TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 5N 1578 Lookout Place SEP 361968 1
U.S. Nuclear Regulatory Commtssion ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authortty
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - 0FFICE OF INSPECTION AND ENFORCEMENT BULLETIN (IEB) 86 STATIC "0" RING (SOR) DIFFERENTIAL PRESSURE SWITCHES
References:
1.
NRC letter to TVA dated June 23, 1988, "NRC Bulletin 86-02 (TAC NOS. R00321/R00322)"
2.
TVA letter to NRC dated March 18, 1988, "Sequoyah Nuclear Plant (SQN) Units 1 and 2 - Office of Inspection and Enforcement Bulletin (IEB) 86 Static.'O' Ring j
Differential Pressure Swltches" 3.
TVA letter to NRC dated November 7, 1986, "Office of Inspection and Enforcement Bulletin 86 Static
'O' Ring 01fferential Pressure Swttches - Sequoyah Nuclear Plant" i
References 2 and 3 transmitted TVA's supplemental and original responses to i
NRC transmitted their safety evaluation to TVA in reference I and stated "... that TVA has satisfactorily addressed all issues identified by the bulletin." Reference 1 also requested that TVA confirm that the SOR switches in the unit I residual heat removal (RHR) and upper head injection (UHI) systems had been replaced with the modified SOR switches before restart.
This letter provides that confirmation.
l The unit 1 RHR SOR switches were installed by engineering change notice (ECN) 6707 and calibrated by ECN 7149.
The unit 1 UHI SOR switches were installed by design change notice (DCN) 00260. Calibration of the UHI switches by DCN 00260 is pending approval of proposed technical specification change 88-20, l
submltted August 15, 1988, i
r
[
8810040202 000926 PDR ADOCK 05000327 G
PNV t
An Equal opportunity Employer
. - _ ~ _.. _., _. _ _. _ _.
' g.*
hKP 26 88 U.S. Nuclear Regulatory Commission Please direct questions concerntrig this issue to Russell R. Thompson at (615) 870-7470.
Very truly yours.
TENNESSEE VALLEY AUTHORITY O
f e,
ngr Nuclear Licens ng and Regulatory Affairs cc: Ms. S. C. Black, Assistant Director for Projects l
TVA Projects Olvision U.S. Nuclear Regulatory Commission One White Fitnt, North 11555 Rockville Pike l
l Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Olrector for Inspection Programs TVA Projects Olvision U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379