ML20155A225

From kanterella
Jump to navigation Jump to search
Mod 37,providing Incremental Funding,To Technical Assistance in Support of NRC Reactor Licensing Actions - Program II
ML20155A225
Person / Time
Issue date: 09/28/1988
From: Edgeworth P
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), SCIENCE & ENGINEERING ASSOCIATES, INC.
To:
References
CON-FIN-B-8011, CON-FIN-D-2103, CON-NRC-03-82-096, CON-NRC-3-82-96 NUDOCS 8810050248
Download: ML20155A225 (2)


Text

__ _ ____

4. CONTRACT ID CODE PAGE OF PAGES Ah4ENDMENT CF SOLICITATION / MODIFICATION OF CONTRACT y

g3

2. AMENOMENT/MootF #CA160N f40,
3. LP P LCitVE DAT E
4. REQU154 T 40Ns9URCHASE M EQ. NO.
6. PAOJECi too. (f/ appJecaste) r 37.

9/27/88 flRR-82-096 dtd 3/11/88, 12/ 9/87 and 11/23/87 F. AOM tN e 5 T E R EO esv git.ener,h.. is, 4)

CODC

(,. e55uEO uv t

U.S. fluclear Regulatory Cortunission Division of Contract.il Property Management Washington D.C.

20555 s

a. N AML AND ADONL5h Of Cord f H AC10H INo street. coca f y. 8 fete ad 2M Code /

g 9A. AMENOMLf 4 T Of 50LICt T AtlON NO.

Science Applications International Corporation io.OAiEO rsEr sruf e ss 1710 Goodridge Drive t

McLeans VA 22102 80A. MOOtt IC A fluid OF CON 1 R AC T/OH DEH No.

X f(RC-03-82-096 tote. OA1 LO ($Of lt ur JJJ 11/23/81 CODE lF ACILITY CODE 11 THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICIT ATIONS is es ten +d.

is not eo The atme numterw soucitation is amended as set iorth in item 14. The hour eM date specif md for receipt of Of fers i

sensd.

Of fers must ack noni.dae receipt of this amendment prior to the hour a4 date specified in the solicitation or as amere$ed, by one ol copies of th. amerdment; (b) By annowl.dains receipt of th;s amendment on each copy of the of f er i

sutimitted; or (c) av separete letter or telegram which inc1Wes a reference to the sol. citation and ameMment numtes. FAI (a) By completing Items 8 and 15.aM esturning MENT 10 BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR letter.ptcwdM each teleram or letter mdes reference to the soHeitat.on and this amerd

~(

J2,B&R flo. 86-10 Al+ROPHI ATION DATA (IbIdawed) Jncrease:

D 2,000. 00 ACCOut4 TING AN t14 01 FIf( fio. 0-3

,000.00 MPLtla. RWO11

..ncenne.

Rio No. 20-19-03-01

13. THis ITEM APPLIES ONLY TO MODIFICATIONS OF CONTR ACTS /ORDE RS.

IT MODIFIES THE CONTRACT!OnOEP NO. AS DESCn10ED IN IT EM 14.

Y RYCT ORDER t. 09 0,

D. THE ABOVE N.UMBE RED CONT R ACT/ ORDER IS MOOlF#CD TO REFLECT THE AOuiN apprepteahoe d ie. ett.J 5ET F ORTH 6P4 4 T LM I4. PURSUANT TO T H E AUT HO RIT V OF F A R al.103(t!).

I C. T His SUNLL MLr4T AL AGHEL MiteT, as t.t4T EseLO IN T o evHsu AN T TO AU1 HO M6i V OF i

o O r.o <sra..tr s,pa.1 m aa,<a s..

.a..Haar Contractor h is not, is required to sign this docurnent and return copics to the issuing of fice, E. IMPORT ANT:

m u C R.,,e N O,.. E. _ N,, ~ O,,

C.,,e N,or,.,...., oC,.,..., -..,,,,. ~

..,m...

.e,e,...,

i Therefore the subject i

The purpose of this modification is to provide incremental funding.

s contract is revised as follows:

Article 3.1, Estimatec Cost and Award Fee, Paragraph 4 of Section 3.0 is hereby deleted 1.

in its entirety and the following revised Paragraph 4 is substituted in lieu thereof:

8810050240 00092a L

PDR C ONTR NRC-03-02-096 puu l

ge,gs,,,,..ea.e.... aii.,'..: au..u m..s.. o,...<um..i.......<o. ne.n SA., i O A, a............an.w...,n.as

..a4..u aa ia r.,u een e 16 A. N AM E Atto ilT LE OF CONT R AC16HG Of F 4CER (rype *F an.f/.

. LSA. N AMC AND 141Lt. Of 56GNE R (Type er prt.t/

isC.DATLSGNED 16 5. V TI t p51 AI Lh0F A IPIC A

/

46C.OATC SIGNED ;

Ib3. CON T R ACIOR/VF # E ROH

m. y.,e. m. w. u,~ O,me o.

SAP /W BY

. S

[

i

......-.,r~,....,

STANDARDFORMh0

v. le 43)

.30-805. 4 Prescetbed t>y G5A -

.s NSN 754044152 4070 0

' *

  • v
  • c!.* L*." * * * '

6CEV40V5 EOtTiON UNVSAOLE t

J j

m__.

Modification No. 37 Contract No. NRC-03-82-096 Page 2 4.

Total funds currently available for payment and allotted to this contract are $7,881,501.08, of which $7,237,472. 72 represents reimbursble costs and of which $644,028.36 represents available award fee through the seventeenth evaluation period.

For further provisions of funding, see General Provisions No. 5.2 entitled, "Limitation of Funds" and Article 5.11 entitled, "Incremental Funding."

II.

The amount of $36,000.00 in incremental funding is obilgated under FIN t

No. B-8011 ($22,000.00) and D-2103 ($14,000.00).

!!!. The amount of $22,000.00 (FIN No. B-80ll) is provided for work per-formed on Task Order No. 21, Mod. No. 3. "SPDS Reviews." The amount of

$22,000.00 represents $20,000.00 for reimbursable costs and $2,000.00 for award fee.

The amount of $14,000.00 (FIN No. 0-2103) is provided for work performed under Tast Order No. 25, Mod No. 3 "Evaluation of Seouoyah Electrical / Instrumentation Concerns." The amount of

$14,000.00 represents $12,728.00 for reimbursable costs and $1,272.00 for award fee.

IV.

Paragraph 6 of Article 3.1 is deleted in its entirety and the following paragraph is substituted in itsu thereof:

6.

The total award fee currently available; the award fee earneo thus far; award fee not earned; and the evaluation periods applicable thereto are as follows:

Available Award Fee Award Fee Eval ation Period Award Fee Earned Not Earned 1) 11/23/81-2/28/82 5 6,643.00

$ 6,640.00 3.00 2) 3/1/82-5/31/82 6,643.00 6,574.00 69.00 3) 6/1/82-8/31/82 19,931.00 19,774.00 157.00 4) 9/1/82-11/30/82 33,217.00 32,885.00 332.00 5) 12/1/82-5/31/83 66,433.00 60,454.03 5,978.97 6) 6/1/83-11/30/83 66,433.00 66,379.85 53.15 7) 12/1/83-5/31/84 66,433.00 63,715.89 2,717.11 8) 6/1/84-8/31/84 33,217.00 32,552.66 664.34 9) 9/1/84-11/22/84 33,217.00 32,300.21 916,79 10) 11/23/84-2/28/85 37,189.00 36,839.42 349.58

[i 11) 3/1/85-5/31/85 37,189.00 36,746.45 442.55 l,

12) 6/1/S5-II/30/85 74,378.00 71,179.75 3,198.25 i

13) 12/1/85-5/31/86 74,378.00 72,280.54 2,097.46 14) 6/1/86-8/31/86 37,189.00 (l

15) 9/1/86-11/22/86 37,189.00

~

16) 11/23/86-4/14/87 49,492.10 17) 4/15/87-TB0

  • 67,063.80 l

NRC-03-82-096 Modification No. 37 Page 3

  • Includes an increase of $3,272.00 in new funds ($2,000.00 for Task Order No. 21, Mod. No. 3 and $1,272.00 for Task Order No. 25, Mod. No. 3)), $11,545.00 ($2,500.00 for Task Order No. 19, Modt-fication No. 2; $2,500.00 for Task Order No. 21, Modification No.

1; $4,000.00 for Task Order No. 21, Modification No. 2; and

$2,545.00 for Task Order No. 25, Modification No. 2).

The

$42,149.34 increase in available award fee and the $2,097.46 residual fee from period thirteen set forth under Modification No.

32 is also included in the available award fee for period no, seventeen as is the $8,000.00 increase in award fee set forth in Modification No. 33."

o in summary, this modification accomplishes the following:

a.

Obligates funding in the amount of $36,000.

b.

Total funds currently available for payment and allotted to the contract are increased by $36,000.00 from $7,845,501.08 to

$7,881,501.08 of which $7,237,472.72 represents reimbursable costs and $644,028.36 represents available award fee through th; seven-1 teenth evaluation period.

I c.

Reimbursable cost is increased by $32,728.00 from $7,204,744.72 to

$7,237,472.72 and available award fee is increased by $3,272.00 from $640,756.36 to $644,028.36.

d.

Award fee available for the seventeenth evaluation period is increased by $3,272.00 from $63,791.80 to $67,063.80.

[

This does not impact the ceiling amount of the contract which remains unchanged at $8,220,339.13.

l i

l 4

4 i

i e

!