ML20154N773
ML20154N773 | |
Person / Time | |
---|---|
Issue date: | 06/19/1979 |
From: | Bunting J NRC |
To: | Browning R NRC |
References | |
TASK-TF, TASK-URFO NUDOCS 9810220087 | |
Download: ML20154N773 (3) | |
Text
.. .. . . . - _ . -
/~ 1 cea 9 9
+ UNITED STATES
[ g ' NUCLEAR REGULATORY COMMISSION l
'$ ,E WASHINGTON, D C. 20555 l g . . . . . p' i JUN 1919M j MEMORANDUM FOR: Robert E.. Browning, Deputy Director Division of Waste Management )
i FROM: Joseph 0. Bunting, Jr., Chief Licensing Process and Integration Branch
SUBJECT:
STAFF RESPONSE TO QUESTION 4 FOR HEARINGS l 0NAGREEMENTSTATESPROGRAM(EDO6571) g As requested, enclosed is the staff response to Question 4 G r hearings on Agreement States Program. Wayne Kerr of State Programs l also requested the staff to respond to this question and we also telefaxed.him a copy.
, O & A -/
' J seph 0. Bunting, Jr. , Chief icensing Process and Integration BrancF, WM
Enclosure:
As stated O\
v 9810220007 790619 PDR STPRG ESGGEN PDR
wp_-.-,---....---.--.-.---.-.-..-..~.----
,3 9 9
- %~
y, n;
,4 . DRAFT i, > ETourigny:pfh, l ' ". 6/19/79:
, . Question for Hearing on Agreement States Program - EDO 6571 l
H ' Question 4: What is..the status ~ of NRC standards and requirements for the
' siting, licensing,'and regulation of low-level waste burial grounds? How fdo these standards compare with those being implemented in, agreement states? !
.c L
, Answer: NRC is' developing a comprehensive set of regulations, regulatory
- guides,l and staff technical positions for the shallow land burial of low-i f_ '
lev'el wastes. NRC' plans on issuing proposed regulations governing waste
.r '
,' . m c classification and the' disposal of low-level wastes by shallow land burial
,e . .
- 6 [ by(the'e.nd oI FY80. . In addition, NRC. plans on issuing in FY80 proposed s wr ~
regulatory guides for the preparation.of license applications and environ- !
mental reports and ot'her regulatory guides and staff technical positions for low-level waste disposal- by shallow land burial. All proposed regulations:and regulatory guides are to be finalized by the end of FY82.
' ~
' Genera 118 as N ' RC prepares and issues new regulations, regulatory guides,
, b; ?
and staff technical positions, the agreement states adopt and implement
- .similarrequirementsintheihregulatore rograms.
- 4. 2 Whilelfonnal ~ regulations are being prepared, NRC is preparing staff technical
.n positions on the shallow-land burial of low-level wastes. A staff technical i
position has'been published relating to the closure and ~ stabilization of shallow lan'd burial grounds. This staff position has been incorporated'in 7,
1the state and NRC licenses covering the disposal operations at the Barnwell, t
. South Carolina facility.- In addition, progress has been made to incorporate the staff position in the state and NRC licenses for the disposal operation '
/
+ - - - T- - *
= c# + L; y .,
gl G
.u.
rT_ .CO ..._ '
+
.4 0.j - s. . (,
}Nr N '
at Hanford,.Washingtori. We are working with Nevada to'similarly cover'the disposal operation 11ocated at Beatty. This staff position was filed with
~
- 1the'boardhearingtheSheffieldcase; 'All of theseIfacilities except for-
- lSheffield are'in'agreeme'nt states.
~
Other interim staffft'echnical positions are being developed,' e.g.,_ solidification Lof liquid bearing waste, segregation of chemicals. When these staff positions
'? "
are. completed, we will incorporate them in NRC licenses' and we will work with L
the agreement states to incorporate them in the agreement states licenses.
- l. The agreement states.look to the NRC to set out the technical! and other require-
.ments for licensing. Iow-level wast'e disposal facilities an'd are prepared to
^
L implement similar requirements in their licensing programs.
NRC also has a program:to. provide technical, assistance to agreement states.
Technical assistance may be requested by the agreement ~ states on health, safety, and environmental issues. -This program helps assure that the L
technical ~ requirements;that are used by the agreement states to license h disposal sites are' equivalent to the technical requirements that NRC uses.
In FY79 an'd FY80, 'we, plan to provide health, safety, and environment'a l t.
. assessment to Washington for the renewal of their state disposal license
~ '
.at Hanford and to Kansas'for an application to estab1ish a new-site at
- Lyons,-Kansas. . In FY81',"we plan on providing a health, safety and environmentalasse$sment^fortheagreementstatesrenewal.oftheBeatty, 4
- t. .
- Nevada ' license.-[We plan lon.doing.a.similar assessment in FY82 for the
~
i m . .- ~
p ' ~ Lagreement state renewal of the Barnwell, South Carolina license.
, < s ,
'b >.a ,* ,
e
+ .<
%
- t 3
C q. 1 i , ,
c/ : ,
[. i [
Li' L 3
-- g?* t
- ~, '
y
, M ;'