODI0MICINS?ECIIONSWIll j j ;
k CONTINUE TO BE MADE MONI3!Y, N0 PROBlDS RELUED I0 MIC DM.GE )
1 I Of EE SLEEVE ARE NICIPAIED. l l !
i i
i ;
! I
! l 4
V {
l
- l i
4
7 i
p .. p . . . . . . . . .. . .. .
.g , \!
b .55.>.. A' s. '. )6 ap w .
3} ., .
- 4. J . . g,21 .i .,
. .. . - .... g.,.... . . . . . *
. 1. w%..I.i.l. ...4, ,[ 6 e
.i .a .A 6. . 4 *. i4....f....
, .t .I .
. .l.l I.1.
s
. v I w% 1.=.
4 k.M */e..
. .i . .
....Iq, ; . . . . .'r. .e.J. .i,, . . . . . ..
s ..
g,..
j .g .P '. g g, ..*9
.. ..,f....u
. .4 .g
, i ...e w
.q .
l 4
- 2. INTEGED I0 I'GI3II ADDIIIONA!.1IC AI?!.C.s !.\~0 CONTR01. G10'iT3
- 0. , :. I...ui.
.. . . , Lr e. y l .
l 4
I
. .w. ./.n.. A'A .:rvi.n. l. !
I
- 1. . .i .s,; ... ,. . . i. . .s . ....a v .. t. D . . 1. . .s, ...'...i_-
v........., .
, , .,.,,. .. .. i
%s..i . . ..o. .. .. .,. ,,.. .., . . ..
s...s......... .
. ..s,., . . .s .,..- .s . . : s... . .. .. .. ...: s,
.s.
i i
i I
.,.,. l
- . . ...... . . s, i ..,.,..s. ..... .. ..,.
1
... ,.. .. . .. . . .,. s .. ... .,. .,. ., .... s. .. .. ,.. .. .. .. . . s,.
.e l
l .,
. . . . ,4 .s...s...._....,..
4 E 1
l r
i SD?.GY I f
i
. IVA EAS FRISDIED BE ADDIIIONAL ITES IEAT EAVI 3EIN l i
INCORi0D.HD INTO THE MIC ?!0GD3 IN !!$iONSE I0 IEE I
E!Y 11,1953 i.\~01GCE 31,1988 Nic Siis. .
- MONI3LY VISUA!. INS!!CIIONS l
- ASSISSMBT Of SIRUCIURAL INiiGRIIY 10 USEE ACCIII.GCE .
i GIIBION IS NOT ECEIDED PRIOR 10 AN OUIAGE OR E? AIR l l
- lIAD.GE DOES NOT ilCIID 0.5 Gi3 in WILD OR 2 GiM I0IAL i I
I
!Dl!G'
. IVA HAS iRISDIED IIS EVA!UAIION iiOCESS I? LUI!GI GIERIA :
i l
ISI5(If.DE0. l i
. IVA EAS iRISBlID IIS CONIINGUCI ILG IOR INSIA!J.5G A l J
SIEUCRillS!!!VE. I i
i i 2
]
I j process if the MIC leakage criteria is exceeded and its contingency l
- plan for installing a structural sleeve. The staff stated that it could not l concur on the above based only on the meeting. The staff stated that TVA
' should submit the details of the MIC program at Sequoyah for the staff's review ,
and approval.
4 '
TVA continued its presentation whh a discussion of the background of the MIC j
' program and the additional items listed in the NRC SER dated May 11, 1988, t These additional items were monthly visual Inspection of identified leakers, an {
assessrrent of these leakers, vertf tcation that the leakage does not exceed the !
1 criteria of 0.5 gpm per weld and 2.0 gpm total, and acknowledgement that the ,
i use of other than ASME Code repairs such as the installation of a structural ;
j sleeve, requires prior approval by the staff. ;
} TVA then presented the interim repair procedures, including the installation !
i of a structural sleeve, at Segunyah for MIC damaged welds in ERCW piping and !
- the status of the biocide injection progran at Sequoyah, j 1
I j TVA concluded the r'eeting statirg that it would submit the details of its 1
reauest for staff approval of the MIC program at Sequoyah in a letter by i j October 31, 19R8. It stated that it would request the staff's approval on the i i MIC progran at Sequoyah and the contingency plans to use structural sleeve for i i severely M!C damaged ERCW piping.
? i 1
1 Jac N. Donohe Jr., Project Manager
! ' TVA Projects Division .
Office of Special Projects [
l
Enclosures:
i
- 1. Attendance list !
?. TVA's Meeting Handout !
l Distribution j cc w/ enclosures: Docket File NRC POR E See next page Local PDR Those on attached list !
i 1
- i l I l !
1 J
6 _ .
lOFC T ,:054 :057iTIAFy TVA:A /F :
l .... 3.g}{...:...
i
- NAME ims
- J s :05mith / SBla : : : :
1.....:............:.............:......g:t j DATE 200/6 /88 :09/2E'88 :09fp195 /
- 09/ vyss : : : l OFFICIAL RECORD COPY
_