Forwards Insp Rept 50-289/98-06 on 980810-27 & Nov.Violation Re Change Made to Makeup Sys cross-connect Valves
ML20154L949
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/15/1998
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20154L952 List:
References
50-289-96-201, 50-289-98-06, 50-289-98-6, EA-98-456, NUDOCS 9810200124
Download: ML20154L949 (3)


See also: IR 05000289/1998006

Text

. . . .. - - . - . - .. -- . . . - . - . - . - - .

\j  !

- , . 0ctober 15, 1998

l

i

i

i &

i

EA 98-456 i

Mr. J. Langenbach ,

'

Vice President and Director

GPU Nuclear, Inc. _

!

Three Mile Island Nuclear Station l

P. O. Box 480 )

Middletown, Pennsylvania' 17057-0480 l

l

i

SUBJECT: NRC INSPECTION REPORT NO. 50-289/98-06 AND NOTICE OF VIOLATION l

l

Dear Mr. Langenbach:

]

The NRC conducted an inspection between August 10 and August 27,1998, at the Three

Mile Island Nuclear Station. The inspection was focused on your resolution of the items i

identified during the 1996/1997 NRC Architect Engineering (AE) Team inspection  !

'

(50-289/96-201).- At the conclusion of the inspection, the results were discussed with

you, Mr. Art Rone and others of your staff at an exit meeting held on August 27,1998.  ;

!

Action taken to address AE team open items were found to be appropriate, msulting in l

'

closure of those items. However, one item, involving a change made to the makeup

, system cross-connect valves, was identified as a violation of NRC requirements. The 1

safety evaluation associated with the changes did not address the most limiting I

configuration of the system, thereby resulting in a pressure-level correlation for the makeup  !

'

tank that was not sufficiently bounding. The violation is cited in the enclosed Notice of

Violation (Notice) because changing the configuration of the cross-connect valves created

the possibility of introducing gas (from the makeup tank) into the suction of makeup pump

P-1C, and as such, introduced an unreviewed safety question.

You are required to respond to this letter, and should follow the instructions specified in

the enclosed Notice when preparing your response. Your response should address the

justification for continued operation with the cross-connect valves open. The NRC will use

your response, in part, to determine whether further enforcement action is necessary to ,

ensure compliance with regulatory requirements.

L

f

4

9810200124 981015 F

PDR ADOCK 05000289 - k

G PM , / bO

/

.

,. , -

.. _

. -

... .-_ . . .. . - - - . . . . - - - . .~ - - . - - . - . . - . ..

,

,

'

.

p.

,

.

l Mr. James Langenbach '2

. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures, and your response will be placed in the NRC Public Document Room

(PDR).

Sincerely,

t

!

James T. Wiggins, Director

Division of Reactor Safety

l

Docket No.: 50-289

'

l

License No.: DPR-50

i

l

Enclosure: Notice of Violation i

NRC Inspection Report No. 50-289/98-06

)

cc w/ encl:

M. J. Ross, Director, Operations and Maintenance

l D. Smith, PDMS Manager '

l M. Laggart, Manager, Licensing and Vendor Audits

l J. Wetmore, Manager, Nuclear Safety and Licensing

E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)

l TMI-Alert (TMIA) i

l Commonwealth of Pennsylvania

! l

l

l

2

m

b

I

i

1

!

l'

. _. ._. - . _ ~ ._

t

.

Mr. James Langenbach' 3

' Distribution w/ encl: l

Region i Docket Room (with concurrences)

Nuclear Safety.Information Center (NSIC)

PUBLIC -

NRC Resident inspector

H. Miller, RA/W. Axelson, DRA

J. Wiggins, DRS

L. Nicholson, DRS

E. Kelly, DRS

P. Eselgroth, DRP

N. Perry, DRP ,

D. Haverkamp, DRP  !

C. O'Daniell, DRP

J. Yerokun, DRS

B. Boger, ADPR, NRR

DRS File

Distribution w/enci(VIA E-MAIL):

B. McCabe, OEDO

C. Thomas, PD1-3, NRR

T. Colburn, PD1-3, NRR

R. Eaton, PDI-3, NRR

R. Correia, NRR

F. Talbot, NRR

J. Lieberman, OE (OEMail)

D. Holody, EO, RI

J. Goldberg, OGC

F. Davis, OGC

A. Nicosia, OGC

M. Campion, ORA i

D. Screnci, PAO

DOCDESK

Inspection Program Branch, NRR (IPAS)

_. _

DOCUMENT NAME: G:\ SYSTEMS \YEROKUN\TMl98-06. INS

,

Ta receive a copy of this documer 1, indicate in the box: 'C' = Copy without ettachment/ enclosure 'E' - Copy with attachment / enclosure ' N' =

i No copy

OFFICE Rl/DRS g4,l Rl/DRPj l $. Rl/DRS n J Rl/DRS l l

NAME JYerokun "# pes W EKelly QQ/, _ _ JWiggins Q-

DATE- 9fff98 9/Jo/98' 9H98' (gf(0/4'( /9/jp98 8

l OFFICIAL RECOR$ CO SY