1 September 23, 1988 P'ro' ject No. 669 d
I
+
N I
i E. E. Kintner, Chairman ALWR Utility Steering Comittee GPU Nuclear Corporation I
l One Upper Pond Road Parsippany, NJ 07054
\\
Dear Mr. Kintner.
SUBJECT:
ADVANCED LIGHT WATER REACTOR REQUIREMENTS DOCUMENT, RESOLUTION i
0F ISSUE 94 i
4 i
ByletterdptedMarch 28, 1988, the ALWR Steering Comittee replied to the i
staff's request for additional information regarding Low Terperature Over-pressure Protection for ALWRs.
I Based on the comitments of that 1rtter, the staff considers the issue resolved i
j for the ALWR Requirements Docuinet t.
i Sincerely,
/s/
J William O. Long, Senior Project Manager j
Standardization and Non-Power i
Reactor Project Directorate I
Division of Reactor Projects !!!,
)
!Y, Y, and Special Projects i
Office of Nuclear Reactor Regulation c
1 cc:
J. Devine, EFRI 1
8810030105 880923
]
PDR PROJ pg 669A i
DISTRIBUTION:
I (1 SEETTITe7 EHylton BGriines JTsao GSchwenk NRC PDRs Blong ACRS(10)
JRajan CYCheng gD i
PDSNP Reading OGC CMiller EThrom
. 7 GHolahan EJordan MWHodges HVanderrolen l
P N POSNP v/
PDSNPcf v f
f fI 1
EH ton WLong:Is CMiller l
0/
88.
09/2//88 09/S/88 I
t I
. i /"
- e, '.
UNITED STATES
~
NUCLEAR REGULATORY COMMISSION
{
WASHINGTON, D. C. 20604
%, o....,
September 23, 1988 Project No. 669 P
1 l
l E. E. Xintner, Chairman ALWR Utility Steering Committee i
GPU Nuclear Corporation i
One Upper Pond Road Parsippany, NJ 07054
Dear Mr. Kintner:
SUBJECT:
ADVANCE 0 LIGHT WATER REACTOR REQUIREMENTS DOCUMENT, RESOLUTION OF ISSUE 94 t
By letter dated March 28, 1988, the ALWR Steering Committee replied to the I
staff's request for additional information regarding Low Temperature Over-pressure Protection for ALWRs.
Based on the commitments of that letter, the staff considers the issue resolved for the ALWR Requirements Document.
Sincerely, 7
NNs D-l William O. Long, Senior Project Manager Standardization and Non-Power i
Reactor Project Directorate Division of Reactor Projects !!!,
IV, V, and Special Projects Office of Nuclear Reactor Regulation cc: