ML20154Q789

From kanterella
Jump to navigation Jump to search
Advises That Changes in Line Organization & Ofcs at Plant Require Emergency Response Plan Operational Support Ctr to Be Relocated.Relocation Expected on or About 890403
ML20154Q789
Person / Time
Site: Calvert Cliffs  
Issue date: 09/21/1988
From: Forgette T
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810040064
Download: ML20154Q789 (3)


Text

o

' JP A

B A t.TIMORE OASAND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE MARYLAND 21203 September 21, 1988 t

U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvtrt Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318

~

Occrations) Sunriort Cen r 4

Gentlemen:

I This is to advise you that changes in line organization and offices at Calvert Cliffs are requiting the Emergency Response Plan Operational Support Center (OSC) to be relocated.

As you asa sware, the current OSC is located on the second floor, South Service Building. This is within 6he Protected Area and is a shared facility with Outage 1

Planning. The new location will be on the first floor, Interim Office Building.

l southwest corner. The Interim Office Building is also within the Protected Arca.

]

Operational Support Center and Outage Planning will continue to share space, j

Plans for relocating to the Interim Office Building are attached. As you will see, the expected move is on or about April 3,1989.

"t his matter was reviewed by telephone with Mr. Craig Conklin of your office on Friday, I

September 2, 1988. If you have any questions regarding this matter, please contact me at (301) 260- 1996.

I Very truly yours, i

Thomas E. Forgette i

Supervisor - Emergency Planning l

TEF/DLS/dtm f

/

p Attachment 8G100400/4 880921 1 \\

PDR ADOCK 05000317 I

F PDC w

o i

Documelt Ccitr:I Desk September 21, 1988 Page 2 a

i cc:

D. A. Brune, Esquire J. E.

Silberg, Esquire R. A.Capra, NRC S. A. McNeil, NRC l

W. T. Russell, NRC D. C. Trimble/V, L. Pritchett, NRC f

T. Masette DNR E

W. J. Lazarus, NRC r

i i

r 1

t I

l l

f l

r 1

I t

l t

I l

i I

B

CALVERT CLIFFS NUCLEAR POWER PLANT OPERATIONAL SUPPORT CENTER RELOCATION (All dates except for Graded Exercise are tentative.)

Sept.

October November December January February March April 5 l12l39 l& 3 l1417l24l31 7 l14 l 21l 2B 5 l12 l19l&

219 (16l23130 6 l13 l2D l27 6 l13 l2Dl27 3 l10 l17 lM Office move - 2nd X

floor SSB to NSB Office move - balance X

of 2nd floor SSB to 10B Renovate 2nd floor X

SSB (except OSC area)

Renovate Ist floor 10B X

Graded ERP Exercise X->

Install duplicate OSC X

communications in IOB Training X

Procedure changes X

Relocate status boards X

and equipment to I0B I0B OSC operational X

Renovate OSC area in SSB X