Informs That Voltage Indicator & Selector Switch Now Installed in Unit,Resolving SER Confirmatory Item 24 Re Testing of Interlock P-24
ML20155A677
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/01/1988
From: Bailey J
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1457, NUDOCS 8806100188
Download: ML20155A677 (1)


Text

.

Georgia Powtr Compiny Post Office Box 282 Waynssbora Gtorgia 30830 Telephone 404 554-99S1 404 724-8114

..her pany ervices,Inc.

B<rmingham, Alabama 35202 Telephone 205 870-6011 y

Q 9e' d June 1, 1988 U. S. Nuclear Regulatory Comission ATTN: Document Control Desk File:

X7BC35 Washington, D. C.

20555 Log: GN-1457 PLANT V0GTLE - UNIT 2 NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 SER CONFIRMATORY ITEM 24: TESTING 0F P-4 INTERLOCK Gentlemen:

GPC letter GN-1145, dated October 31, 1986, indicated that a permanently installed voltage indicator and selector switch had been installed i.

in Unit 1 to facilitate testing of the P-4 interlock.

This resolved confirmatory item 24 for Unit 1 in SSER 4.

GPC has now installed a similar switch and voltage indicator in Unit 2.

The description in FSAR paragraph 7.2.2.2.3 applies to Unit 2, as well as Unit 1.

's should allow the resolution of confirmatory item 24 7

for Unit 2 also.

If your staff requires any additional information, please do not hesitate to contact me.

Sincercly,

[t.

0

[

0 J. A. Bailey Project Licensing Manager JAB /wkl xc:

NRC Regional Administrator NRC Resident Inspector P. D. Rice L. T. Gucwa R. A. Thomas B. W. Churchill, Esquire 0k J. B. hg kins (2) 0 G. Bockhold, Jr.

R. J. Goddard, Esquire t{ 0 R. W. McManus Vogtle Project File