Text
._
i m
=2 Log # TXX-88677 4
File # 10110 908.3
# IU " " U'00('I 1UELECTRIC 4
gim g g September 14, 1988 U. S. Nuclear Regulatory Comission Attn:
Document Control Desk j
Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i DOCKET NOS. 50-445 AND 50-446 CLASS 1E AND NON-CLASS 1E CABLE SEPARATION l
j SDAR: CP-88-12 (SUPPLEMENTAL REPORT) i Gentlemen:
On January 11, 1988, TV Electric letter logged TXX-88071 provided notification that the deficiency involving a violation of electrical separation criteria j
was reportable under the provisions of 10CFR50.55(e).
The latest report on this issue, logged TXX-88594, was submitted August 1, 1988. This supplemental j
report is submitted to update the corrective action implementation schedule.
The estimated completion date for the rerouting and redesignation of Unit 1 3
cables E0140291 and EG140305 as non-Class 1E has been revised.
These activities are now expected to be completed by December 15, 1988.
I l
As discussed in previous correspondence, a Field Verification Method (FVM) is being utilized to identify any additional instances of this deficiency.
The 1
number of this FVM has been : hanged to CPE-SWEC-FVM-EE-088, "PCHV Program i
Er9eering/ Quality Control Reverifications - Electrical Separation."
Idt. 'fication of any additional deficiencies and associated rework will be 1
completed comensurate with the system / area turnover schedule.
i I
Very truly yours, (A),0. A W. G. Counsil t
V 88092603:85 090914 B-
- E R. Woodlan l
p.1 ADocK o 5
Docket Licensing Manager WJH/mlh l
c-Mr. R. D. Martin, Region IV j
Resident Inspectors, CPSES (3)
)
T6 U
(
- 0 North 0% 5treet LB St De&u. Tezes 73NI
\\
,