ML20154Q858

From kanterella
Jump to navigation Jump to search
Notice of Nonconformance from Insp on 980908-1002. Nonconformance Noted:Valcor Failed to Prescribe Written Guidance within Procedures & Drawings to Control Application of Dry Film Graphite Lubricant to V70900-65-11 Series
ML20154Q858
Person / Time
Issue date: 10/21/1998
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20154Q780 List:
References
REF-QA-99900728 NUDOCS 9810260092
Download: ML20154Q858 (1)


Text

.

NOTICE OF NONCONFORMANCE Valcor Engineering Corporation

- Docket 99900728 Springfield, New Jersey Based on the results of an inspection conducted on September 8-11, and October 2,1998, it appears that certain of the Valcor Engineering Corporation (Valcor) activities were not conducted in accordance with NRC requirements.

Criterion V, " Instructions, Procedures, and Drawings," of 10 CFR Part 50, Apper. dix B requires that activities affecting quality be prescribed by documented instructions and procedures and shall be accomplished in accordance with those instructions and procedures.

Contrary to Criterion V, Va!cor failed to prescribe written guidance within its procedures and associated drawings to control the application of Acheson Colloids Company (Acheson) dry film graphite lubricant (Dag@ 156) on its V70900-65-11 series solenoid operated valves.

Additionally, Valcor failed to address a Dag@ 156 tec:- ' cal information sheet note that expressed a five minute drying time caution before assembling components. (Nonconformance 99900728/98-01-01)

During the October 2,1998, portion of the inspection, the inspectors reviewed your corrective actions and steps taken to preclude recurrence and found thern acceptable. Therefore, no further response to the NON is required.

this cO/') Pad ::de,."Mryland Dated a J;, of Octobar 1998 9810260092 981021

^

PDR GA999 EECVALCE 99900728 PDR

.