Informs That Millstone ICAVP Branch of Office of Nuclear Reactor Regulation Reviewed Rev 4 to Project Procedure (PP)-01, Sys Vertical Slice Review, & Rev 4 to Project Instruction (PI)-01,submitted to NRC on 980714
ML20154M975
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/22/1998
From: Imbro E
NRC (Affiliation Not Assigned)
To: Curry D
AFFILIATION NOT ASSIGNED
References
NUDOCS 9810210102
Download: ML20154M975 (5)


Text

1 pMCu

)(

I p

\\

UNITED STATES o

E NUCLEAR REGULATORY COMMISSION U

E

' i.) fNQ WASHINGTON, D.C. 30666 4 001 i

September 22, 1998 %

,a 7 4 f,.'! !g: qg a

PUEUC DD:Uy;9g Daniel Curry, Project Director Parsons Power Group Inc.

2675 Morgantown Road r

Reading, PA 19607 l

Dear Mr. Curry:

The staff of the Millstone Independent Corrective Action Verification Program (ICAVP) Branch of the Office of Nuclear Reactor Regulation has reviewed Revision 4 to Project Procedure (PP) -01, " System Vertical Slice Review" (SVSR) and Revision 4 to Project Instruction (PI) -01, 1

"SVSR implementation Checklists and Workbook," submitted to the NRC on July.14,1998.

Most of the changes to PP-01 were minor editorial corrections or clarifications that directed the process to rely on the licensing basis information for Millstone Unit 2 in conducting the SVSR.

The change made to the depth of the system review were consistent with the directions provided by the staff to incorporate lessons learned from the ICAVP at Millstone Unit 3.

Changes to Parsons' review of training material is consistent with the staff's guidance in this area.

Most of the changes in Revision 4 to PI-01 were also minor editorial corrections or clarifications that directed the process to rely on the licensing basis information for Millstone Unit 2 in conducting the SVSR. The most significant change involved the directions provided for the review of the licensee's Individual Plant Examination for External Events (IPEEE) and Individual Plant Evaluation (IPE). Previously, detailed directions were provided to the reviewers for conducting the IPEEE and IPE reviews. Based on discussions with the NRC technical staff conducting the reviews of the IPEs and IPEEEs, the staff of the ICAVP Branch has determined that your review in this area is not required. The NRC's review of the IPEs and IPEEEs is still ongoing and the IPE and IPEEE address conditions that are beyond the current design and licensing basis requirements for Millstone Unit 2. Therefore, you are requested to delete the reference to the review of the IPE and IPEEE from your audit plan and implementing procedures.

The other major change made to PI-01 was to stop the review of tubing design based on the results of the SVSR conducted on the High Pressure Safety injection (HPSI) system. The HPSI SVSR identifieo programmatic issues with the design of tubing that were documented in a i

discrepancy report (DR) provided to the licensee.- Based on the issuance of the programmatic

\\I DR for tubing design discrepancies, no further review in this area is required by Parsons.

I 9810210102 980922 I

PDR ADOCK 05000336 kDk P

PDR

}.

m -n5 l

l 1

i l

_.. _ _. _ _ _ _ _, _ ~ _ _ _ _ _ _ _ _ _. _.. -.

I

'e ' ' Mr. D. Curry '

2 Minor editorial errors where discussed with members of your staff. With the incorporation of these minor editorial errors, the staff has determined that Revision 4 to PP-01 and Revision 4 to PI-01 are acceptable for use during the Millstone Unit 2 ICAVP. If you have any questions ~or comments please contact me at (301) 415-2951.

- Sincerely,

/s/ by P. Koltay for l

Eugene V. Imbro, Director i

Millstone ICAVP Associate Director for Technical Review Office of Nuclear Reactor Regulation Docket No. 50-336 cc: See next page QlSTRIBUTION:

Docket Files SPO R/F PUBLIC-BSheron WDean DMcDonald EBenner DOCUMENT NAME: C:\\MYFILES\\lCAVP\\ PARSONS \\PP01 R4. PAR

  • See previous concurrence page To fece6ve a copy of this document, inslicate in the box v s Copy without attachlenci"E" a Copy with attachsenci "N" a No copy OFFICE ADT/IC VP C

LA C

ADT/ICAVP D:lCAVP A

NARIE JANakoski LBerry*

PKoltay* h -

EVimbro j

DATE h /224 9 / 8 / 98 9 / 14 / 98

/

/ 98 OFFICIAL RECORD COPY 1

j l

y-y v

v --

l I

r

\\

~

Mr. D. Curry 2

i l

Minor editorial errors where discussed with members of your staff. With the incorporation of these minor editorial errors, the staff has determined that Revision 4 to PP-01 and Revision 4 to PI-01 are acceptsble for use during the Millstone Unit 2 ICAVP. If you have any questions or u

comments please contact me at (301) 415-2951.

Sincerely,'

h Eugene V. Imbro, Director Milistone ICAVP Associate Director for Technical Review Office of Nuclear Reactor Regulation Docket No. 50-336 t

cc: See next page l6 l

l l

i I,

i

?

4 l

~ _ _. -

r l

Mr. D. Curry.

3 Millstone Nuclear Power Station Unit 2 cc:

Lillian M. Cuoco Esquire Mr. F. C. Rothen Senior Nuclear Counsel Vice President - Work Services Northeast Utilities Service Company Northeast Utilities Service Company i

P. O. Box 270 -

P. O. Box 128 Hartford, CT 06141-0270 Waterford, CT 06385 Mr. John Buckingham Ernest C. Hadley, Esquire Department of Public Utility Control 1040 B Main Street Electric Unit P.O. Box 549 10 Liberty Square West Wareham, MA 02576 New Britain, CT 06051 Mr. John F. Streeter Mr. Kevin T. A. McCarthy, Director Recovery Officer - Nuclear Oversight Monitoring and Radiation Division Northeast Utilities Service Company Department of Environmental Protection P. O. Box 128 79 Elm Street Waterford, CT 06385 Hartford, CT 06106-5127 Mr. David B. Amerine Regional Administrator, Region i Vice President - Human Services

)

U.S. Nuclear Regulatory Commission Northeast Utilities Service Company 475 Allendale Road P. O. Box 128 King of Prussia, PA 19406 Waterford, CT 06385 l

First Selectmen Mr. Allan Johanson, Assistant Director i

Town of Waterford Office of Policy and Management Hall of Records Policy Development and Planning l

200 Boston Post Road Division Waterford, CT 06385 450 Capitol Avenue - MS# 52ERN P. O. Box 341441 l

Mr. Wayne D. Lanning, Director Hartford, CT 06134-1441 Millstone Inspections Office of the Regional Administrator Mr. M. H. Brothers 475 Allenda s Road Vice President - Operations King of Prussia, PA 19406-1415 Northeast Nuclear Energy Company i

P.O. Box 128 L

Charles Brinkman, Manager Waterford, CT 06385 l

Washington Nuclear Operations l

ABB Combustion Engineering Mr. J. A. Price

(

12300 Twinbrook Pkwy, Suite 330 Director-Unit 2 Rockville, MD 20852 Northeast Nuclear Energy Company P.O. Box 128 Senior Resident inspector Waterford, CT 06385 Millstone Nuclear Power Station c/o U.S. Nuclear Regulatory Commission P.O. Box 513 l

Niantic, CT 06357 l

l t

I

l Mr. D. Curry 4

Millstone Nuclear Power Station Unit 2 i

cc:

r Mr. B. D. Kenyon (Acting)

Attorney Nicholas J. Scobbo, Jr.

Chief Nucler Officer-Millstone Ferriter, Scobbo, Caruso, Rodophele, PC Northeast Nuclear Energy Company 1 Beacon Street,11th Floor j

t P.O. Box 128 Boston, MA 02108 Waterford, CT 06385 Mr. J. P. McElwain Citizens Regulatory Commission Recovery Officer - Millstone Unit 2 i

ATTN: Ms. Susan Perry Luxton Northeast Mislear Energy Company 180 Great Neck Road P. O. Box W8 Waterford, CT 06385 Waterford, Connecticut 06385 i

Deborah Katz, President -

Citizens Awareness Network P. O. Box 83 Shelburne Falls, MA 03170 The Honorable Terry Concannon Co-Chair Nuclear Energy Advisory Council Room 4035 Legislative Office Building Capitol Avenue Hartford, CT 06106 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Little Harbor Consultants, Inc.

Millstone -ITPOP Project Office P, O. Box 0630 Niantic, CT 06357-0630 j