ML20154P942
| ML20154P942 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/30/1988 |
| From: | Beck J TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CP-88-25, TXX-88701, NUDOCS 8810030237 | |
| Download: ML20154P942 (1) | |
Text
.__-____ __ _ _ - _ _ _
e.,
- M Log # TXX-88701 i
4 File # 10110
=
=
907.1 Ref.i10CFR50.55(e)
MlELECTRIC September 30, 1988 un c.c e rmwn m %
t t
U. S. Nuclear Regulatory Commission Attn Document Control Desk i
Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 AUXILIARY FEE 0 WATER PUMP TURBINE CONTROL PANEL SDAR:
CP-88-25 (SUPPLEMENTAL REPORT)
Gentlemen:
On January 29, 1988, TU Electric notified you via our report logged TXX-88170 of a deficiency in the design of the Auxiliary feedwater (AFW) Pump Turbine control panel which could impair the Auxiliary Feedwater System's ability to provide emergency feedwater to the Steam Generators.
The last report was logged Txx-88519, dated June 30, 1988.
The urpose of this supplemental report is to revise the corrective action im lementation schedule.
The estimated completion date has been revised for the design modification required to automatically isolate the control panel components when the AFW turbine driven pump is required to auto start.
The new completion date is December 19, 1988.
Very truly yours, l
W. G. Counsil I
By:
g M/
+
J @n W. Beck i
Vice President, Nuclear Engineering i
VPC/mlh c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3)
$$koo$Db!
[
S T$37 m s m s os - sur m un v.u rn n.m M-
_-.____.-----_____.,--__.-_..---_L
-.. -