ML20154N463

From kanterella
Jump to navigation Jump to search
Forwards Plant Transient Response Implementation Plan Procedures,Per 880802 Request.W/O Encl
ML20154N463
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/21/1988
From: Fogarty E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8809290313
Download: ML20154N463 (1)


Text

,

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 l

PHILADELPHI A, PA 19101 n,i........

..6.......f^."."....

September 21. 1988 l

  • * *;,[,*

l Docket Nos. 50-277 50-278 r

Mr. R. M. Gallo, Chief Operations Branch Division of Reactor Safety

[

U.S. Nuclear Regulatory Comission l

Region !

l ATTN: Document Control Desk i

Washington, D.C.

20555

SUBJECT:

Request for Peach Bottom Emergency Operating Procedures l

Dear Mr. Gallo:

As requested by W. T. Russell's August 2. 1988 letter to C. A. McNeill (PEco).

we have enclosed controlled copies of Peach Bottom Transient Response implementation I

i Plan (TRIP) pror.edures. These include the following' i

l i

i 1

Operational Transient (OT) Procedures

[

l 2

Off Normal (0N) Procedures j

4 3

Symptom Based flow Chart Procedures (T-100 series)

)

4 Narrative Emergency Procedures (T-200 series) l l

2 If you have any questions or require additional information, please do not i

hesitate to contact us, j

i Very truly yours.

l U

t Enclosures (R. M. Gallo only) cc:

Addressee 475 Allendale Road

[

King of Prussia, PA 19406 W. T. Russell, Administrator, Region I. USNRC (w/o Enclosures)

T. P. Johnsori. NRC PB Senior Resident inspector (w/o Enclosures) j

1 0809290313 000921 JD}f I

PDR ADOCK 05000277 1

P PNU 1

I O t

l f

1