ML20154Q933

From kanterella
Jump to navigation Jump to search
Discusses Plans for 981116-1204 on-site Team Insp of Engineering Activity at Peach Bottom Atomic Power Station, Using Insp Procedures,IP37001,IP40500 & IP93809.Documents Listed in Encl Should Be Provided During Wk of 981102-06
ML20154Q933
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/16/1998
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9810260110
Download: ML20154Q933 (4)


Text

.. - -,.-..

.-. -.~

4 o

October 16, 1998 q:

Mr. G. Rainey, President PECO Nuclear -

- Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195

' Wayne, Pennsylvania 19087-0195

SUBJECT:

NRC ENGINEERING TEAM INSPECTION at the PEACH BOTTOM ATOMIC

' POWER STATION

Dear Mr. Rainey:

LAn on-site team inspection of your engineering activity at Peach Bottom Atomic Power Station, using Inspection Procedures IP37001,IP40500, and IP93809,is planned over the period November 16,1998 through December 4,1998. The team effort will be in the area of 50.59 evaluations, identification and resolution of problems, engineering involvement i

with operations and maintenance, and a vertical slice inspection of engineering input that.

supports two plant safety systems. The overall objective of the inspection is to determine the capability of the engineering function to support safe and reliable plant operation. The team willinclude up to five inspectors, and a team leader.-

To effectively prepare for the inspection, we request that you provide the documents listed in the attachment to NRC during the week of November 2-6, during which time the team leader will visit PBAPS to carry the documents back to the regional office for review'during preparation week (November 9-13) prior to the site inspection. The schedule of the inspection has been discussed with Douglas Keene,'who is leading the PBAPS effort to assist our inspectors.

Should you or your staff have any questions about the inspection, please contact Mr. A.

Lohmeier at (610) 337 5089 (Fax (610) 337 5320), or myself at (610) 337 5211.

Sincerely, t

[

4 Glenn W. Meyer, Chief Civil, Mechanical and Materials Engineering Branch Division of Reactor Safety 0I f

Docket Nos. 50-277;50-278 9810260110 981016 PDR ADOCK 05000277 G

PDR

-.. ~ ~. -. ~ -. - -. -. -. -

Mr. G. R6iney.

2-cc w/ encl:

J. Hagan, Vice President, Nuclear Station Support

-J. Doering, Vice President, Peach Bottom Atomic Power Station M. Warner, Plant Manager, Peach Bottom Atomic Power Station G. D. Edwards, Chairman, Nuclear Review Board R. Boyce, Director, Nuclear Quality Assurance A. F. Kirby, lil, External Operations - Delmarva Power & Light Co.

'G. J. Lengyel, Manager, Experience Assessment:

J. W. Durham, Sr., Senior Vice President and General Counsel T. M. Messick, Manager, Joint Generation, Atlantic Electric

.W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin,' Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland

' Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams :

Commonwealth of Pennsylvania State of Maryland TMI-Alert (TMIA) b l lt r-F k-4

~ - -.. -

.. -.. -. ~

Mr. G. Rainey 3

- Distribution w/ encl:

. Region i Docket Room (with concurrences)

- J. Wiggins, DRS L. Nicholson, DRS G. Meyer, DRS A. Lohmeier, DRS C. Anderson, DRP D. Florek, DRP '

A. McMurtray, SRI

' R.' Junod, DRP Nuclear Safety information Center (NSIC)

NPC Resident inspector PUBLIC B. McCabe, OEDO R. Capra, PDI-2, NRR i

Inspection Program Branch, NRR (IPAS)

.M. Thadani, NRR B. Buckley, NRR M. Campion, ORA DOCDESK 9

4

' DOCUMENT NAME: G:\\CMMEB\\LOHMElER\\PBENG.LTR 72 receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No scopy OFFICE Rl/DRS l6 Rl/DRS l6

/

l l

l p

NAME ALohmeier4 g(/,/6 GMeyer(/'/2g 6,.,

DATE-10/16/98 ft//gjyg 10//6/98 10/ /98 10/ /98 10/ /98 OFFICIAL RECORD COPY

l a

MATERIALS REQUESTED FROM PEACHBOTTOM ATOMIC POWER STATION Engineering Team inspection l

1.

Current Station Organization Charts for Engineering, Operations, and Maintenance 2.

List of PBAPS Contacts assigned in support of the inspection 3.

FSAR, Technical Specifica'tlons, Design Basis Documents (Availability on Site _)

4.

Administrr%ve Procedures (Availability on Site) 5.

Operation Experience Feedback 6.

Engineering and Maintenance Backlog Status.

7.'

. Work Authorization for safety related systems past year

'~

8.

Current Material Condition and Equipment Performance Report 9.

Index of Self assessment Reports (Last Year) 10.

IPE/PRA report summary 11.

List of significant engineering tasks over past year 12.

List of LERs for past year I

13.

Current Peach Bottom Atomic Power Station Monthly Update Report l

14.

List of 10 CFR 50.59 Safety and Operability Evaluations /with Procedures i

15.

Root Cause Evaluations 16.

ISEG Report Summary 17.

Current System Assessments (Maintenance Rule) 18.

Specific system performance data (obtain after vertical slice systems to be inspected have been chosen) i

_. -..