Responds to 860307 Request That Ofc of Inspector & Auditor Rept, T-Shirt Incident Be Released Per 10CFR2.744 & 2.790. Rept Represents Assessment of Handling of Incident Rather than Licensee Activities
ML20154R082
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/25/1986
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Garde B
TRIAL LAWYERS FOR PUBLIC JUSTICE, P.C.
References
CON-#286-612 OL, NUDOCS 8603280043
Download: ML20154R082 (3)


Text

7-

'q .

  1. R 2 5 W Ms. Billie P. Garde Director, Environmental Uhistleblower Project Trial Lawyers for Public Justice, P.C.

2000 P Street, N.W.

Washington, DC 20036 In the Matter of Texas Utilities Electric Company, et al. -

(Comanche Peak Gteam Electric Station, UiiTts 1 and 2)

Docket Nos. 50-445 & 50-446

Dear Ms. Garde:

This is in response to your letter dated March 7, 1986 in which you request, pursuant to 10 C.F.R. I 2.744 and 5 2.790, that the staff release the report prepared by the Office of Inspector and Auditor (OIA) regarding the "T-Shirt Incident" at the Comanche Peak site and the report prepared by the Office of Investigations (OI) of the Fermi Unit 2 Safeteam program, as well as related documents.

As you no doubt recognize , the report prepared by OIA presents an assessment of the staff's handling of the "T-S hirt Incident" and not an assessment of the licensce's activities. As such, I am unable to determine that this document is relevant to the issues involved in the ongoing Comanche Peak licensing proceeding, as required by 10 C.F.R. I 2.744. Nonetheless I am advised that the Commission has recently determined to release this report and its attachments in response to a request by Mr. T. Carpenter of the Government Accountability Project (GAP) dated January 31, 1986, and to place them in the Commission's Public Document Room where they are available for your inspection and copying. Note that minimal deletions to these documents were made to protect the privacy and confidentklity of certain individuals. OIA is currently assembling and reviewing related documents, as further requested by your March 7 letter, in connection with two pending FOIA requests filed by you on behalf of GAP, to determine whether and to what extent those documents can be released pursuant to 10 C.F.R. I 2.700.

and 10 C.F.R. Part D. Pending completion of OI A's review and determination, I am unable to release any documents beyond those identified above, 5

k A

DO

With respect to the OI report of the Fermi-2 Safeteam program, I am likewise unable to agree with your assertion of its relevance to the ongoing Comanche Peak licensing proceeding. The Comanche Peak Safeteam program, which is a voluntary effort by the licensee and not one required by the NRC's regulations, must be assessed on its own merits and not in comparison with a similar program employed at another facility. Your letter does not otherwise establish the relevance of this document in the context of Comanche Peak. In any event, I am informed by OI that the report and related documents are being reviewed by 01 in connection with a pending FOIA request to determine whether and to what extent the report and related documents can be released pursuant to 10 C.F.R. I 2.790 and 10 C.F.R. Part 9. Pending completion of OI's review and determination, I am unable to release these documents.

Sincerely, Originni signed by

. Victor Stello .

Victor Stello, Jr.

Acting Executive Director for Operations i

cc: Service list i

DISTRIBUTION:

L. Chandler G. Mizuno .

E. Christenbury R. Bachmann G. Cunningham M.Karman J.Murray M. Rothschild B. Ilayes G. Berry G.Edles J. Scinto V. Stello PDL J. Roc T.Rehm J. Sniezek P.Norry EDO 1512 ELD FF (2) .

NRC Central 1

[b (.CACLLN.6, (ul? C @ D() b y O

/ -

, Jd

>>/

n. t ,u l,rp' ]

NAME :LChandler

EChristenbury :GCunningham :BIlayes
f. .
GEdles ntt____
VStelld DATE 3/18/86 $3/@/86 3//d8G :3/ /00 :3/ /86 :3 /86

--~

~

p 3. , ,

-iY 3 l ..

'# UNITED STATES

! 'o,7., NUCLEAR REGULATORY COMMISSION -

$ I WASHINGTON. C. C,20066 . ( s's.Il'
  • */

EDO PRINCIPAL CORRFSPONDENCF CONTROL FROM: DUE: 05/30/86 EDO CONTROL: 001512 DOC DT: 03/07/86

~ BILLIE PIRNER GARDE FINAL. REPLY:

TRIAL LAWYERS FOR PUBLIC JUSTICE TO:

STELLO FOR SIGNATURE OF: ** GREEN ** SECY NO:

CUNNINGHAM DESC: ROUTING:

~ REQUEST PltRSUANT TO 10 CFR 2.744 L 2.796 BY THF STF1LO CITIZENS ASSOCIATION FOR SOUND ENERGY (CASE) FOR ROE 1985 OI A RFPORT RE "T-SHIRT INCIDENT'.' L 1984 01 RFHM REPORT INTO THE SAFETEAM PATENTED PROGRAM SNIE2EK DATE: '03/11/86- ~

ASSIGNED TO: ELD CONTACT: CUNNINGHAM

^

SPECIAL INSTRUCTIONS OR RFMARKS:

b COORDINATF WIlH OGC ouJ415

~

,, ._ r c ,

TRIAL LAWYERS FOR PUBUC JUSTICE. P.C.

COUNSU10R$ ATLAW SUITE 611 2000 P STREET. NORTHWEST ANTHONY L rot 5 MAN MASHINGTON. D.C. 20036 (202)463-8600 EXECUTNE DIRECTOR

~

ARTHUR BAYANT STAN ATTORNEY

. BILUE CARDE

- DIRECTOR, UMRONMENTAL WHtSTLESLOWER PRO lECT BARaARA rRATT OmCE MANAGER March 7, 1986 KATHLLEN CUM 80tBATCH SECRETARY Mr. Victor Stello,

. Acting Director Executive Director of Operations U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stello,

Pursuant to $10 C.F.R. 2.744 and $2.790 the Citizens Association for Sound Energy (CASE) requests that the Staff release a copy of two specific d,ocuments and all related documents:

1) The August 1985 report of the Office of Inspector and Auditor into Region IV's handling of the "T-Shirt Incident," and all related documents generated during the' development of the report and subsequest to its release.
2) The 1984 report of the Office of Investigations into the SAFETEAM patented program, as implemented at the Fermi II nuclear power plant.

These records are relevant to issues now before the Atomic Safety and Licensing Board in the Comanche Peak operating license hearings. ( Docket 50-445 & 50-446) The "T-Shirt incident" has been the subject of extensive hearings before the Board, and also has been the subject of staff investigations and analysis of harassment and intimidation at the Comanche Peak site. (See, generally the record of the OL Docket 2 hearingst the Proposed Findings of Fact of the parties, September 1984; the reports of EG&G, " Comanche Peak Steam Electric Station, Alleged Climate of Intimidation," September 1984 and September 1985; and other inspection and enforcement documents regarding the harassmet of electrical quality control inspectors.)

The SAFETEAM, is a program to identify and investigate safety concerns of workers at Comanche Peak. It was introduced to the site in the spring of 1985. The adequacy of the Applicant, Texas Utilities, to effectively identify and resolve worker allegations is the heart of CASE's contention regarding the breakdown in Quality Asurance and Quality Control.

7 b 3'?f:/(( g EDO --- 001512

- ._ . . =-

, ~C ,

.SAFETEAM employs a patented program which was first developed and used at the Fermi nuclear power plant. That program and its ability to detect and resolve allegations

, - was evaluated by the Office of Investigations at Fermi. The results of that investigationn is relevant to the proceeding and to CASE's evaluation of the SAFETEAM program at the Comanche Pe,ak site.

].

Please provide those documents, and all related documents,

,, by March 17, 1986. If the staff does not intend to release the

documents please notify us in writing as soon as possible, but j not later that March 17, 1986, so that we may seek formal
discovery pursuant to 10.C.F.R. 2.744. We appreciate your i l attention to this matter.

4 Sincerely,

! M kJ (14tm) - E 't 0 Billie Pirner Garde Representative of CASE cc: service list

)

4 4

I E

(

i I

i i