Forwards Special Rept 98-002,providing Results of WCGS Eight SG Tube ISI IAW TS 4.4.5.5.b.Commitments in Document Also Encl
ML20154R375
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/20/1998
From: Muench R
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ET-98-0073, ET-98-73, NUDOCS 9810270006
Download: ML20154R375 (19)


Text

.-

l i

W$LF CREEK

~

NUCLEAR OPERATING CORPORATION Richard A. Muench Vice President Engineering j

OCT 2 01998 ET 98-0073 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Station Pl-137 Washington, D. C.

20555 1

Subject:

Docket No. 50-482:

Special Report 98-002: Eighth Steam Generator Tube Inspection Results Gentlemen:

The attached Special Report is submitted in accordance with Wolf Creek Generatin, Station Technical Specification 4.4.5.5.b.

Special Report 98-002 provides the results of Wolf Creek Generating Station's eighth steam generator tube inservice inspection.

Attachment I provides Special Report 98-002.

Attachment II identifies ccmmitments contained in this document.

If you have any questions concerning this matter, please contact me at (316) _364-8831' extension 4034, or Mr. Michael J. Angus, at extension 4077 Very truly yours, Richar A. Muench RAM /rir Attachments cc:

I. Barnes (NRC), w/a W.

D. Johnson (NRC), w/a E. W. Merschoff (NRC), w/a B. A. Smalldridge (NRC), w/a K. M. Thomas (MRC), w/a QQ 9810270006 981020 PDR ADOCK 05000482 G

PDR P.O. Box 411/ Burhngton, KS 66839 / Phone: (316) 364-8831 An Equal Opportunity Employer n,W/HCNET

_._..__ _____. _ _ -.__ _. _ to ET 98-0073 Page 1 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Thig report is being submitted pursuant to Technical Specifications 4.4.5.5.b and 6. 9.2 to report the results of the eighth steam generator tube inservice inspection.

The eighth steam generator tube inservice inspection was completed by Westinghouse Electric Corporation on November 6,

1997 during the ninth refueling outage.

The following inspection programs were completed in steam generators "A" and "D":

100% bobbin coil, 55% Rotating Pancake Coil (RPC) top of the tubesheet, 50% RPC row 1 and 2 U-bends, and a special interest program.

Mechanical plugging was necessary because of indications of anti-vibration bar wear found during the inservice inspection.

Of the 5608 tubes inspected in Steam Generator "A",

a total of five tubes were plugged due to new indications found during the inspection.

Additionally, fourteen of the 5589 tubes inspected in Steam Generator "D"

were plugged due to new indications.

The inspection results, which include the location and percent of wall-thickness penetration for each indication of an imperfection, are listed in Section 3 of this report.

l 1

The results of the eighth steam generator tube inservice inspection have been classified into Category C-2.

Category C-2 is defined in Technical Specification 3.4.5 as inspection results that indicate, "One or more tubes, but not more than 1 percent of the total tubes inspected are defective, or between 5 percent and 10 percent of the total tubes inspected are degraded tubes."

Steam Generator "A" has 0.82 percent degraded tubes and 0.089 percent defective tubes. One tube is considered defective and has been plugged as a preventive measure based on wear rate calculations.

Steam Generator "D" has 1.83 percent degraded tubes and 0.25 percent defective tubes.

1. Number and Extent of Tubes Inspected:

A. Steam Generator "A": A total of 5608 tubes were inspected full length.

B. Steam Generator "D": A total of 5589 tubes were inspected full length.

I l

t l

I

Attachment I to ET 98-0073 Page 2 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS 2.

Identification of Tubes Plugged:

Row Column A.

Steam Generator "A":

New pluggable indications 45 39 40 51 37 73 50 75*

39 86

  • Tube (50,75) was plugged based on wear rate calculations as a preventive measure.

Row Column B.

Steam Generator "D":

New pluggable indications 42 20 44 21 45 22 41 23 48 27 41 29 47 29 45 53 44 55 47 58 48 71 44 72 40 105 35 109

3. Location and Percent of Wall Thickness Penetration for Each Indication of an Imperfection (Note:

Multiple listings of the same tube are the result of more than one indication in that tube):

Key for Indication Lista

  1. H, #C

(# = number) of Support Plate (s)

Hot Leg or Cold Leg Side AV#

Anti-Vibration Bar (# = number)

TSH Tube Sheet Hot Leg TSC Tube Sheet Cold Leg FBH Flow Baffle Hot Leg FBC Flow Baffle Cold Leg P

Tube Plugged, following % of Wall Thickness Loss i

J Indication

% cf Wall Thickness Loss Inch

(+,-)

Distance Measured from Reference from Point (AV Bar, Baffle Plate, Tube i

Location Support Plate, etc.)

Attachment I to ET 98-0073 Page 3 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "A"

Indication Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location 40 20 AV5 17

.00 39 25 AV2 15

.00 45 25 AV4 17

.00 t

45 25 AV5 31

.00 48 27 AV4 14

.00 48 27 AV5 13

.00 38 29 AV2 14

.00 38 29 AV3 12

.00 1

45 30 AV2 13

.00 45 30 AV3 17

.00 45 30 AV5 12

.00 51 30 AVS 15

.00 45 32 AV3 21

.00 45 32 AV4 34

.00 45 32 AV5 24

.00 47 32 AV3 19 00 47 32 AV4 15

.00 53 33 AV2 12

.00 53 33 AV3 16

.00 53 33 AV4-12

.00 53 33 AV5 13

.00 48 35 AV5 15

.00 33 36 AV2 15

.00 45 37 AV2 17

.00 45 37 AV3 21

.00 45 37 AV4 13

.00 30 38 AV5 13

.00 43 38 AV2 17

.00 43 38 AV3 35

.00 39 39 AV5 12

.00 44 39 AV3 17

.00 44 39 AV4 29

.00 t

44 39 AV5 23

.00 45 39 AV2 21

.00 45 39 AV3 42P

.00 45 39 AV4 39

.00 38 40 AV3 15

.00 46 40 AV2 15

.00 46 40 AV4 10

.00 46 40 AV5 17

.00 27 41 AV2 18

.00 27 41 AV5 18

.03 28 41 AV5 12

.00 38 41 AV3 21

.00 38 41 AV4 21

.00 40 41 AV3 18

.00 45 41 AV3 31

.00 45 41 AV4 30

.00 45 41 AV5 18

.00 45 41 AV6 20

.00

.._.__.-_..-__.....________.-._._.....e Attachment I to ET-98-0073

.Page 4 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "A"

Indication Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location 27 42 AV5 14

.00 36 42 AV2 12

.00 40 42 AV3 13

.00 40 42 AV4 ~

20

.00 36 43 AV2 19

.00 41 43 AV4 16

.00 40 44 AV3 24

.00 40 44 AV4 29

.00 40 44 AV5 17

.00 41 44 AV3 14

.00 41 44 AV4 18

.00 44 44 AV2 30

.00 44 44 AV3 25

.00 44 44 AV4 25

.00 44 44 AV5 25

.00 44 44 AV9 23

.00 28 45 AV5 21

.00 35 45 AV1 16

.24 35 45.

AV2 17

.00 36 45 AV2 17

.00 36 45 AV3 13

.00 36 45 AV5 24

.00 36 45 AV6 19

.00 39 45 AV4 19

.03 44 45 AV3 17

.00 44 45 AV5 14

.00 38 46 AV1 14

.00 38 46 AV2 15

.00 38 46 AV4 26

.00 39 46 AV2 17

.00 40 46 AV2 12

.00 40 46 AV3 19

.00 40 46 AV5 22

.00 43 46 AV4 20

.00 43 46 AVS 12

.00 44 46 AV3 13

.00 44 46 AV4 10

.00 44 46 AVS 13

.00 34 47 AV2 21

.00 34 47 AV5 19

.00 37 47 AV4 19

.00

-40 47 AV3 18

.21 40 47 AVS 18

.00 38 48 AV2 22

.00 38 48 AV3 22

.00 22 49 AV2 14

.00 30 49 AV1 35

.03 30 49 AV2 30

.00 30 49 AV5 32

.15 36 49 AV2 18

.00

_. _. ~. _. - _... _. _ _.. -. _ _. - _ _

-...-.___._.-.m.._

__.m.

Attachment I to ET 98-0073 Page 5 of 17

.SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "A"

Indication Inch (+)

Row Cotumn Location / Leg

(% of Wall Thickness)

From Location 40 49 AV2 10

.06 40 49 AV3 22

.12 36 50 AV2 19

.00 36 50 AV4 18

.00 36 50 AV5 15

.00 39 50 AV4 19

.00 40 51 AV1 20

.00 40 51 AV2 32

.00 40 51 AV3 45P

.00 38 52 AV3 13

.00 38 52 AV4 13

.00 38 52 AV5 19

.00 40 52 AV2 22

.00 40 52 AV3 18

.00 40 52 AV4 14

.00 40 52 AV5 25

.00 42 53 AV2 12

.00 49 53 AV5 17

.00 18 55 AV1 15

.00 44 56 AV2 18

.00 44 56 AV3 23

.00 44 56 AV4 16

.00 31 58 AV2 11

.00 40 58 AV3 26

.00 40 58 AV5 24

.00 41 58 AV2 18

.00 41 58 AV3 13

.00 43 58 AV2 23

.00 41 59 AV2 19

.12 41 59 AV3 21

.03 51 59 AV1 20

.00 51 59 AV2 29

.00 51 59 AV3 31

.00 51 59 AV4 33

.00 51 59 AV5 31

.00 51 59 AV6 15

.00 40 60 AV3 20

.00 44 60 AV3 19

.00 44 60 AV4 18

.00 34 61 AV4 25

.00 49 68 AV2 19

.00 49 68 AV3 15

.00 40 69 AV3 14

.00

)

40 70 AV3 28

.00 1

40-70 AV4 22

.00 40 70 AV5 12

.00 37 73 AV2 24

.12 37 73 AV3 44P

.00 37 73 AV4 26 24 37 74 AV3 29

.00

_ _ ~.. _ _ _....

Attachment I to ET 98-0073 Page 6 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "A"

Indication Row Column Location / Leg

(% of Wall Thickness).

Inch (+)

From Location 37 74 AV4 29

.00 37 74 AV5 28

.00 40 75 AV1 23

.03 40 75 AV2 10

.00 40 75 AV3 12

.09 40 75 AV4 14

.24 40 75 AV5 15

.00 41 75 AV2 15

.15 41 75 AV3 19

.00 41 75 AV4 13

.21 41 75 AV5 27

.09 41

~5 AV6 11

.00 s

42 75 AV1 19

.00 50 75 AV2 16

.12 50 75 AV3 38P

.00 50 75 AV4 32

.00 50 75 AVS 28

.00 39 76 AV2 23

.00 50 76 AV2 24

.00 50 76 AV3 22

.00 50 76 AV4 29

.00 50 76 AVS 16

.00 44 77 AV4 15

.15 34.

78 AV5 19

.00 39 79 AV4 21

.00 39 79 AV3 18

.00 39 79 AV4 26

.00 34 80 AV2 19

.00 39 80 AV2 24

.00 39 80 AV3 27

.00 39 80 AV4 26

.00 39 80 AVS 20

.00 j

39 80 AV6 34

.00 40 80 AV2 17

.00 46 83 AV2 13

.00 39 84 AV2 31

.00 39 84 AV3 32

.00 39 84 AV4 23

.00 39 84 AV5 21

.00 33 84 AV6 16

.00 39 85 AV3 29

.00 39 85 AV4 34

.00 39 85 AV5 20

.00 39 85 AV6 18

.00 31 86 AV5 21

.00 39 86 AV1 23

.00 39 86 AV2 21

.00 39 86 AV3 32

.00 39 86 AV4 41P

.00 39 86 AV5 22

.00 4

4

.a.

v

+- - - - -

- -.. -. ~.. - _ -.. -...

_, - ~,

. Attachment I to ET 98-0073 Page 7 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "A" Indication Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location i

39 87 AV2 13

.00 39 87 AV4 25

.00 30 88 AV2 16

.00 30 88 AVS 13-

.00 44 89 AV3 16

.00 44 89 AV4 12

.00 44 89 AV5 14

.00 44 89 AV6 11

.00 53 89 AV3 14

.00 I

50 90 AV5 24

.00 35 91 AV4 21

.00 l

36 91 AV2 21

.06 36-91 AV4 24

.00 36 91 AV5 14

.00 35 92 AV3 12

.00 39 93 AV3 17

.00 38 95 AV5 20

.32 39 95 AV3 20

.19 39 95 AV4 23

.44 39 95 AV5 15

.00 39-96 AV4 19

.00-27 97 AV1 10

.00 27 97 AV2 15

.00 38 98 AV3 21

.09 38 98 AV4 25

.00 38 99 AV4 24

.00 37 100 AV4 19

.00 43 103 AV3 18

.00 36 110 AV4 17

.00 36 110 Av5 16

.00 l

l 1

4

_m.

Attachment : to ET 98-0073 j

Page 8 of 17 l

SPECIAL REPORT 98-002 EIGHTH-STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D" Indication Inch (+)

Row Column Location / Leg 1% of Wall Thickness)

From Location 27 8

AV1 11

.00 27 8

AV6 16

.00 29 10 AV1 11

.00 29 10 AV2 12

.00 29 10 AVS 26

.00 30 10 AV2 14

.00 310 10 AV5 26

.00 32 11 AV6 10

.00 33 11 AV2 22

.00 j

33 11 AVS 17

.00 1

32 12 AV5 14

.00 i

32 12 AV6 9

.00 1

33 12 AV2 20

.00 33 12 AV4 15

.00 33 12 AV5 28

.00 33 13 AV4 20

.00 i

33 13 AV5 22

.00 33 13 AV6 39

.00 34 13 AV3 12

.00 32 11 AV4 11

.00 32 14 AV5 10

.00 33 14 AV3 16

.00 33 14 AV4 20

.00 33 15 AV4 22

.00 36 15 AV5 15

.00 36 16 AV4 22

.00 36 16 AV5 8

.00 37 16 AV4 20

.00 37 16 AVS 14

.00 35 17 AV3 19

.00 37 17 AV4 19

.00 37 17 AVS 20

.00 39 17 AV2 32

.00 39 17 AV3 37

.00 39 17 AV4 33

.00 39 17 AV5 30

.00 37 18 AV4 18

.00 38 18 AV4 10

.00 j

39 18 AV2 17

.00

)

39 18 AV3 18

.00 39 18 AV2 15

.00 39 18 AV3 19

.90 33 19 AV3 17

.00 38 19 AV3 17

.00 39 19 AV2 28

.00 39 19 AV3 22

.00 39 19 AV5 18

.00 39 19 AV6 17

.00 41 19 AV2 31

.00 41 19 AV3 28

.00

-...~..

~ _. - -..... -. -.. -..... -.-.

Attachment I to ET 98-0073 Page 9 of 17 SPECIAL REPORT 99-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS 4

Tube Indications In Steam Generator "D" Indication Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location 41 19 AV4 20

.00 41 19 AV5-25

.00 41 19 AV6 15

.00 39 20 AV3 21

.00 41 20 AV3 20

.00 41 20 AV4 28

.00 41 20 AV5 34

.00 41 20 AV6 20

.00 42 20 AV3 SIP

.00 42 20 AV4 15

.00 42 20 AV5 15

.00 42 20 AV6 39

.00 38 21-AV2 17

.00 38 21 AV3 13

.00 42 21 AV2 20

.00 42 21-AV3 29

.00 42 21 AV4 13

.00 I

42 21 AV5 39

.00 42 21 AV6 30

.00 l

44 21 AV1 15

.00 44

.21 AV3 37

.00 44 21 AV4 10

.00 44 21 AV5 45P

.00 44 21 AV6 28

.00 38 22 AV3 13

.00 45 22 AV2 12

.00 i

45 22 AV3 38

.00

]

4 45 22 AV4 11

.00 j

45 22 AVS 55P

.00 45 22 AV6 22

.00 l

l 41-23 AV4 17

.00 41 23 AV5 41P

.00 43 23 AV2 16

.00 43 23 AV4 25

.00 43 23 AV5 20

.00 43 23 AV6 26

.00 44 23 AV3 29

.00 44 23 AV4 26

.00 44 23 AV5 15

.00 39 24 AV4 20

.00 44 24 AV4-39

.00 44 24 AV5 36

.00 46 24 AV5 37

.00 44 25 AV3 11

.00 44 25 AV4 11

.00 44 25 AV5 12

.00 45-25 AVS 20

.00 46 25 AV1 12

.00 46 25 AV3 20 00 46 25 AV4 12

.00

L

- Attachment I to ET 98-0073 Page 10 of 17 SPECIAL' REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D" Indication Inch

(+).

Row Column Location / Leg

(% of Wall Thickness)

From Location 46 25 AV5 10

.00 44 26 AV4 27

.00 44 26 AVS 12

.00 48 26 AV4 10

.00 43 27 AV2 17

.00 43 27 AV3 23

.00 g

46 27 AV2 17

.00 46 27 AV3 24

.00 46 27 AV4 36

.00 46 27 AV5 29

.00 46 27 AV6 18

.00 48 27 AV2 30

.00 48 27 AV3 37

.00 48 27 AV4 57P

.00 48 27 AV5 18

.00 48 27 AV6 31

.00 49 27 AV4 17

.00 45 28 AV3 18

.00 45 28 AV5 24

.00 49 28 AV5 31

.00 49 28 AV6 31

.00 41 29 AV3 23

.00 41 29

-AV4 40P

.00 47 29 AV2 16

.00 47 29 AV3 22

.00 47 29 AV4 46P

.00 47 29 AV5 19

.17 47 29 AV6 18

.00 49 30 AV2 21

.00 49 30 AV3 18

.00 50 30 AV6 11

.00 51 30 AV3 25

.00 51 30 AV4 23

.00 51 30 AV5 22

.00 51 30 AV6 26

.00 46 31 AV4 13

.00 47 32 AV4 22

.00 47 32 AV5 21

.00 49 32 AV3 18

.00 37 33 AV3 26

.00 47 33 AV5 19

.00 33 34 AV5 16

.00 35 34 AV3 19

.00 39 37 AV2 18

.00 39 37 AV3 20

.00 39 37 AV4 22

.00 46 37 AV2 19

.00 46 37 AV3 27

.00 46 37 AV4 32

.00 46 37 AV5 28

.00

.-Attachment I to ET 98-0073 Page 11 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D"

l Indication Inch (+)

I Row Column Location / Leg

(% of Wall Thickness)

From Location 47 39 AV2 15

.00 47 39 AV4 21

.00 38 40-AV2 21

.00 38 40 AV4 11

.00 42 41 AV2 12

.00 42 41 AV3 28

.00 42 41 AV4 19

.00 42 41 AV5 12

.00 42 41 AV6 15

.00 51 41 AV1 15

.00 t

51 41 AV2 14

.00 37-42 AV4 21

.00 39-43 AV2 13

.00 39 43 AV4 21

.00 41 43 AV2 28

.00

'41 43 AV4 11

.00 45 43 AV3 16

.00 45 43 AV4 21

.00 45-43 AV5 12

.00 42 44 AV4 12

.00 42 44 AV5 13

.00 37 45 AV2 22

.00 44 46 AV2 10

.00 44 46 AV5

'14

.00 45 46 AV6 18

.00 44 47 AV3 19

.00 44 47 AV4 23

.00 50 47 AV4 18

.00 50 47 AV5 16

.11 50 47 AV6 14

.00 50 49 AV2 12

.00 50 49 AV3 15

.00 40 50 AV3 12

.00 40 50 AV4 13

.00 40 50 AV5 13

.00 48 50 AV3 35

.00 48 50 AV4 28

.00 48 50 AV5 30

.00 50 52 AV2 34

.00 50 52 AV3 25

.00 50 52 AV4 39

.00 50 52 AV5 36

.00 36 53 AV2 14

.00 37 53 AV5 13

.06 45 53 AV2 27

.00 45 53 AV3 36

.00 45 53 AV4 46

.00 45-53 AV5 49P

.00 45 53 AV6 43

.00 35 54 AV4 13

.20 35 54 AV5 16

.23

.--.- - - - -.---.~ ~. ~.-.

. ~ -.... -...-.. -. _ -...~..--

l Attachment I to ET 98-0073 Page 12 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D"

Indication Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location

{

45 54 AV3 18

.00 39 55 AV4 15

.00 41 55 AV3 13

.00 44 55 AV1 13

.00 44 55 AV2 13

.00 44 55 AV3 42P

.00 44 55 AV4 20

.00 44 55 AV5 32

.00 45 55 AV2 22

.00 45 55 AV3 19

.00 t

45 55 AV4 24

.00 45

.55 AV6 15

.00 45 56 AV2 21

.00 45 56 AV3 25

.00 45

.56 AV4 28

.00 50 56 AV3 29

.00 50 56 AV4 23

.06 50 56 AV5 19

.00 48 57 AV4 17

.00 35 58 AV2 13

.29 44 58 AV3 25

.00 47 58 AV1 23

.00 47 58 AV2 31

.00 47 58 AV3 34

.00 47 58 AV4 34

.00 47 58 AVS 46P

.00 45 59 AV2 21

.00 45 59 AV4 26

.00 45 59 AV5 17

.00 45 59 AV6 17'

.00 50 59 AV5 17

.00 50 59 AV6 21

.00 35 60 AV5 22

.00 48 60 AV3 29

.00 48 60 AV4 35

.00 35 61 AV3 14

.00 49 61 AV2 24

.00 50 62 AV2 22

.11 50 62 AV4 22

.17 55 62 AV2 25

.00 L

44 63 AV2 22

.00 44 63 AV3 26

.00 44 63 AV4 27

.00 44 63 AV5 15

.00 33 64 AV2 12

.00 33 64 AV3 12

.00 33 64 AV4 14

.00 41 64 AVS 16

.00 41 65 AV3 20

.00 41 65 AV5 14

.00 41 66 AV2 23

.00 w

.. ~ - -

w

. -, _ _ _. ~.. _ _

Attachment I to ET 98-0073 Page 13 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D"

Indication Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location

41 66 AV3 17

.00 41 66 AV4 27

.00 41 66 AVS 2'6

.00 41 66 AV6 20

.00 45 66 AV2 19

.00 34 68 AV2 11

.03 44 68 AV2 18

.00 44 68 AV3 21

.00 46 68 AV2 29

.00 46 68 AV3 18

.03 49 68 AV4 18

.00 48 69 AV2 25

.00 48 69 AV3 22

.00 44 70 AV2 21

.00 1

44 70 AV6 18

.00 36 71 AV1 26

.00 l.

36 71 AV2 15

.00 36 71 AV3 21

.00 36 71 AV4 21

.00 36 71 AV5 20

.00 36 71 AV6 15

.00 44 71 AV4 26

.00 44 71 AV5 31

.00 48 71 AV2 29

.00 48' 71 AV3 50P

.00 48 71 AV4 50

.00 l

48 71 AVS 18

.00 44 72 AV2 37

.00 44 72 AV3 58

.00 44 72 AV4 60P

.00 44 72 AVS 30

.00 l

44 72 AV6 35

.00 l

36 73 AV2 19

.00 36 73 AV5 20

.00 39 74 AV3 11

.00 44 74 AV2 14

.00 i

44 74 AV3 20

.00 l

44 74 AV4 13

.00 44 74 AV5 16

.00 45 74 AV2 14

.00 39 75 AV2 15

.00 39 75 AV5 18

.00 1

46 75 AV4 24

.00 l

49 75 AV2 29

.00 l

~49 75 AV5 25

.00 L

50 75 AV2 36

.00 50 75 AV3 32

.00 50 75 AV4 25

.00 I

50 75 AV5 30

.00 52 76 AV2 10

.00 39 77 AV2 17

.00 j

i i'

Attachment I to.ET 98-0073 Page 14 of 17

-SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D"

=

Indication Inch (+)

Row' Column Location / Leg

(% of Wall Thickness)

From Location 39 77 AV3 21

.00 39 77 AV4 23

.00 i

39.

77 AV5 18

.00 39 77 AV6 20

.00 39 78 AV3 18

.00 41 78 AV2 14

.00 46 78 AV2 10

.00 50 78 AV2 10

.12 28 79 AV3 17

.03 28 79 AV4 14

.14 33 79 AV5 10

.00 36 80 AV3 13

.00 36 80 AV4 11

.00 37 81 AV3 16

.00 43 81 AV2 75

.00 43 81 AV3 26

.00 43 81 AV4 14

.00 43 81 AV5 15

.00 45 81 AV3 17

.00 49 81 AV2 23

.00 51 81 AV4 24

.00 51 81 AV5 24

.00 43 82 AV2 13

.00 49 82 AV2 15

.00 39 83 AV3 27

.00 39 83 AV4 22

.00 20 84 AV6 22

.00 40 84 AV2 38

.00 40 84 AV3 38

.00 40 84 AV4 14

.00

'40 84 AV5 29

.00 41 84 AV1 12

.00 41 84 AV3 20

.00 45 85 AV2 27

.00 45 85 AV3

'39

.00 45 85 AV4 30

.00 45 85 AV5 23

.00 45 85 AV6 12

.03 49 85 AV2 23

.00 49 85 AV4 15

.00 50 85 AV4 21

.00 50 85 AVS 15

.00 45 86 AV2 19

.00 45 86 AV3 37

.00 45 86 AV4 20

.00 45 86 AV5 13

.00 45 86 AV6 14

.00 47 86 AV2 8

.00 47 86 AV3 18

.00 40 87 AV1 16

.06 40 87 AV2 16

.09 J

Attachment I to ET 98-0073 Page 15 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS l

Tube Indications In Steam Generator "D"

Indication Inch (+)

Row-Column Location / Leg

(% of Wall Thickness)

From Location 40 87 AV3 18

.00

.40 87 AV4 32

.00 50 87 AV4 17

.00 50 87 AVS 17

.00 38 88 AV3 9

.00 45 88 AV3 14'

.00 45 88 AV4 15

.00 1

45 88 AV5 26

.00

~

53 88 AV2 10

.00 51 89 AV3 35

.00 51 89 AV4 29

.00

'51 89 AV5 25

.00 51 89 AV6 23

.00

.36 90 AV3 15

.00 36 90 AV4 9

.00 42 90 AV5 25

.00 53 90 AV4 18

.00 53 90 AV5 21

.00 32 91 AV5 16

.00 40 92 AV3 13

.00 40 92 AV5 12

.00 43 92 AV3 17

.00

'49 92 AV2 15

.00 49 92 AV4 12

.00 45 93.

AV4 21

.00

.45 93 AV5 21

.00 48 93 AV2 20

.00 48 93 AV3

'24

.00 48 93 AV4 26

.00 43 94 AV2 8

.00 44 94 AV3 12

.00 41 95 AV5 22

.03 45 95 AV4 28

.00 45 95 AVS 33

.00 41 96 AV2 12

.00 44 96 AV2 12

.00 44 96 AV3 16

.00 44 96 AV4 14

.00 45 96 AV5 22

.00 38 97 AV4 11

.00 38 97 AVS 16

.00 i

40 97 AV3 18

.00 J

40 97 AV4 21

.00 41 97 AV3 25

.03 l

41 97 AV4 31

.00 40 98 AV3 16

.00 40 98 AV4 11

.00 43 99 AV5 17

.06 34 100 AV3 9

.00 j

38 100 AV2 10

.00 i

38' 100 AV3 10

.00 l

t

Attachment I to ET 98 0073 Page 16 of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D" Indication Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location 41 100 AV2 17

.00 41 100 AV3 14

.00 41 100 AV4 15

.00 41 100 AV5 12

.00 38 101 AV3 19

.00 36 102 AV5 10

.00 40 102 AV3 22

.00 40 102 AV4 18

.00 1

36 103 AV3 13

.00 36 103 AV4 16

.00

.38 103 AV3 13

.00 38 103 AV4 25

.00 i

40 103 AV2 21

.12 40 103 AV3 26

.00

)

40 103 AV4 20

.00 l

40 103 AVS 12

.00 40 103 AV6 12

.00 35 104 AVS 14

.00 40 104 AV2 28 00 40 104 AV3 16

.00 40 104 AV5 16

.00 40 104 AV6 14

.00 35 105 AV6 16 1.65 38 105 AV3 27

.00 38 105 AV4 22

.00 40 105 AV2 30

.00 40 105 AV3 45P

.00 40 105 AV4 32

.00 40 105 AV5 19

.00 34 106 AV4 9

.00 35 106 AV2 13

.00 35 106 AV3 10

.00 35 106 AV6 12

.00 35 107 AV4 17

.00 35 107 AV5 11

.00 35 108 AV4 21

.00 35 100 AV5 12

.00 35 108 AV6 15

.00 32 109 AV5 12

.00 33 109 AV3 15

.C.

33 109 AV4 18

.00

-33 109 AV5 18

.00 34 109 AV2 14

.00 34 109 AV6 14

.03 35 109 AV3 25

.00 35 109 AV4 45P

.00 35 109 AV5 16

.00 32 110 AV5 14

.00 35 110 AV4 12

.00 30 111 AV2 11

.00 30 111 AV6 12

.00

. =......... -.. - _. -

Attachment I to ET 98-0073 Page 17'of 17 SPECIAL REPORT 98-002 EIGHTH STEAM GENERATOR TUBE INSPECTION RESULTS Tube Indications In Steam Generator "D" Indication-Inch (+)

Row Column Location / Leg

(% of Wall Thickness)

From Location 1

30 114 AV5

-37

.00 24 115 AV1 19

.00 27 115 AV6 19

.00 28 115 AV6 36

.00 4

1 h

d a

f

Attachment II to ET 98-0073

)

Page 1 of 1 LIST OF COM4ITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document.

Any other statements in this submittal are provided for information purposes and are not considered to be commitments.

Please direct questions regarding these commitments to Mr.

Michael J.

Angus, Manager Licensing and Corrective Action at Wolf Creek Generating Station, (316) 364-8831, extension 4077 col 4(ITMENT Due Date/ Event None N/A