ML20154M673
| ML20154M673 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/20/1988 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | Hannon J Office of Nuclear Reactor Regulation |
| References | |
| C311-88-2126, GL-88-13, NUDOCS 8809290058 | |
| Download: ML20154M673 (3) | |
Text
GPU Nuclear Corporation
. Nuclear
- 3oma r/8o Middletown. Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Olal Number:
Septenber 20, 1988 C311 2126 Mr. John Hannon Chief, Operator Licensing Branch OWFN-100-18 US Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Hannon:
Three Mile Island Nuclear Station, Unit 1 (THI-1)
Operating License No. DPR-50 Occket No. 50-289 Operator Licensing Examination Schedule This letter is in response to the request for Proposed Operator Licensing Examination Schedules contained in GL 88-13.
Enclosures 1 and 2 of the GL are attached per the request.
Sincerely, s
- 11. D. 0 111 Vice President A Director, THI-1 HDH/DVH/spb:1259A cc:
W. Russell, USNRC R. Conte USNRC i
Enclosures I
8009290058 800920 4d 0
i PDR ADOCK 05000289 l
V PNV
.[
g L
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORMAT Facility TMI-1 NRC Region I
FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)(10/1/89-9/30/90)(10/1/90-9/30/91)(10/1/91 1.
Date 2/13/89 2/90 2/91 12/91
- RO 1?
1 12 4
- SRO Instant
- SRO Upgrade 8
I WSR0 Limited 2.
Date 10/93 10/91 IRO
- 5R0 Instant 4
- SRO Upgrade 4
- SRO Limited Please indicate initial cold license examinations by placing an asterisk (*)
by the date.
Please indicate examinations intended to extend an Operator's license to a second or subsequent unit with two asterisks (**) (e.g., if Unit One is in ope. ration and Unit Two is approaching fuel load and three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates licensed on Unit One are to be examined to extend th Unit Two, then indicate "R0 3,5**.')
PROPOSED REQUALIFICATION EXAMINATION SCHEDULE FO I
Facility Till-1 NRC Region i
FY 1989 FY 1990 FY 1991 FY 1992 (10/1/88-9/30/89)
(10/1/89 9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92)
Written 1.
Date 2/89 Date None Da te_. 2/91 Date N008 Walk-Through 2.
Date_ 2/89 Date 2/90 Date 2/91 Date_
2/92 Sirnulator 3.
Date d /89 Date 1/90 Date 1/91 Date_
1/92 l
4 Date Date Date Date I
4 i
i s
l J