ML20154Q417

From kanterella
Jump to navigation Jump to search
Recommends Restart of Plant Pending Util Completion & NRC Insp & Closeout of Issues Identified in Encl Restart Readiness Assessment Rept.W/O Rept
ML20154Q417
Person / Time
Site: Pilgrim
Issue date: 09/26/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8810030394
Download: ML20154Q417 (3)


Text

_ _

b SEP 261988 HEMORANDUM FOR: William T. Russell Regional Administrator FROM: Samuel J. Collins, Chairman Pilgrim Restart Assessment Panel

SUBJECT:

PILGRIM RESTART RECOMMENDATION The memorandum from W. F. Kane to you dated July 8,1987, established t6 Charter for the Pilgrim Restart Assessment Panel. In accordance with that Charter, this forwards the Panel's Report documenting its conclusions and their bases concerning the Boston Edison Company's (BECo) readiness to restart the Pilgrim Nuclear Power Station (PNPS) from a management effectiveness and technical perspective.

Based on the extensive and comprehensive review docu nented in the enclosed Restart Readiness Assessment Report, it is the consensus view of the Panel that the management and techiical problems existing at the time of shutdown in April 1936 have been resolved. Further, the Panel concludes that BECo's management controls, programs, and personnel are generally ready and performing at a level to support safe startup and operation of the Pilgrim Nuclear Power Station.

The Pilgrim Restart Assessment Panel therefore recommends authorizing restart of the Pilgrim Nuclear Power Station pending BECo's completion and NRC inspection and closecut of those issues identified as restart items i t, the enciastd report.

ORIGINAL SIGNET, By Samuel ,1. Collins, Chairman Pilgrim Restart Assessment Panel l

Enclosure- 1 As stated l l

l OFFICIAL RECORD COPY PILGRIM RAR - 0001.0.0 \p 09/25/88 setoosvav4 wova -r c l' /

PDR P

ADOCK C5000293 FLC j/ J /

Y .

. Memorandum for William T. Russell 2 SEP %61988 cc w/ encl:

R. Bird, Senior Vice President - Nuclear, BECo Chairman, Board of Selectmen, Plymouth Chairman, Board of Selectmen, Carver Chairman, Board of Selectmen, Duxbury Chairman, Board of Selectmen, Marshfield Chairman, Board of Selectmen, Kingston The Honorable Edward P. Kirby The Honorable Peter V. Forman The HonoteLle Edward J. Markey Plymouth Civil Defense Director P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts M. Ernst, Committee on Energy, Commonwealth of Massachusetts l S. Pollard, Energy Secretary, Ccmmonwealth of Massachusetts l B. McIntyre, Chairman, Department of Pubite Utilities N. Johnson, Chairman, Duxbury Nuclear Committee l R. Boulay l M. Conyngham l M. Jeka l K. Anderson i Public Document Room (FDR) l Local Public Document Room (LPDR) l Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Massachusetts (2) l l

l 1

l I

l OFFICIAL RECORD COPY PILGRIM RAR - 0002.0.0 09/25/88

. Memorandum for William T. Russell 3 SEP 261988 bcc w/ enc 1:

Region I Docket Room (with concurrences)

T. Murley, NRR B. Clayton, ED0 W. Kane, RI T. Martin, RI S. Ebneter, RI Pilgrim Restart Panel Members S. Collins, RI J. Wiggins, RI A. Blough, RI R. Bellamy, RI J. Durr, RI B. Boger, NRR R. Wessman, NRR D. Mcdonald, NRR L, Doerflein, RI C. Warren, SRI - Pilgrim M. Miller, RI K. Abraham, RI (2)

M. J. DiDonato, RI (2) bcc w/o enc 1:

E. Wenzinger, RI i

J. Linville, RI l F. Miraglia, NRR l D. Crutchfield, NRR

5. Varga, NRR C, Rossi, NRR F. Alstulewicz, NRR J. Roe, NRR l

F. Congel, NRR l

l ev T ts N l RI:0RP MI:DRP k!:DRP (.DRP l

L0oerfitin/mjd ityRBlough JWiggins [ lins i b -

9/?$/83 9/i5/88 9/ C/83 9/@/88 l OFFICIAL RECORD 20PY PILGRIM RAR - 0003.0.0 l 09/25/88

'