ML20154R555
| ML20154R555 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/15/1988 |
| From: | Hudspeth J ALABAMA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20154R558 | List: |
| References | |
| NUDOCS 8810040293 | |
| Download: ML20154R555 (1) | |
Text
- - -
r s.
Atbam3 Power Company s ",
i JM Fafiey Nucle:r Pfant s ford, sea a 36312 RESUENI? tD PEA ATTACRED MEMO Telephone 205 899-5156 Alabama Power rw s:a v ee e : :m -
September 15, 1988 US Nuclear Regulatory Commission ATTN Document Control Desk Washington, DC 20555 f
Dear Sir:
In accordance with Alabama Power Company Administrative Procedure FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to Emergency Plan Implementing Procedures (FNP-0-EIP-8, j
FNP-0-EIP-9, FNP-0-EIP-26).
I Please incorporate this new revision into your files and discard the old revision.
t i
Enclosed is a self addressed stamped envelope and a copy of our transmittal form. Please sign and return this form to the following 3
address:
l i
Alabama Power Company Farley Nuclear Plant
'j P.O. Box 470 Ashford, AI, 36312 I
s i
If you should have any questions, please call me at extenrion 2422, 205-899-5156.
i J
]
Sincerely, i
1 i
I ws l
oeyB/~Hudspeth
[
l FN Ddument Control pervisor JBHarab I
cc:
L. Enfinger W
J 4
8810040293 880915 PDR ADOCK 05000349
/l
)
F PDC
.