  • c

+ *

/

OPSRATING DATA REPORT DOCKET No 50-341 UNIT FERMI-2 DATE 01-07-86 COMPLETED BY L.P. Pregni TELEPHONE (313) 586- 5313 OPERATING STATUS

1. REPORTING FERIOD December GROS 5 HOURS IN REPORTING PERIOD N/A
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) 165 MAX DEPEND CAPACITY (MWeNet)
  • DESIGN ELECTRICAL RATING (MWe Net) 1150
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Net) 57.5

~

4. REASONS FOR RESTRICTION (IF ANY) Confirmatory Action Letter dated July 16, 1985 restricts power from exceeding 5% until authorized by NRC.

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 0 1912.5 1912.5
6. REACTOR RESERVE SHUTDOWN HOURS 0 _

0 0

7. HOURS GENSRATOR ON LINE O O O
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 0 __

105,861.6 105.861.6

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 0
11. NET ELECTRICAL ENERGY GENERATED (MWH) O C _ 0
12. REACTOR SERVICE FACTCR N/A N/A N/A 13 .' REACTOR AVAILABILITY FACTOR N/A N/A N/A
14. UNIT SERVICE FACTOR N/A N/A N/A
15. UNIT AVAILABILITY FACTOR N/A N/A N/A
16. UNIT CAPACITY' FACTOR (Using MDC) N/A N/A N/A
17. UNIT CAPACITY FACTOR (Using Design FWe) N/A N/A N/A
18. UNIT FORCED OUTAGE RATE N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP 01/11/86
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06~/21/85 INITIAL ELECTRICITY 02/28/86 COMMERCIAL OPERATION 05/01/86
  • To be determined s r 9604010301 851231 jiG h DR ADOCM 0 % y1 ){g

, . . .. - _ . ~ . . . - . ,

' AVERAGE DAILY UNIT P0kER. LEVEL'

r.

DOCKET NO. 50-341' UNIT FERMI-2 DATE 01-07-86 COMPLETED BY L.P. Bregni'

' TELEPHONE (313) 586- 5313

-MONTH December ,

DAY - AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL  !

(MWe-Net). (MWe-Net) ,

1 0 17 0 2 0 18 - 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 - 26 0 11 0 26 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 N/A 16 0

/

DOCKET NO. 50-341 .

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Fermi - 2 DATE 01-07-86 COMPLETED BY L.P. Brevni

, RE}) ORT MONTH December TELEPHONE (313) 586-5313

8 '

' u m HI no<. e I. = 1~~omourI  !

mc m i m z ;o m o x m . ..

'

  • xmm. > i wo >cc

' mnm.

om .

m 0 5' ..

cs . mo .

m . mnzsM.

. .o m s so.

. -e.

NO l DATE I e

E mu

'l

$o l

-z .

C*l. @8S$G mo noo.

l CORRECTIVE ACTIONS / COMMENTS l e o . . . mi m. .

, i  ;  ; i I

. . . . I. . . .

ll 1 l 851201 l S l744.0 l H l 4 l Plant has been shut down since  ! ,

il l l l l l l October 11, 1985 f'or a scheduled l l l l l l l l maintenance outage and is still in  !

'l e l l l i

l a

l e

l the outage at this' time e

l a

e e. e. . . . . .

e i . i e i e e i e i e i e a e e e i i e e

s. e. e . e

. . . .i . .

e e . s s .

e .s .e e i . 4 s . . . . . e e e . . i e . .

,e e s s e e i e

'l. l i

l e

l l

l l

l

,e e i e i a e e l l l l l l l l e e . . . . . e i e i . . . .

e e e i . . e l l l l l l l

,ea . . , , , , e a e . . i e e i e e e e a e e e e e i _ .

i

. e. a. .

(1) REASONS A. EQUIPMENT FAILURE (EXPLAIN) E. OPERATOR TRAINING AND LICENSE EXAMINATION B. MAINT OR TEST F. ADMINISTRATIVE

, C. REFUELING C. OPERATIONAL era @. (EXPLAIN)

D. REGULATORY RESTRICTION H. OTHER (EXPLAIN)

(2). MEDIOD .

1. MANUAL 3. AUTOMATIC SCRAM s2. MANUAL SCRAM 4. OTHER (EXPLAIN)

2- .

% IaNE.I,7" DS,@ Oil r.<=un 'N son EEF " yanua,y 7, 1986 me ost.;oo.

NP8600ll U. S. Nuclear Regulatory Commission Attention: Director, Office of Resource ~ Management Washington, D.C. 20555 Gentlemen:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Mont'hly Operating Status Report for December, 1985 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for December, 1985. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact us.

Sincerely, cn R. S. Lenart Plant Manager Enclosure cc: Mr. P. M. Byron USNRC, Document Control Desk Mr. M. D. Lynch Washington, D.C. 20555 Regional Administrator Mr. Dennis Hahn USNRC Region III Division of Radiological Health 799 Roosevelt Road Michigan Department of Health Glen Ellyn, IL 60137 3500 North Logan P.O. Box 30033 Lansing, MI 48909 Mr. Jon Eckert i

Monroe Office of Civil Preparedness 965 South Raisinville Road [

Monroe, MI 48161