ML20154S554
Jump to navigation
Jump to search
| ML20154S554 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 11/30/1985 |
| From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | |
| Shared Package | |
| ML20154S538 | List: |
| References | |
| NUDOCS 8604010318 | |
| Download: ML20154S554 (1) | |
Text
g NRC Operating Status Report Haddam Neck
- 1. Docket: 50-213
- 2. Report:ng Period: !!/85 Cutage + On-line Hours: 58.7 + 661.3 = 720.0
- 3. Utility
Contact:
J.P. Drago (203) 267-2556 est 452
- 4. Licensed Thereal Power (MWt!: 1825
- 5. Naseplate Pating (Gross t"te): 667 x 0.9 = 600.3
- 6. Design Electrical Rating (Net MWe): 582
- 7. Manisua Lependable Capacity (Bross MWe): 595.8
- 8. Marisue Dependable Capar:ty (Net MWe): 569
- 9. If changes occur abcve since last repcrt, reasons are: N:hE
- 10. Power level to which restricted, if aay (het MWe): N/A II. Reasons for restriction, if anys N/A MCNTH YEAR-TO-IATE CUMULATIVE
- 12. Repurt period hours:
720.0 8,016.0 157,056.0
- 13. Hours reactor crit: cal:
696.6 7,938.4 135,655.4
- 14. Reatter reserve shutdoen nours:
0.0 21.0 1,285.0
- 15. Pours generator on-line:
661.3 7,853.3 130,057.8
- 16. Unit reserve shutdown hours:
0.0 24.3 398.0
- 17. Gross thermal energy Generated (MWtH):
962,315.0 13,694,026.0 225,871,209.0 8
- 19. Gross electrical energy generated (MWeH):
310,222.0 4,464,170.0 74,123,318.0 8
- 19. Net electrical energy generated (MWeH):
292,169.4 4,250,953.3 70,512,018.4 8
- 20. Unit service f actor:
91.8 93.0 82.8
- 21. Unit availability factor:
91.8 98.5 83.1
- 22. Unit capacity factor us:ng MDC net:
71.3 93.2 82.5
- 23. Unit capac:ty f actor using CER net:
69.7 91.1 77.2
- 24. Unit forced cutace rate:
8.2 2.0 5.7
- 25. Forced outage hours:
58.7 162.7 7,868.8
- 26. Shutdowns s:heduled over next 6 scnths (type,date, duration): REFUEllN6, 1/4/86, 11 WEEK DIMATION.
- 27. H currently shutdcas, estisated startup date: N/A 8604010318 860115 PDR ADOCK 05000213 R
PDR I Cuaulative values from the first criticality (07/24/67). (The remaining cusalative values are froe the first date r.f cessercial operatio, 01/01/68).