ML20154M581

From kanterella
Jump to navigation Jump to search
Requests Notification of Receipt of Rev 26 to Operations QA Policy Manual.If Rev 26 Has Been Received,Completion & Return of Encl Ack Requested
ML20154M581
Person / Time
Site: Farley  
Issue date: 05/18/1988
From:
ALABAMA POWER CO.
To: Grace J
NRC
References
SAER-88-190, NUDOCS 8806020010
Download: ML20154M581 (2)


Text

Alabama Power Company O

600 North 16th Street e

Post Offic3 Box 2641 8

Birmingham. Alabama 35291 Telephone ?OS 250-1000 b

7.10 *. 2 l Alabama Power SAER 88-190 tM sotd%vn t wey:!rc $g!em May 18, 1988 Attention: Dr. J. N. Grace As of this date, we have not received acknowledgement that you have received Revision 26 to your copy #59 of our Operations Quality Assurance Policy Manual.

If you have not received this revision, please notify us at once.

If you have already received Revision 26, please complete the attached acknowledgement and return it to SAER - 16N0435 as soon as possible.

Thank you, Safety Audit & Engineering Review 8806020010 880518 PDR ADOCK 05000348

(

P DCD

\\

(

m

l w

1 y

AI.mM P(.Mk.R CWANY

+

WNJAL REVISION NOTICE FOR 'IEE OPERATICNS QUALI'IY ASSURNACE POLICY MANUAL REVISION 26 DA'ITD 04-05-88

'IO:

44 Os MANUAL NO.

[f LE'(/ kN6 dLt'm INSERTION INSTRUCTIONS We attached constitutes Revision 26 to the Joseph M. Farley Nuclear Plant (FWP) Operations Quality Assurance Policy Manual (OQAPM). Please remove the Title Page, Preface, Distribution List, List of Effective Pages, Approval Sheets, Chapters 1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 16, 17, 18, 19, 20 and 21, Appendix A, B and D, and replace with the attached pages.

Using the List of Effective Pages in the Preface section of your 00APM, please verify that it is complete and up to date. Also, please discard the superceded pages.

(

  • W.' McGowan k Manager, ety Audit & Engineering Review Receipt of Revision 26, Copy No. 8 9 of the Ooerations Quality Assurance Policy Manual is acknowledged.

We manual has been page checked using the List of Effective Pages and is complete and up to date.

Name Date PLES.SE RE'IURN ' IRIS ACRCifLEDGDENT OF RECEIPT 'IO:

{

Mr. J. W. McGowan, Manager Safety Audit & Engineering Review Alabama Power Company P. O. Box 2641 16N-0435 Corporate Headquarters Birmingham, Alahama 35291

.