ML20154R438
| ML20154R438 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/26/1988 |
| From: | TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20154N650 | List: |
| References | |
| NUDOCS 8806070304 | |
| Download: ML20154R438 (3) | |
Text
-
^ '
\\a Errata
'(%)
.\\q, Mechanical PSR PSR Pace Item / Lina No.
Correction 3-1 13 Change "Radiation Monitoring" 1
to "Radiation Monitoring n 5-10 13 Change "radiation or chemical release." to "radiological or chemical release."
Table 5-3, New Under "Piping and Inline page 3 Components-(cont'd)" Add:
"Radiation Sources in Auxiliary Building, CPE-SWEC-FVM-EE/ME/
IC/CS-089" 31-32 Under "Mechanical Equipment" Delete: "Compartment radiation source inventory, CPE-SWEC-FVM-EE/ME/IC/CS-08 9 "
Table 5-4 Site Change "Site" to "Site 1" Site 3 Change "SITE" to "CP" i
Table 5-5 ATP-87-15,
Change "ATP-7075" to "ATP-7057" TUG-87-10 Change "05/15/87" to "07/06/87" h,
_1 0
s, Errata g_).
Mechanical PSR PSR Pace Item /Line No.
Correction Table 5-5 TUG-87-27 Change "TUG-87-27" to "TCP-87-27" and "QIA-7291" to "QIA-7298" ATP-87-539 Change "In Progress" to "ATP-7593" and add "Resp Not Reqd" ATP-87-538 Change "In Progress" to "ATP-7625" and add "In Progress" to Audit Response Transmittal column I
)
A4-5 4.19 Change "Diesel Generators" to "Diesel Generator Sets" A10-3 4.4 Change "Revision 1" to "Revision 0" A27-1 4.1 Change "1987" to "1978" B2-2 4.8 Change "Quality Assurance i
Procedure" to "Administrative l
Procedure" l
l l r l
l l
-