f pf o g UNITED STATES
.g ( g NUCLEAR REGUL ATORY COMMISSION
- g. : e wasHINGT ON, D. C. 20555 g %.e , /
March 13, 1966 Docket No. 99901038/85-01 3M Company Ceramic Materials Department ATTN: Mr. Joseph T. Bailey Department Manager 225-4N-07 3M Center Saint Paul, Minnesota 55144-1000 Gentlemen:
This refers to the inspection conducted by Mr. J. J. Petrosino of this office on November 20-22, 1985, of your facility at Saint Paul, Minnesota and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
The purpose of this inspection was to review the circumstances surrounding the electrical cable ampacity de-rating information which 3M recently supplied to the Omaha Public Power District, and to evaluate the implementation of your quality assurance program. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During the inspection, it was found that the implementation of your QA program failed to meet certain NRC requirements. Our inspectors identified three nonconformances concerning, the QA Manager's lack of independence from production, lack of a QA program indoctrinatior for 3M personnsi, and a lack of documented procedures to control a 3M computer code program which is used for nuclear power station applications.
Please provide us within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.
The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
8603170174 860313 PDR GA999 EPfv3MCO 99901038 PDR
3M Company -
2- ,
In accordance with 10 CFR 2.790 of the Commission's regulatinns, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, f [3 Gary G. Zech, Chief es Sa-Vendor Program Branch Division of Quality Assurance, vendor, and Technical Training Center Programs Office of Inspection and Enforcement
Enclosures:
- 1. Appendix A-Notice of Nonconformance .
- 2. Appendix B-Inspection Report 99901038/85-01
- 3. Appendix C-Inspection Data Sheets (1 page) cc: Mr. W. P. Nitardy, QA Manager 3M Company Ceramic Materials Department 225-4N 3M Center Saint Paul, Minnesota 55144-1000
, - , . , ~w--, --~ . - - - - - - - , - , , - -en~ew-w- - - . . , , . , - , , n -- , n, - +n ,r ,_ .
3M Company March 13, 1986 In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Shou?d you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, Odginal$12ned by gory G.Zech Gary G. Zech, Chief Vendor Prograr. Branch Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement
Enclosures:
- 1. Appendix A-Notice of Nonconformance
- 2. Appendix B-Inspection Report 99901038/85-01
- 3. Appendix C-Inspection Data Sheets (1 page) cc: Mr. W. P. Nitardy, QA Manager 3M Company Ceramic Materials Department 225-4N 3M Center Saint Paul, Minnesota 55144-1000
\)ISTRIBUTION:
- IE:09 VyBReading DQAVT Reading RVollmer JStone EWMerschoff JJPetrosino EYachimiak REArchitzel JEKonklin Elmbro
- 1. Parker 09 i
I
- DQAVT f B:0QAVT /J PB:DQAVT D :D VT G 7ech BKG mes M Petrosino:t /EWMerschoff p/86 3 /lf/85 g/(6/86 / .Q6,
. - - - - , -.----,-,-,y- p-, -_ --.-----,w-,-m
. _ _ ,-,--,y-,e - - , - - - - -